This is Appendix VII, an Underground Storage Tank Secondary Containment Testing Report Form used by California to document compliance testing of secondary containment systems for underground storage tanks.

The form documents a 36-month inspection conducted on May 19, 2023, at Jerry Pettis Memorial Veterans Hospital in Loma Linda, California (CERS ID 10040881). Western Pump, Inc. performed the testing, with service technician Agustin Garcia (License #673853, ICC #8032748 expiring 8/19/2024) conducting the work. The technician held Franklin Fueling Level IV certification expiring 2/23/2025. Testing included three XERXES tanks (T1, T2, T3) each with 20,000-gallon capacity and secondary containment sump systems with depths ranging from 66 to 74 inches. Tank secondary containment was tested using vacuum method with a 4" diameter glycerin-filled vacuum gauge. All three tanks passed testing with zero change in readings and zero pass/fail criteria threshold. Piping secondary containment included six piping runs (T1 Supply, T1 Return, T2 Supply, T2 Return, T3 Supply, T3 Return) manufactured by Smith, tested using pressure method with 0-15 PSI glycerin-filled pressure gauge. All piping passed with zero change in readings. Sump/UDC testing used INCON TS-STS Sump Tester equipment on three fill sumps (T1, T2, T3), all manufactured by XERXES and all passing hydrostatic testing with minimal changes in readings (+0.0001 to +0.0004 inches) within acceptable criteria of +/-0.002 inches. Supporting documentation including test photographs was attached per California Code of Regulations Title 23, Division 3, Chapter 16, Section 2637. The report was signed February 1, 2022, with four total pages.

View the file

Other files

File Type Posted
2025 0513 - Loma Linda VA Hospital AMC.pdf PDF
2024 0520 - Loma Linda VA Hospital OPE..pdf PDF
36C26226Q0125_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, TYPE OF ACTION Installation Repair 6 Month 36 Month

CERS ID

Test Date

Facility Name

Facility Address

City

ZIP Code

Company Performing the Test

Phone

Mailing Address

Service Technician Performing Test

Contractor/Tank Tester License Number

ICC Number

ICC Expiration Date

Manufacturer and Test Equipment Training Certifications Expiration Date

Test Procedures Used Components Tested

I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority.

Service Technician Signature Date

Total # of Pages

1. FACILITY INFORMATION

2. SERVICE TECHNICIAN INFORMATION

3. TRAINING AND CERTIFICATIONS

4. TEST PROCEDURE INFORMATION

5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST

(619) 239-9988

All tests the COMMENTS section.

Test Method Developed by Manufacturer Industry Standard Professional Engineer

Test Type Pressure Vacuum Hydrostatic

Test Equipment Used:

Tank ID Tank Manufacturer

Tank Capacity

Test Start Time

Initial Reading

Test End Time

Final Reading

Change in Reading

Pass/Fail Criteria

Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail

Test Method Developed by Manufacturer Industry Standard Professional Engineer

Test Type Pressure Vacuum Hydrostatic

Test Equipment Used:

Pipe Run ID Pipe Manufacturer

Test Start Time

Initial Reading

Test End Time

Final Reading

Change in Reading

Pass/Fail Criteria

Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail

Pipe Run ID Pipe Manufacturer

Test Start Time

Initial Reading

Test End Time

Final Reading

Change in Reading

Pass/Fail Criteria

Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail

Additional copies of this page may be attached.

6. TANK SECONDARY CONTAINMENT TEST

7. PIPE SECONDARY CONTAINMENT TEST

Test Method Developed by Manufacturer Industry Standard Professional Engineer

Test Type Pressure Vacuum Hydrostatic

Test Equipment Used:

Sump/UDC ID

Sump Manufacturer

Sump Depth (inches)

Sump Bottom to Top of Highest Pipe Penetration (inches)

Test Start Time

Initial Reading

Test End Time

Final Reading

Change in Reading

Pass/Fail Criteria

Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail

Sump/UDC ID

Sump Manufacturer

Sump Depth (inches)

Sump Bottom to Top of Highest Pipe Penetration (inches)

Test Start Time

Initial Reading

Test End Time

Final Reading

Change in Reading

Pass/Fail Criteria

Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail

Additional copies of this page may be attached.

8. SUMP/UDC TEST

INCON TS-STS SUMP TESTER +/-0.0001

+0.0004

9. COMMENTS