36C26226Q0434 0001.docx

DOCX document 20 KB Posted

Attached to
R425--STORMWATER MANAGEMENT PLAN -Base w/WD FITARA EXEMPT
Solicitation number
36C26226Q0434
Issued by

About this file

This is Amendment One to Solicitation 36C26226Q0434, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 (NCO 22 - Mesa Annex) on April 1, 2026, responding to vendor questions regarding the Stormwater Compliance Management Service requirement. The amendment extends the question submission deadline to April 6, 2026, at 1:00 PM MST and the offer submission deadline to April 9, 2026, at 1:00 PM MST. All offers must be submitted via email to Felicia Simpson, Contract Specialist at Felicia.Simpson@va.gov.

The amendment clarifies four key points from vendor inquiries: (1) cost proposals for base stormwater compliance services (line items 0001, 1001, 2001, 3001, and 4001) must include costs for option years; (2) contingent scope costs for TMDL monitoring should be included in estimates despite future bilateral modification, as the 2013 Small MS4 Permit reissuance makes this foreseeable; (3) Miscellaneous/Emergency line items (0002, 1002, 2002, 3002, and 4002) are included in all VA solicitations but not necessarily indicative of guaranteed funding; and (4) technical proposals must include a response to contingent TMDL monitoring requirements, which will become active upon implementation of Section G4.9.1 of the California State Water Resources Control Board's Phase II Small MS4 General Permit (informal draft dated July 2024). All offerors must submit complete documentation from Section E and acknowledge all amendments; failure to do so will result in non-acceptance of the offer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-01-2026 664-26-3-5457-0107 None 36C262

NCO 22

Department of Veterans Affairs NCO 22 - Mesa Annex 4135 S. Power Rd #103 RM 116 Mesa

AZ

85212 36C262

NCO 22

Department of Veterans Affairs NCO 22 - Mesa Annex 4135 S. Power Rd #103 RM 116 Mesa

AZ

85212 To all Offerors/Bidders

TBD

36C26226Q0434 03-18-2026

X X X X The purpose for this amendment is to respond to questions received from a vendor.

All questions are due NLT April 6, 2026, at 1:00 PM MST. All offers are due NLT April 9, 2026, at 1:00 PM MST.

Offerors shall be submitted via email to: Felicia Simpson, Contract Specialist at Felicia.Simpson@va.gov.

Contractor shall sign clause 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) pg 29 of the solicitation.

ALL OFFERS SHALL SUBMIT ALL DOCUMENTATION UNDER SECTION E and all AMENDMENTS, failure to provide any required document and acknowledgment of all amendments will result in the offer not being accepted and will not be evaluated.

CONTINUATION PAGE

Questions 36C26226Q434_2, Stormwater Compliance Management Service

1. The scope of work has the base stormwater compliance services, which will be items 0001, 1001, 2001, 3001, and 4001 in the cost proposal. Can you please confirm that only the cost for the base stormwater compliance services should be included in these cost line items?

ANSWER: No, you must provide cost for the option years as well.

1. There is also a contingent scope of work for TMDL monitoring. But it states that it will be memorialized in a bilateral modification to the contract. So, I believe that no cost for the contingent TMDL monitoring needs to be submitted at this time. Can you please confirm that no costs for the contingent TMDL scope of work need to be submitted at this time?

ANSWER: The 2013 Small MS4 Permit is being reissued. An informal draft is available for review. See the Small MS4 Reissuance Page for details. Since the contingency scope is likely to be needed and originates from presently known and existing conditions, the effects of which are foreseeable within reasonable limits of accuracy, it should be included in the estimates of future costs so as to provide the best estimate of performance cost.

1. In the cost proposal, there are Miscellaneous / Emergency line items. Items 0002, 1002, 2002, 3002, and 4002. However, I do not see direction in the scope of work as to what might be included in these line items. Can you please clarify what scope should be included in the Miscellaneous / Emergency items? Or if a set amount of funds (e.g. $10,000/year) be included in these line items?

ANSWER: We put this CLIN in all our solicitations, not necessarily meaning there will be an emergency.

1. In the technical proposal, does VASDHCS want a technical approach / response to the contingent TMDL monitoring, or just to acknowledge and accept it may be required?

ANSWER: Yes, it should be included. The requirements will become active upon implementation of Section G4.9.1 of the California State Water Resources Control Board’s Phase II Small MS4 General Permit as outlined in the informal draft dated July 2024.

AMENDMENT ONE RESPONDING TO QUESTIONS