S05 RFI001 for 36C26222Q0076.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C26222Q0076
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26222Q0076 0002_1.docx | DOCX document | |
| Job Walk sign-in sheet.pdf | ||
| VHA DIRECTIVE 1810.pdf | ||
| 36C26222Q0076 0001_1.docx | DOCX document | |
| 36C26222Q0076.docx | DOCX document | |
| Deaerator Inspection Enclosure 2.docx | DOCX document | |
| Deaerator Inspection Enclosure 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name:
Address:
Phone/Fax:
| Send to: Ositadima.ndubizu@va.gov |
| RFI |
(REQUEST FOR INFORMATION)
PROJECT NO.:
| RFI NO.: |
| 001 |
PROJECT NAME:
| SERVICE to PERFORM DEAERATOR (DA) QUALIFIED PROFESSIONAL INSPECTION, VA Long Beach |
| DATE REQUESTED: |
| 11/9/2021 |
SOLICITATION NO.:
| 36C26222Q0076 |
| REFERENCE: |
DRAWING:
SPECIFICATION
SECTION:
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. Who is handling “The Authorized Inspector Portion”?
2. Can Applus have a copy of VHA DIRECTIVE 1810?
3. Is Applus responsible for sub-contracting the safety valve and industrial portion of inspection?
PROJECT MANAGER’S RESPONSE
1. Contractor is responsible for providing Qualified Professional Inspector (QPI) in accordance with VHA Directive 1810. Test must be conducted under supervision of QPI and proof of qualifications must be provided with bid. Refer to Personnel Qualification Requirements
2. See Attached
3. All inspection service detailed in the SOW is the responsibility of the Contractor.
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
DATE:
x/xx/2020