VALB Cooling Tower Pictures.pdf
PDF 6 MB Posted
- Solicitation number
- 36C26226Q0021
About this file
This document is a technical specification for VA Long Beach Cooling Tower Disinfection Services scheduled for 10/7/2025. The equipment list details six cooling towers across two buildings (5A and 138), manufactured by Ceramic Cooling Tower Co. and Baltimore Aircoil Company (BAC). The towers include four CT-20X20-400C models in Building 5A with serial number CT-1812, and two FXT-068 models in Building 138 with serial numbers U134691002-01 and U134691003-01. The document includes comprehensive photographic documentation of access points and equipment locations, showing detailed interior and exterior views of the cooling tower systems, with control point images revealing water flow and structural configurations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Long Beach Cooling Tower
Disinfection Services
10/7/2025
Equipment List
Control Point ID Bldg. Manufacturer Model SN
1 5A-CT-1 5A Ceramic Cooling Tower Co. CT-20X20-400C CT-1812
2 5A-CT-2 5A Ceramic Cooling Tower Co. CT-20X20-400C CT-1812
3 5A-CT-3 5A Ceramic Cooling Tower Co. CT-20X20-400C CT-1812
4 5A-CT-4 5A Ceramic Cooling Tower Co. CT-20X20-400C CT-1812
5 138-CT-1 138 BAC FXT-068 U134691002-01
6 138-CT-2 138 BAC FXT-068 U134691003-01
Control Point 1-4
85 feet
Bottom Access Control Point 1-4
Roof Access Control Point 1-4
Control Point 1
Control Point 2
Control Point 3
Control Point 4
Control Point 5,6
| VALB Cooling Tower Cleaning RFI |
| Equipment List |
| Control Point 1-4 |
| Bottom Access Control Point 1-4 |
| Roof Access Control Point 1-4 |
| Control Point 1 |
| Control Point 2 |
| Control Point 3 |
| Control Point 4 |
| Control Point 5,6 |
File details come from the government source that posted it. Updated .