This document is a Standard Form 30 amendment to a federal solicitation for the VA Loma Linda Healthcare System's Steam Trap and Batteries Replacement project. The amendment extends the proposal submission deadline to June 30, 2025 at 11:00am MDT and modifies the Statement of Work to correct licensing and experience requirements. The contract involves surveying and replacing batteries for 230 steam traps in the facility's Armstrong SAGE management system, with the goal of enhancing operational efficiency, safety, and equipment longevity.

The contract period of performance is from August 1, 2025 to July 30, 2026. Key contractor responsibilities include conducting a comprehensive inspection of all steam traps, documenting findings, replacing batteries, performing functionality tests, and providing a report to the plumbing supervisor. The contractor must comply with OSHA regulations, VA safety protocols, and environmental guidelines for battery disposal. The work will be performed primarily during normal business hours (Monday-Friday, 8:00am to 4:30pm Pacific time) with potential for approved alternate hours.

View the file

Other files

File Type Posted
S02 36C26225Q0974 Steam Trap Battery Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 7

0001 06-24-2025

36C262

Department of Veterans Affairs

NCO22

New Mexico VA Health Care System 1501 San Pedro Drive SE Albuquerque NM 87108

36C262

Department of Veterans Affairs

NCO22

New Mexico VA Health Care System 1501 San Pedro Drive SE Albuquerque NM 87108

To all Offerors/Bidders

36C26225Q0974

06-05-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 06-30-2025 11:00am MDT

X

The purpose of this amendment is to correct the SOW to reflect properly licensing and experience needed.

See SOW for highlighted changes.

The Q&A period has officially closed.

The due date for offers has been extended to 30 June 2025 at 11:00am MDT

Jordan Alonzo Contracting Specialist

STATEMENT OF WORK (UPDATED 06/24/2025)

1. Contract Title

VA Loma Linda Healthcare System’s (VALLHCS) Steam Trap/ Batteries Replacement

2. Background VALLHCS is dedicated to maintaining the functionality and safety of its facilities to provide high quality service to veterans. Steam system is a critical component of these facilities, serving as the backbone for heating, sterilization, and various operation processes. The facility currently utilizes 230 steam traps on the Armstrong SAGE management system to regulate steam distribution and prevent energy losses. Routine maintenance is essential to ensure theses steam traps operate efficiently and reliable. The Va seeks to undertake a proactive maintenance effort that includes a comprehensive survey of all stream traps and replacement of their batteries to optimize system performance and reduce energy cost.

3. Objective The primary objective of this contract is to enhance the operational efficiency, safety, and longevity of the facility’s Armstrong SAGE steam system. By surveying all 230 steam traps and replacing their batteries the VHALLC aims to identify issues, ensure reliability, minimize energy loss, maintain safety standards, and prolong equipment lifespan.

4. SCOPE:

Contractor shall provide all labor, materials, tools, equipment, required parts, and supervision to conduct steam trap survey, replace 230 batteries on current steam traps, Contractor shall provide report to plumbing supervisor to update SAGE utility management system.

4.1 SPECIFIC REQUIREMENTS:

Survey of Existing Steam Traps:

• Contractor shall conduct a detailed inspection of all 230 steam traps to assess their condition.

• Contractor shall document findings including operational status, type, location, and any identified issues.

• Contractor shall prepare a comprehensive report with recommendations for maintenance or upgrades.

Battery Replacement:

• Contractor shall replace batteries in all 230 steam traps with compatible and approved replacement.

• Contractor shall perform functionality tests on each steam trap post-replacement to ensure proper operation.

• Contractor shall dispose of old batteries in accordance with local, state, and federal environmental regulations.

Quality Assurance and testing:

• Contractor shall perform testing of all steam traps to validate their performance.

• Contractor shall provide a quality assurance checklist for each steam trap to document successful completion of task.

Safety and Compliance

• Contractor shall fallow OSHA regulations and VA safety protocols during all phases of the project.

• Contractor shall adherer to federal guidelines for handling disposing of hazardous materials.

Licensing Requirements

• Armstrong Steam and Condensate Authorization Service Letter or other proof of similar work and liscensing

4.2 Services Not Covered:

4.2.1. Any work other than as specified in the contract shall be identified as a non-priced task, and if determined by the Contracting Officer (CO) to be within the overall scope of the contract, work shall be added by a modification to the contract. Any work requested that is identified as outside the scope of the contract shall be addressed by the facility as a separate procurement.

5. Security Requirements The C&A requirements do not apply, and Security Accreditation Package is not required.

This service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.

6. Data Rights:

6.1. The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

7. Period of Performance Work Hours

Normal hours of operation are Monday through Friday from 8:00 am to 4:30 pm Pacific time. All work is expected to be performed generally during normal hours of coverage unless requested or approved by the COR or his/her designee.

Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.

Work performed outside the normal hours of coverage must be approved by the COR or his/her designee.

All time shall be approved in advance by the Contracting Officer’s Representative (COR). Allow 5-days for approval of any alternate working hours needed.

Federal Holidays

New Year’s Day January 01 Martin Luther King’s Birthday Third Monday in January

President’s Day Third Monday in February

Memorial Day Last Monday in May Juneteenth June 19

Independence Day July 04 Labor Day First Monday in September

Columbus Day Second Monday in October Veterans Day November 11

Thanksgiving Day Fourth Thursday in November Christmas Day December 25

If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.

8. Identification, Check-in, Parking, and Smoking Regulations Identification

The vendor's employees shall wear visible identification at all times while on VALLHCS premises. Contractor employees shall report to VA Police upon entry to the VALLHCS facility to get a visitor badge. Contractor employees are required to be escorted by the COR or designee’s office once on campus prior to commencement of work. During emergencies contractor personnel shall check in with VALLHCS Police if the VALLHCS COR or designee is not available.

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

Parking

It is the responsibility of the contract personnel to park in the appropriate designated parking areas. Parking information is available from VA Police & Security Service Office.

The Contractor assumes full responsibility for any parking violations.

Smoking

Veterans Health Administration (VHA) Directive 1085, dated March 5, 2019, provides a comprehensive smoke-free policy for patients, visitors, contractors, volunteers, and vendors, at the Department of Veterans Affairs (VA), Veterans Health Administration (VHA) health care facilities. This updated VHA directive implements a smoke-free policy for patients, visitors, contractors, volunteers, and vendors at VA health care facilities, as defined in this directive, based on scientific evidence regarding the adverse health effects of secondhand and thirdhand smoke exposures.

The Assistant Deputy Under Secretary for Health for Administrative Operations (10NA) and the Assistant Deputy Under Secretary for Health for Clinical Operations (10NC) are responsible for the contents of this directive. Questions may be referred to VHA Smoke Free: vhasmokefree@va.gov.

mailto:vhasmokefree@va.gov

This VHA directive is scheduled for recertification on or before the last working day of March 2024. This VHA directive will continue to serve as national VHA policy until it is recertified or rescinded.

Weapons and Contraband

Possession of weapons or contraband is prohibited and shall be subject to arrest and termination from future performance under this contract. Enclosed containers, including tool kits, shall be subject to search. Violations of VALLHCS regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

Safety

All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering on VALLHCS shall comply with applicable Federal, State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract.

Contractor shall perform work in strict accordance with existing relevant, accredited standards and codes to minimize the possibility of injury to personnel, or damage to Government equipment. Every effort shall be made to safeguard human life and property.

Contractor shall comply with all applicable Federal, State, and local requirements regarding workers’ health and safety. The requirements include, but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.137.

Contractor shall provide all necessary tools, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.

9. Contractor Personnel

Contractor’s Program Manager

The Contractor shall provide a contract program manager who shall be responsible for the performance of the work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor’s Program Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.

Contractor’s Employees

The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

Contract Personnel shall be subject to the same quality assurance standards or exceed current recognized national standards as established by the Joint Commission (JC).

10. Contractor Qualifications & Other Responsibilities

Contractor shall obtain all necessary licenses required to perform this work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government.

The Government reserves the right to accept or reject Contractor’s employee for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and COR with the final decision being made by the Contracting Officer.

11. Insurance Coverage The Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee’s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.

The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.

Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.

Contractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.

12. Invoicing and Payment Overtime & Holiday Pay

Any overtime and/or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.

Contractor will bill and be paid for actual services provided by Contractor personnel.

Contractor will not be paid for “availability” or “on-call” services unless otherwise provided herein.

Invoices

Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes.

The Government shall not authorize payment until such time that the VALLHCS COR all properly executed and signed documentation.

No advance payments shall be authorized. Payment shall be made on a monthly arrears for services provided during the billing month in arrears in accordance with FAR 52.212- 4, para. (i). Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.

Payment of invoices may be delayed if the appropriate invoices as specified in the contract are not completed and submitted as required.

The contract period of performance is 08/01/2025-07/30/2026.

STATEMENT OF WORK (UPDATED 06/24/2025)