This document provides answers to questions regarding a solicitation for boiler plant safety device testing, calibrations, and inspections services for the Department of Veterans Affairs. The solicitation seeks periodic inspection of watertubes and refractory in boilers, with watertube inspections required every six years unless more frequent welding repairs necessitate shorter intervals. Inspections of the DA tank are required every five years according to the boiler plant directive, though the current facility has inspected it every two years due to the age of the boiler system. Quotes for the work are due by August 31, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1810_D_2023-01-04 - Boiler Plant Operations.pdf | ||
| VHA Boiler and Associated Plant Safety Device Testing Manual 7th Edition (002).pdf | ||
| RFQ 36C26223Q1604 0001.pdf | ||
| Boiler Plant Testing and Inspection Vendor Offers.docx | DOCX document | |
| 36C26223Q1604.docx | DOCX document | |
| Boiler Plant Testing and Inspection Enclosure 1 02.docx | DOCX document | |
| Boiler Plant Testing and Inspection Enclosure 2 02.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0002 36C26223Q1604 0
00262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
00262
Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815
To all Offerors/Bidders
36C26223Q1604
08-25-2023
X
X X
X
The purpose of this modification is to provide answers to questions asked in regards to the scope of work.
Please see continuation page.
All quotes are due by 08/31/2023 NLT 1600 PST.
Quotes SHALL be accepted only by following the instructions on original quote. Please submit Vendor offers and Enclosure 1 and 2 to: marco.ramos1@va.gov.
36C26223Q1604 (BOILER PLANT SAFETY DEVICE TESTING, CALIBRATIONS &
INSPECTONS)/ RFI QUESTIONS
Page 12 (first mentioned in line A of page 5) of the Combined Synopsis/Solicitation Notice, Line V.12 states:
‘Internal inspections (6-year intervals unless otherwise recommended because of welding repairs.’
Q1. What stage in this 6-year process will we fall in the cycle of this FAR agreement, and is there an exception present for an inspection regimen which is different due to unstated repairs which would present cause for inspection intervals of less than 6-year intervals?
Answer: For the current boilers, only refractory inspections have been conducted and performed. The watertubes have passed during each inspection. If the watertubes needed to have welding repairs made, then this is where the Internal Inspection for welding repairs would come into play.
Q2. If so, how often is the DA tank internal inspection required?
Answer: According to the Boiler Plant Directive (VA Directive 1810), the inspection is required every 5 years. However, we have had the DA Tank inspected at our facility every 2 years due the age of the entire boiler system.
See attached document: VHA Boiler and Associated Plant Safety Device Testing Manual 7th Edition (002).
See attached document: 1810_D_2023-01-04 - Boiler Plant Operations.