This is an Emergency Power Single Line Diagram for the San Diego VA Medical Center's Seismic Deficiency project, detailing the electrical infrastructure for multiple buildings. The document shows a comprehensive electrical distribution plan featuring new emergency diesel generators, switchgear, and power distribution systems across four primary locations: New SCI Building, Main Hospital Building #1, Power Plant Building #2, and a Parking Structure. Key components include a new 1500kW/1875kVA emergency diesel generator, multiple automatic transfer switches with different priority levels, and switchboards rated at 480/277V with varying amperage capacities. The total connected load is approximately 3,077 KVA, with detailed breakdowns for each building's power requirements, including specific allocations for critical, life safety, and equipment branches. The diagram also includes provisions for a fire pump, jockey pump, and a spare portable generator, demonstrating a robust emergency power design that ensures continuous electrical service across the medical center's critical infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C26225Q1505 Amendment 0003.docx | DOCX document | |
| Diagram 1 Electrical Primary Singleline.pdf | ||
| S06 36C26225Q1505 Amendment 0002.docx | DOCX document | |
| S06 36C26225Q1505 Amendment 0001.docx | DOCX document | |
| W-9 Form.pdf | ||
| S02 36C26225Q1505_1 Solicitation.docx | DOCX document | |
| VA10091.pdf | ||
| FMS Vendor File Update Request Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1EP604
EMERGENCY POWER SINGLE LINE
DIAGRAM - NEW WORK
Drawing Title
Approved: Project Director
Project Title
Date
Location
Reviewed
Building Number
Project Number
Drawing Number
Revisions:
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Facilities
Management o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
D
1 2 3 4 5 6
C
B
A
9/
/2
2:
:3
PM
C :\U se rs
\lb eh ba ha ni \D oc um en ts
\V A
_S C
I-A
_4
_l be hb ah an i.r vt
SEISMIC DEFICIENCY -
SCI & CLC HOSPITAL
3350 LA JOLLA VILLAGE DR.
SAN DIEGO, CA 92037
10/31/2020Project No. 0214.105.00
Pasadena, California 91101 PKone: 626.463.2800 Fa[: 626.463.2801
300 N. LaNe Avenue, 14tK Floor
. STRUCTURAL
ELECTRICAL
MECHANICAL
CIVIL
www.ttgcorp.com
MT A D
T YA LOR &
G A I N E S
. EBA
S
I
TA
E
T S
L
NEC C
N
O
CFO FILA
R
AI
T
I
CRADE H
ET
REN.: 10-31-21
NO. C-28367
DAVID HUNT
664-401
(949) 250-1500
656 FIFTH AVENUE STE 'A'
SAN DIEGO CA 92101
10/31/20CONFORMED SET
Date
03/29/22
KEY NOTES
NEW 1500KW/1875KVA 480/277V, 3PH, 4W EMERGENCY DIESEL
GENERATOR.
NEW FDR IN EXPOSED CONDUIT. SEE DWG 1EP606 FOR FDR SCHED.
NEW 6,000A, 480/277V, 3PH, 4W EMERGENCY SWITCHGEAR ECGS
NEW FDR IN EXISTING UGND DUCTBANK. SEE DWG 1EP606 FDR SCHED
NEW FDR IN UGND DUCTBANK. SEE DWG 1EP606 FOR FDR SCHED.
NEW 3000A, 480/277V, 3PH, 4W SWITCHBOARD.
NEW 1200A, 480/277V, 3PH, 4W SWITCHBOARD.
NEW TEMPORARY EMERGENCY GENERATOR. GENERATOR WILL BE
PROVIDED FOR THE ENTIRE CONSTRUCTION PERIOD UNTIL FULLY
FUNCTIONAL MAIN EMERGENCY SWITCHGEAR AND GENERATORS ARE
INSTALLED.
4 SETS (4"C, 4 #500KCMIL + 1 #3/0 EG.)
6 SETS (4"C, 4 #600KCMIL + 1 #350KCMIL EG.)
SEE SHEET 1EP605 FOR BLDG 2 EMERGENCY POWER SINGLE LINE
DIAGRAM.
SEE SHEET 1EP606 FOR BLDG 11 EMERGENCY POWER SINGLE LINE
DIAGRAM.
SEE VOLUME 2G, SHEET 1EP401 FOR NEW SCI BUILDING EMERGENCY
POWER SINGLE LINE DIAGRAM.
NEW 2500A, 480/277V, 3PH, 4W MANUAL TRANSFER SWITCH.
NEW 2000A, 480/277V, 3PH, 4W EMERGENCY GENERATOR
SWITCHBOARD, NEMA 4X.
E NL E NL E NL
ATS-9-528
EQUIP
BRANCH
PRIORITY 1
ATS-10-524
EQUIP
BRANCH
PRIORITY 1
ATS-CG
EQUIP
BRANCH
PRIORITY 3
ATS-14-EQUIP
BRANCH
PRIORITY 3
E NL
DEQB DE2 DEQA MCC-CG
4P 800A
4P 225A
3P 800A
3P 600A
POWER PLANT BLDG NO 2
3P
400AT
800AF
3P
400AT
800AF
3P
225AT
800AF
3P
600AT
800AF
D
EQ
B
D E2
D E2
A
M C
C -C
G
ATS-14 ATS-10 ATS-9 ATS-CG
EG1EG2EG3EG4
3P
2500AT
3200AF
3P
2500AT
3200AF
3P
2500AT
3200AF
3P
2500AT
3200AF
3P
1200AT
1600AF
3P
2500AT
3200AF
G G G G
3P
400AT
800AF
E NL
(N) ATS-EQ1
PRIORITY 3
3P
2500AT
2500AF2500A, 480/277V, 3P, 4W
(N) SWBD "ESWDB"
E NL
(N) ATS-EQ2
PRIORITY 3
E NL
(N) ATS-EQ3
PRIORITY 3
E NL
(N) ATS-CR
PRIORITY 1
700A 3P
E NL
(N) MTS-SB
800A 3P
400A 3P
800A 3P
800A 3P
800A 3P
NEW SCI BLDG.
E NL
(E) ATS-15(PARKING)
4P 400A
PARKING STRUCTURE
USS1
K
K
K
K
K
K
K
K
3000A, 480/277V, 3P, 4W, 65KAIC, NEMA 3R
3P
600AT
800AF
65KA
4P
225AT
800AF
65KA4P
400AT
800AF
65KA
4P
400AT
800AF
65KA
SWBD-EPG2
3P
400AT
800AF
65KA
3P
400AT
800AF
65KA4P
225AT
800AF
65KA
3P
600AT
800AF
65KA
K
K 4P
400AT
800AF
65KA
4P
400AT
800AF
65KA
ATS-14 ATS-CGATS-9ATS-10 SPARE
PORTABLE
GENERATOR PG1
2000KW,2500KVA
480V/277V,3PH,4W
GE8
EPGSCI,2000A 480Y/277V,4P NEMA 4X
SERVICE RATED GENERATOR QUICK
CONNECT SWITCHBOARD
TERMINAL STRIP FOR
ATS CONTROL WIRES
AMP = 783
KVA = 651
AMP = 366
KVA = 304
AMP = 48
KVA = 39
AMP = 123
KVA = 102
AMP = 140
KVA = 117
CONNECTED KVA = 1911
CONNECTED AMP = 2298
CONNECTED KVA = 1127
CONNECTED AMP = 1355
CONNECTED KVA = 127
CONNECTED AMP = 153
16 SEE DWG EP601 OF VOL 2G FOR COMPLETE INFORMATION
4-500KCMIL AND 1 #2 EG IN 4"C
PROVIDE LOCKABLE "ON" POSITION BRANCH CIRCUIT BREAKER.
NEW 2-1/2"C WITH 3# 4/0 , 1#6 EG. PROVIDE 3" CONCRETE ENCASEMENT
AROUND CONDUIT OR (USE APPROVED CONDUCTORS FOR FIRE PUMP
APPLICATION).
FIRE PUMP EQUIPMENT INSTALLATION SHALL COMPLY WITH N.E.C. ARTICLE
695 REQUIREMENTS.
EXISTING FEEDER TO REMAIN.
TO ESWDB FOR CONTINUATION, SEE SHEET EP601.
TO 'USS2' VIA 700AT, 800AF ENCLOSED BREAKER, FOR CONTINUATION SEE
EP601.
READINGS WERE OBTAINED FROM THE BMS SYSTEM ON 10/23. A POWER
FACTOR OF 0.8 WAS APPLIED, AND AN ADDITIONAL 1.25% WAS INCLUDED
BASED ON NEC 220.87.
NO DATA WAS AVAILABLE FOR ATS-18 AT THE TIME WHEN DATA WAS
GATHERED ON 26 OCTOBER 2023.
E NL
(N) ATS-LS
PRIORITY 1
Isc = 60407 AMPS
Isc = 58122 AMPS
Isc = 32854 AMPS
(TYP)
X
3P
400AT
800AF
3P
2500AT
3200AF
LOAD BANK
3P
700AT
800AF
FIRE PUMP
75HP, 480V,3Ø
JOCKEY PUMP
7.5HP, 480V,3Ø
FIRE PUMP CONTROLLER WITH
AUTOMATIC TRANSFER SWITCH
100KAIC (PART OF FIRE PUMP
PACKAGE).
1"C, 3#12, 1#12
EG 20
1"C, 3#12, 1#12EG
20 COMBINATION DISC.
SWITCH AND MOTOR
CONTROLLER, 100KAIC.
(PART OF JOCKEY PUMP
PACKAGE)
20 19
21 21 21 21
SWITCH
1 2 3 4 5 6
MANUAL
TRANSFER
'MTS'
1 2 3 4 5
SPARE
04/07/22
RFI 0724
05/10/22
RFI 0736
20 19
11SCI BLDG NO 11
REFER TO EP606
X-RAY
(E) SWBD-EDA
1 3P
60AT
100AF
600A, 480/277V, 3P, 4W, 25KAIC
TERMINAL STRIP FOR
ATS CONTROL WIRES
G
PORTABLE
GENERATOR
PG11
800KW
1000KVA
480/277V,3PH,4W
21 21
PORTABLE
GENERATOR
PG1
(N) EGCS (EMERGENCY GENERATOR CONTROL SWITCHGEAR)NEW SECTION
PROVISION FOR
TIE-BREAKER
2000KW
2500KVA
480V/277,3PH,4W
6,000A, 480/277V, 3P, 4W, 100KAIC
3P
800AT
800AF
3P
100AT
100AF
3P 3P
60AT
100AF
3P
600AT
600AF
3P
5000AT
6000AF
3000AT
3200AF
K
K
3P
800AT
800AF
65KA
SWBD-EPG11
SPARE
1200A, 480/277V, 3P, 4W, 65KAIC, NEMA 3R
ATS-3
3P
800AT
800AF
65KA
K
K
3P
100AT
100AF
65KA
3P
100AT
100AF
65KA
K
K
3P
60AT
100AF
65KA
ATS-1
3P
60AT
100AF
65KA
K
K
3P
600AT
600AF
65KA
Isc = 550677 AMPS
EDA
3P
600AT
600AF
65KA
G
G
4P 3000A
K
AMP = 556
KVA = 462
TERMINAL STRIP FOR
(N)SWBD EPG1
2 3P
400AT
400AF
3 3P
100AT
100AF
3P
600AT
1200AF
4 3P
300AT
400AF
E
(E)ATS-02-521
EQUIP
BRANCH
PRIORITY 4
3P 400A
L N
AMP = 153
KVA = 127
E
(E)ATS-04-523
EQUIP
BRANCH
PRIORITY 3
3P 400A
L N
AMP = 84
KVA = 70
E
(E)ATS-01-520
LS BRANCH
PRIORITY 1
3P 260A
L N
AMP = 8
KVA = 6
E
(E)ATS-03-522
CRITICAL
BRANCH
PRIORITY 1
3P 260A
L N
AMP = 6
KVA = 5
EDM (EQUIP) EDB (LS)
CRITICAL
MAIN HOSPITAL BLDG NO 1
PRIORITY 3
"DISCONNECT MTS-SB"
1200A, 480/277V,3PH,42KA
SERVICE RATED FUSED
DISCONNECT
2000AT
2000AF
(12) EXISTING 4"
CONDUITS TO
REMAIN
EXISTING TAP BOX
NEW 3000A BUS
DUCT TO INTERCEPT
EXISTING
NEW BUS DUCT TAP
BOX
RFI 0591
RFI 0607
RFI 0322
08/09/22 08/12/22
SPACE
EXISTING BUS DUCT
TO EGCS
5004 RFI 5004 09/14/22
843843
843 843
0843 RFI 0843 11/22/22
84310871087
1087 RFI 1087 11/20/23
SEQUENCE OF OPERATION :
· TIE BREAKER IS NORMALLY OPEN
· UTILITY LOSS
· GENERATOR EG1, EG2, EG3, AND EG4 START
· THE FIRST GENERATOR BETWEEN EG1, EG2, CLOSE TO THE SPLIT BUS.
· THE FIRST GENERATOR BETWEEN EG3, EG4, CLOSE TO THE SPLIT BUS.
· LIFE SAFETY AND CRITICAL ATS LOADS TRANSFER TO EMERGENCY.
· THE SECOND GENERATOR ON EACH SIDE OF THE TIE BREAKER SYNCHRONIZE AND CLOSE TO
THE BUS.
· EQUIPMENT AND ALL THE ATS SWITCH LOADS TO EMERGENCY.
· TIE BREAKER REMAINS OPEN.
· THE FAILURE OR "OPEN" STATUS OF ANY GENERATOR BREAKER INITIATES A SYNCHRONIZATION
BETWEEN BUS EGCS(A) AND EGCS(B).
LOAD SHEDDING SEQUENCE :
EGCS(A) :
1. ATS-02-521
2. ATS-8-527
3. ATS-04-523
4. ATS-11
5. ATS-13-378
6. ATS-7-526
7. ATS-14
8. ATS-18
EGCS(B) :
1. ATS - PARKING
2. ATS - EQ1
3. ATS - EQ2
4. ATS - EQ3
· TIE BREAKER CLOSES
· LOADS SHARED BETWEEN THREE GENERATORS
BUILDING NAME
POWER PLANT BUILDING #2
MAIN HOSPITAL BUILDING #1
SCI BUILDING #11
TOTAL KVA
KVA
EGSC-A ( PRIORITY 1)
ATS - 10 (EPG2)
ATS - 1 (EPG11)
ATS - 3 (EPG11)
TOTAL KVA
KVA
EGSC-B (PRIORITY 1 )
ATS - LS (ESWDB)
TOTAL KVA
ATS - CR (ESWDB)
KVA
ATS - 12 (EPG1)
ATS - 5 (EPG1)
ATS - 6 (EPG1)
EGSC - B EGSC - A
BUILDING NAME
NEW PARKING STRUCTURE (CONNECTED LOAD)
NEW SCI BUILDING (177,000 SQFT X 6.25 VA)
TOTAL KVA
KVA
EGSC - AEGSC - B
PRIORITY 1
1600A, 480/277V, 3P, 4W, 65KAIC
SPARE
3P
800AT
800AF
65KA
SPARE
3P
800AT
800AF
65KA
KVA =188
AMP =226
E
(E)ATS-17
CRITICAL
PRIORITY 1
4P 800A
L N
BRANCH
KVA =90
AMP =108
E
(E)ATS-16
CRITICAL
PRIORITY 1
4P 800A
L N
BRANCH
3P
800AT
800AF
65KA
3P
800AT
800AF
65KA
KVA =245
AMP =295
E
(E)ATS-12
CRITICAL
PRIORITY 1
4P 800A
L N
BRANCH
KVA =304
AMP =366
E
(E)ATS-5
CRITICAL
PRIORITY 1
4P 800A
L N
BRANCH
3P
800AT
800AF
65KA
3P
800AT
800AF
65KA
KVA = 145
AMP =174
E
(E)ATS-6
LIFE SAFETY
PRIORITY 1
4P 400A
L N
BRANCH
3P
400AT
400AF
65KA
(E)CEM3 (E)DPEC (E)CEM2 (E)CEM1-532 (E)SWBD EM
(N) SWBD EPCL1
2500A, 480/277V, 3P, 4W, 65KAIC
SPARE
3P
800AT
800AF
65KA
SPARE
3P
800AT
800AF
65KA
KVA =
AMP =
E
(N)ATS-18
EQUIPMENT
PRIORITY 3
4P 800A
L N
BRANCH
KVA =233
AMP =280
E
(E)ATS-13
PRIORITY 3
4P 800A
L N
BRANCH
3P
800AT
800AF
65KA
3P
800AT
800AF
65KA
KVA =404
AMP =486
E
(E)ATS-11
PRIORITY 3
4P 800A
L N
BRANCH
KVA =284
AMP =342
E
(E)ATS-7
PRIORITY 3
4P 800A
L N
BRANCH
3P
800AT
800AF
65KA
3P
800AT
800AF
65KA
3P
800AT
800AF
65KA
(N)SWBD D (E)DEQ4 (E)DEQ6 (E)DEQ 2
(N) SWBD EPEE1
EQUIPMENT EQUIPMENT EQUIPMENT
KVA =414
AMP =498
E
(E)ATS-8
PRIORITY 3
4P 800A
L N
BRANCH
(E)DEQ 1
EQUIPMENT
4P
2500AT
100KA
2500AF
4P
1600AT
100KA
1600AF
3200A BUS, 480/277V, 3PH, 4W, 100KAIC
ATS - 17 (EPG1) 188
ATS - 16 (EPG1) 91
GENERAL NOTE
1. EXISTING HIGHEST DEMAND DATA WERE GATHERED ON 26 OCTOBER 2023
FROM SAN DIEGO VA MEDICAL ENERGY MONITORING SYSTEM.
(E) ATS-15 (PARKING) 34 FIRE PUMP & JOCKEY PUMP 85
CA-1169 01/03/241169
1169 1169
FIRE PUMP & JOCKEY PUMP 85
Matt.M.Samar Text Box Total Emergency load: 1319 KVA +3077 KVA = 4,396 KVA 3 x 1,875 KVA (Gen size) = 5,625 KVA