S05 RFI001 for 36C26222Q0076.docx

DOCX document 17 KB Posted

Attached to
J045--DEAERATOR (DA) QUALIFIED PROFESSIONAL INSPECTION
Solicitation number
36C26222Q0076
Issued by

View the file

Other files

File Type Posted
36C26222Q0076 0002_1.docx DOCX document
Job Walk sign-in sheet.pdf PDF
VHA DIRECTIVE 1810.pdf PDF
36C26222Q0076 0001_1.docx DOCX document
36C26222Q0076.docx DOCX document
Deaerator Inspection Enclosure 2.docx DOCX document
Deaerator Inspection Enclosure 1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI FORM

Contractor Name:

Address:

Phone/Fax:

Send to: Ositadima.ndubizu@va.gov
RFI

(REQUEST FOR INFORMATION)

PROJECT NO.:

RFI NO.:
001

PROJECT NAME:

SERVICE to PERFORM DEAERATOR (DA) QUALIFIED PROFESSIONAL INSPECTION, VA Long Beach
DATE REQUESTED:
11/9/2021

SOLICITATION NO.:

36C26222Q0076
REFERENCE:

DRAWING:

SPECIFICATION

SECTION:

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Please be specific as possible:

1. Who is handling “The Authorized Inspector Portion”?

2. Can Applus have a copy of VHA DIRECTIVE 1810?

3. Is Applus responsible for sub-contracting the safety valve and industrial portion of inspection?

PROJECT MANAGER’S RESPONSE

1. Contractor is responsible for providing Qualified Professional Inspector (QPI) in accordance with VHA Directive 1810. Test must be conducted under supervision of QPI and proof of qualifications must be provided with bid. Refer to Personnel Qualification Requirements

2. See Attached

3. All inspection service detailed in the SOW is the responsibility of the Contractor.

AMENDMENT NO.:

VA PROJECT ENGINEER/MANAGER:

DATE:

x/xx/2020

File details come from the government source that posted it. Updated .