This document is an amendment to a solicitation for CLC Duct Cleaning Service, Solicitation Number 36C26224Q1148. The amendment is being issued by the Department of Veterans Affairs, Veterans Integrated Service Network 22, to respond to questions from offerors. Key details include:

The amendment provides answers to questions regarding drawings, site visits, facility details such as ceiling height and number of units, and air handler requirements. It clarifies that some work may need to be performed at night and that certain areas will need to be sectioned off. Offerors are instructed to submit proposals via email to the Contract Specialist. Offerors must also sign Clause 852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction.

View the file

Other files

File Type Posted
36C26224Q1148 0003.docx DOCX document
CLC location for Parking pic1.png PNG image
CLC location for location to enter pic2.png PNG image
36C26224Q1148 0002.docx DOCX document
16_H13 - SHEET 13 OF 15 - FIRST FLOOR MECHANICAL PLAN AREA K.pdf PDF
16_H14 - SHEET 14 OF 19 - FIRST FLOOR MECHANICAL PLAN AREA L.pdf PDF
36C26224Q1148 0001.docx DOCX document
FMS Vendor File Update Request Form.pdf PDF
W-9 Form.pdf PDF
VA10091.pdf PDF
36C26224Q1148_1.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 644-24-3-224-0748 None 36C262

NCO 22

Department of Veterans Affairs NCO 22 - Network Contracting 650 East Indian School Road Phoenix AZ 85012 36C262

NCO 22

Department of Veterans Affairs NCO 22 - Network Contracting 650 East Indian School Road Phoenix AZ 85012 To all Offerors/Bidders

36C26224Q1148 06-11-2024

X

X The purpose of this amendment is to respond to questions.

Offerors shall be submitted via email to: Felicia Simpson, Contract Specialist at Felicia.Simpson@va.gov.

Contractor shall sign clause 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) pg 27 of the solicitation.

CONTINUATION PAGE

Question

1. Are there any drawings of the mechanical for this project that we can look over?

ANSWER: Drawing were provided.

2. Is it possible to upload pictures of the machine to be performed on ?

ANSWER: Pictures uploaded

3. Our subcontractor would like to perform a walkthrough of the facility so we can provide an accurate quote. Would that be possible?

ANSWER: Site Visit was June 10, 2024

4. Do you know what is the highest ceiling in the facility? 8 Ft From the SOW I understand there is 8 units total, is that correct?

ANSWER: Yes

5. We are asking about whether the air handler will be shut off during cleaning?

ANSWER: Yes; some areas will have to be done at night

6. The air handler services the second floor as well so we need to know if that is going to be included in the scope or if that’s going to need to be sectioned off?

ANSWER: Sectioned off