View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice Sources Sought Notice

SUBJECT*
Southern Arizona VA Health Care System Tucson -Infra-Red Inspection of Station Power System Infrastructure Performance Period 04/01/2022 - 10/01/2022

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
85723
SOLICITATION NUMBER*
36C26222Q0465
RESPONSE DATE/TIME/ZONE
03-08-2022 15:00 MOUNTAIN TIME, DENVER, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
6120
NAICS CODE*
238210
CONTRACTING OFFICE ADDRESS
Freddy Osuna

Department of Veterans Affairs NCO 22 - Network Contracting 3601 S. 6th Avenue Tucson AZ 85723

POINT OF CONTACT*

Contracting Specialist Freddy Osuna freddy.osuna@va.gov (520)629-1711

PLACE OF PERFORMANCE

ADDRESS
Southern Arizona VA Health Care System

Department of Veterans Affairs

NCO 22 - Network Contracting

3601 S. 6th Avenue

Tucson AZ

POSTAL CODE
85723
COUNTRY
United States

ADDITIONAL INFORMATION

AGENCY’S URL
https://sam.gov/content/home
URL DESCRIPTION
Contract Opportunities
AGENCY CONTACT’S EMAIL ADDRESS
Freddy.Osuna@va.gov
EMAIL DESCRIPTION
Contract Specialist

DESCRIPTION

The Southern Arizona VA Health Care System (SAVAHCS) in Tucson, AZ utilizes 13.8kV distribution with 47 pad mounted distribution transformers to electrical panels from 2 independent utility entrances: Fair Street Sub (primary feed w/11195 A) and Drexel Sub (secondary feed w/4153 A). Including seventeen (17) backup generators for emergency power, and an extensive photovoltaic (PV) solar power system.

The purpose of this work is to supply the necessary resources to complete the required inspection and testing of the Southern Arizona Veterans Health Care System electrical power distribution system as required by the most recent VHA directive 1028. Work will include infra-red (I-R) or thermal testing/viewing/inspection of the facility’s power system infrastructure, recording the results of the tests and inspections, and developing a comprehensive report of all findings with recommendations on any equipment not meeting standards of the testing/inspections/maintenance based on the documents provided to awardee. The performance period for this contract will be 180 days.

*= Required Field
Sources Sought Notice

Sources Sought Notice

File details come from the government source that posted it. Updated .