S02 DWGS PART 2_649_18_106.pdf
PDF 8 MB Posted
- Attached to
- Z2DA--Renovate Historic Buildings 19, 20, 42
- Solicitation number
- 36C26222B0008
About this file
This is a presolicitation notice for a construction project to renovate three historic buildings at a Department of Veterans Affairs medical center. The project scope includes general construction, alterations, mechanical and electrical work to upgrade utility systems. The construction value is estimated between $5-10 million. The solicitation will be issued on July 18th via SAM.gov as a 100% set-aside for SDVOSB contractors listed on VIP. The North American Industry Classification code is 236220. A site visit will be scheduled to review the functioning hospital worksite.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRINKLER SYSTEM DESIGN DATA
SYSTEM TYPE
SPACE
OCCUPANCY TYPE
DESIGN AREA
DESIGN DENSITY HOSE STREAM
GPM/SF
SF
GPM
WET
ALL AREAS U.N.O.
NOTES: 1. SEMI-RECESSED PENDENT OR SEMI-RECESSED SIDEWALL HEADS TO BE USED UNDER ALL SUSPENDED CEILINGS.
LIGHT HAZARD 0.10
1. AUTOMATIC FIRE SPRINKLER SYSTEM DESIGN, ENGINEERING AND INSTALLATION AS INDICATED ON THIS PLAN SHALL COMPLY WITH NFPA
13 (2016 EDITION), NFPA 101 (2018 EDITION), VA FIRE PROTECTION DESIGN MANUAL (SEVENTH EDITION) AND OTHER APPLICABLE CODES
AND STANDARDS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ).
2. CONTRACTOR TO COMPLETELY REMOVE EXISTING AUTOMATIC SPRINKLER SYSTEM PIPING AND ASSOCIATED EQUIPMENT, INCLUDING, BUT NOT LIMITED TO, DRY-PIPE VALVES, ALARM CHECK VALVES, ISOLATION VALVES, PIPING AND HANGERS, ETC. START OF DEMOLITION
SHALL COMMENCE AT THE BASE OF THE EXISTING AUTOMATIC SPRINKLER RISERS. BLIND FLANGE THE TERMINATION POINTS OF WHERE
EXISTING PIPING REMAINS.
3. CONTRACTOR TO PROVIDE WET-PIPE AUTOMATIC SPRINKLER SYSTEMS FOR THE AREAS SHOWN ON THESE DESIGN DOCUMENTS. NEW
SYSTEM PIPING SHALL BE CONNECTED AT THE NEW POINTS OF CONNECTIONS AT EACH BUILDING. ALL NEW SPRINKLER AREAS SHALL
CONFORM TO EXISTING FIRE, SMOKE AND FIRE ALARM ZONES.
4. PROVIDE FM-GLOBAL APPROVED AUTOMATIC SPRINKLERS AS INDICATED IN THE TABLE ON THIS DRAWING. REDUCTION IN DESIGN AREA
IS ALLOWED PER NFPA 13.
5. ALL MATERIALS AND DEVICES USED IN THIS PROJECT SHALL BE UL-LISTED AND/OR FM-APPROVED FOR USE IN AUTOMATIC SPRINKLER
SYSTEMS.
6. ALL SPRINKLER PIPING PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE SEALED WITH A UL-APPROVED THROUGH
PENETRATION FIRE STOP ASSEMBLY.
7. ALL AUTOMATIC SPRINKLER PIPING INSTALLED UNDER THIS CONTRACT SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH
NFPA 13 AND OTHER APPLICABLE NFPA STANDARDS, STATE AND LOCAL CODES.
8. SPRINKLER PIPE HANGERS SHALL BE UL-APPROVED. THE SPRINKLER INSTALLATION CONTRACTOR SHALL PROVIDE PIPE HANGERS AS
REQUIRED BY NFPA 13.
9. SEISMIC BRACING SHALL BE PROVIDED FOR ALL AUTOMATIC SPRINKLER SYSTEMS IN ACCORDANCE WITH NFPA 13, 2016 EDITION, AND
PROJECT SPECIFICATIONS.
1,500
DATE OF TEST: AUGUST 21, 2018
TIME OF TEST: 9:15 AM
FLOW HYDRANT: HYDRANT #27
PRESSURE HYDRANT: HYDRANT #26
STATIC PRESSURE: 65 PSI
RESIDUAL PRESSURE: 38 PSI
PITOT PRESSURE: 30 PSI
2-1/2" HYDT BUTT
WATERFLOW: 920 GALLONS
SPRINKLER HEAD TYPE
QUICK RESPONSE, K-5.6 OR 8.0
QUICK RESPONSE, K-5.6 OR 8.0
ORDINARY TEMPERATURE
155F OR 200F
(NOTE 1)
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
WET
ORDINARY HAZARD GROUP 1 0.15
1,500
WET
ORDINARY HAZARD GROUP 2 0.20
1,500
QUICK RESPONSE, K-5.6 OR 8.0
ORDINARY TEMPERATURE
MECHANICAL
ELECTRICAL
STORAGE
CLEAN STORAGE
FLAMMABLE STORAGE
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
*ABOVE HYDRANT TEST IS VALID 1 YEAR FROM TIME
OF TEST. CONTRACTOR TO PROVIDE UPDATED WATER TEST
INFORMATION AS PART OF SHOP DRAWING SUBMITTAL.
AUTOMATIC SPRINKLER SYSTEM NOTES:
WATER SUPPLY TEST:
WATER SUPPLY TEST HYDRANT LOCATIONS
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
FIRE SPRINKLER
COVER SHEET
FX001
19, 20 & 42
O f f i c e o f
F a c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
LEGEND
DN
REF.
DN
UNISEX TOILET
HAC
MECHANICAL
TELLER
VAULT / RECORD /
STORAGE
R A
M P
R A
CORRIDOR
SECURITY
OPEN OFFICE
WAITING ROOM
BREAKROOM
ATM ROOM
ELEC. / IT
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
FIRST FLOOR
FIRE SPRINKLER PLAN
19-FX101
19-FX101
SCALE: 1/4" = 1'-0"
FIRST FLOOR FIRE SPRINKLER PLAN
GENERAL NOTES
LEGEND
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
1. PROVIDE WET-PIPE AUTOMATIC SPRINKLER
SYSTEM AS SHOWN ON THIS DRAWING.
0'
SCALE: 1/4" = 1'-0"
8'4'2'
1. PROVIDE DRY-HORIZONTAL SIDEWALL
SPRINKLERS IN THESE AREAS.
# KEY NOTES
UP R
E
F
UP
ELEVATOR
PUMP ROOM
CONTROL
WOMEN
MEN
IT / COMM
STUDIO OFFICE
STAIR
CORRIDOR
HUDDLE SPACE
BREAK ROOM
VETERANS HISTORIC
PROJECT
STAIR
CORRIDOR
STUDIO
MECHANICAL ROOM
ELECTRICAL ROOM
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
BASEMENT
FIRE SPRINKLER PLAN
20-FX101
20-FX101
SCALE: 1/4" = 1'-0"
BASEMENT FIRE SPRINKLER PLAN
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
LEGEND
GENERAL NOTES
1. PROVIDE WET-PIPE AUTOMATIC SPRINKLER
SYSTEM AS SHOWN ON THIS DRAWING.
1. PROVIDE FLOOR CONTROL VALVE ASSEMBLY.
2. PROVIDE STANDARD RESPONSE,
INTERMEDIATE TEMPERATURE, HORIZONTAL
SIDEWALL SPRINKLER IN THE ELEVATOR PIT.
INSTALL SEPARATE SPRINKLER CONTROL
VALVE FOR THIS SPRINKLER HEAD.
3. PROVIDE STANDARD RESPONSE,
INTERMEDIATE TEMPERATURE SPRINKLER
HEADS IN ELEVATOR EQUIPMENT ROOM (THIS
SUPERSEDES LEGEND NOTES FOR THIS AREA
ONLY).
# KEYNOTES
0'
SCALE: 1/4" = 1'-0"
8'4'2'
UP
REF.
UP
LIBRARY
WOMEN
MEN
HAC
R A
R A
OFFICE - LIBRARIAN
VETERANS
ORIENTATION
STAIR
HPDP OFFICE
MHV OFFICE
PRINTER / FAX AREA
CORRIDOR
BREAKROOM
CORRIDOR
CORRIDOR
STORAGE
STORAGE
ELEVATOR
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
FIRST FLOOR
FIRE SPRINKLER PLAN
20-FX102
20-FX102
SCALE: 1/4" = 1'-0"
FIRST FLOOR FIRE SPRINKLER PLAN
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
LEGEND
1. PROVIDE FLOOR CONTROL VALVE ASSEMBLY.
2. PROVIDE DRY-HORIZONTAL SIDEWALL
SPRINKLERS IN THESE AREAS.
1. PROVIDE WET-PIPE AUTOMATIC SPRINKLER
SYSTEM AS SHOWN ON THIS DRAWING.
0'
SCALE: 1/4" = 1'-0"
8'4'2'
GENERAL NOTES
R E
F
OFFICE / MULTI
PURPOSE
MEN
WOMEN
TRAINING AREA
BREAKROOM
SLM OFFICE
AO OFFICE
AV CLOSET
STAIR
PRINT / COPY
SRC OFFICE
CAC OFFICE
STAIR
CORRIDOR
CORRIDOR
MECH.
CHASE
ELEVATOR
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
SECOND FLOOR
FIRE SPRINKLER PLAN
20-FX103
20-FX103
SCALE: 1/4" = 1'-0"
SECOND FLOOR FIRE SPRINKLER PLAN
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
GENERAL NOTES
LEGEND
1. PROVIDE FLOOR CONTROL VALVE ASSEMBLY.
1. PROVIDE WET-PIPE AUTOMATIC SPRINKLER
SYSTEM.
0'
SCALE: 1/4" = 1'-0"
REF.
DN
TRAINING ROOM
SECURE TRAINING
ROOM
LOBBY
STORAGE
TMS OFFICE
TRAINING SPECIALIST
WOMEN
MEN
MECHANICAL
ELEC.
IT / COMM
BREAK ROOM
COPIER
VENDING
CORRIDOR
CORRIDOR
R A
R A
HAC
AV CLOSET
CORRIDOR
HATCHED AREAS - ORDINARY
HAZARD GROUP 1 AUTOMATIC
SPRINKLER DESIGN 155° F OR 200° F
QUICK RESPONSE, k-5.6 OR k-8.0
HEADS.
HATCHED AREAS - ORDINARY
HAZARD GROUP 2 AUTOMATIC
SPRINKLER DESIGN 155° F QUICK
RESPONSE, k-5.6 OR k-8.0 HEADS.
NON HATCHED AREAS - LIGHT
HAZARD AUTOMATIC SPRINKLER
DESIGN 155° F QUICK RESPONSE,
k-5.6 OR k-8.0 HEADS.
WET-PIPE AUTOMATIC SPRINKLER SYSTEM RISER
FIRST FLOOR
FIRE SPRINKLER PLAN
42-FX101
42-FX101
SCALE: 3/16" = 1'-0"
FIRST FLOOR FIRE SPRINKLER PLAN
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
4' 8'0 2'
SCALE:3/16"=1'-0"
LEGEND
1. PROVIDE DRY-HORIZONTAL SIDEWALL
SPRINKLERS IN THESE AREAS.
1. PROVIDE WET-PIPE AUTOMATIC SPRINKLER
SYSTEM.
GENERAL NOTES
THRUST BLOCK
DO NOT POUR SOLID
FINISHED FLOOR SLAB
BLACK STEEL PIPE
TAMPER SWITCH
UL LISTED OR FM APPROVED
BACKFLOW DEVICE
FLOW SWITCH
MAIN DRAIN
DRAIN TO DAYLIGHT
3' - 0"
EXTERIOR WALL
PRESSURE GAUGE
PRESSURE GAUGE
FLEXIBLE COUPLING
D.I. UNDG UNDER BLDG
TAMPER SWITCH
MAXIMUM
GR. X GR. BUTTERFLY VA.
W/ TAMPER SWITCH
T O
S U
P P
L Y
R
I S
E R
D R
A I N
300 lb. PRESSURE
FLOW SWITCH
SYSTEM
GAUGE
TO
TEST AND DRAIN WITH
RELIEF VALVE
EXTERIOR WALL
TAMPER SWITCH
TAMPER SWITCH
UL LISTED OR FM APPROVED
BACKFLOW DEVICE
BLACK STEEL PIPE
FINISHED FLOOR SLAB
DO NOT POUR SOLID
THRUST BLOCK
D.I. UNDG UNDER BLDG
FLEXIBLE COUPLING
PRESSURE GAUGE
PRESSURE GAUGE
MAXIMUM
MAIN DRAIN
DRAIN TO DAYLIGHT
TO BSMT FLOOR
CONTROL ASSEMBLY
TO STAIRWELL FLOOR
CONTROL ASSEMBLY
3' - 0"
FIRE SPRINKLER DETAILS
FX500
RDLJAM
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
FX-500
SCALE: N.T.S. (ACTUAL LAYOUT MAY VARY)
WET PIPE RISER DETAIL (Bldg.'s 19 & 42)
FX-500
SCALE: N.T.S.
FLOOR CONTROL ASSEMBLY
FX-500
SCALE: N.T.S. (ACTUAL LAYOUT MAY VARY)
WET PIPE RISER DETAIL (Bldg. 20)
19, 20 & 42
C
C
C
C
C
C
C
FACPMAP
DN
DN
REF.
DN
UNISEX TOILET
HAC
MECHANICAL
TELLER
VAULT / RECORD /
STORAGE
R A
R A
CORRIDOR
SECURITY
OPEN OFFICE
WAITING ROOM
BREAKROOM
ATM ROOM
ELEC. / IT
DOC
TS
FSTS
P
WP
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
FIRST FLOOR
FIRE ALARM PLAN
19-FA101
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
19-FA101
SCALE: 1/4" = 1'-0"
FIRST FLOOR FIRE ALARM PLAN
0'
F
UP
ELEVATOR
PUMP ROOM
CONTROL
WOMEN
MEN
IT / COMM
STUDIO OFFICE
STAIR
CORRIDOR
HUDDLE SPACE
BREAK ROOM
VETERANS HISTORIC
PROJECT
STAIR
CORRIDOR
STUDIO
MECHANICAL ROOM
ELECTRICAL ROOM
P
C
C
C
C
CMCMCMCM
MM
P
C
C
C
C
C
H
P R
I M
A R
Y
A L
T E
R N
A T
E
H A
T
S H
U N
T
TS
FS TS
TS
S AHU 1
R AHU 1
TS
TS
KEY NOTES:
1. PROVIDE INTERFACE TO AUXILIARY SOUND
SYSTEM TO SHUT DOWN ON ALARM. SYSTEM
SHALL AUTOMATICALLY RESET UPON RESET
OF FIRE ALARM SYSTEM WITHOUT MANUAL
INTERVENTION.
2. INSTALL HEAT DETECTOR WITHIN 24 INCHES
OF EACH SPRINKLER. FIELD COORDINATE
LOCATION AND QUANTITY.
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
BASEMENT
FIRE ALARM PLAN
20-FA101
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
20-FA101
SCALE: 1/4" = 1'-0"
BASEMENT FIRE ALARM PLAN
0'
REF.
UP
LIBRARY
WOMEN
MEN
HAC
R A
R A
OFFICE - LIBRARIAN
VETERANS
ORIENTATION
STAIR
HPDP OFFICE
MHV OFFICE
PRINTER / FAX AREA
CORRIDOR
BREAKROOM
CORRIDOR
CORRIDOR
STORAGE
STORAGE
ELEVATOR
P
P
P
C
C
C
C
C
C
C
C
P
C
F A
C P
M A
P
C
C
D O
C
FSTS
CM
CM CM
WP
C
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
KEY NOTES:
1. COORDINATE WITH MECHANICAL
CONTRACTOR FOR INTERFACE TO
COMBINATION FIRE SMOKE DAMPERS.
INSTALL DETECTION AND NECESSARY RELAY
INTERFACE AT EACH DAMPER AS REQUIRED
FOR COMPLETE CONTROL. IF DETECTOR
REQUIRES A MINIMUM AIRFLOW FOR LISTED
OPERATION, DAMPER SHALL CLOSE
WHENEVER HVAC UNIT IS OFF. PROVIDE
REQUIRED MONITORING OF HVAC.
FIRST FLOOR
FIRE ALARM PLAN
20-FA102
20-FA102
SCALE: 1/4" = 1'-0"
FIRST FLOOR FIRE ALARM PLAN
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
0'
SCALE: 1/4" = 1'-0"
8'4'2'
R E
F
OFFICE / MULTI
PURPOSE
MEN
WOMEN
TRAINING AREA
BREAKROOM
SLM OFFICE
AO OFFICE
AV CLOSET
STAIR
PRINT / COPY
SRC OFFICE
CAC OFFICE
STAIR
CORRIDOR
CORRIDOR
MECH.
CHASE
ELEVATOR
P
C
C
C
C
C
C
C
C
P
C
FSTS
CM CM
CM CM
KEY NOTES:
1. PROVIDE INTERFACE TO AUXILIARY SOUND
SYSTEM TO SHUT DOWN ON ALARM. SYSTEM
SHALL AUTOMATICALLY RESET UPON RESET
OF FIRE ALARM SYSTEM WITHOUT MANUAL
INTERVENTION.
2. COORDINATE WITH MECHANICAL
CONTRACTOR FOR INTERFACE TO
COMBINATION FIRE SMOKE DAMPERS.
INSTALL DETECTION AND NECESSARY RELAY
INTERFACE AT EACH DAMPER AS REQUIRED
FOR COMPLETE CONTROL. IF DETECTOR
REQUIRES A MINIMUM AIRFLOW FOR LISTED
OPERATION, DAMPER SHALL CLOSE
WHENEVER HVAC UNIT IS OFF. PROVIDE
REQUIRED MONITORING OF HVAC UNITS.
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
SECOND FLOOR
FIRE ALARM PLAN
20-FA103
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
20-FA103
SCALE: 1/4" = 1'-0"
SECOND FLOOR FIRE ALARM PLAN
0'
SCALE: 1/4" = 1'-0"
8'4'2'
REF.
DN
TRAINING ROOM
SECURE TRAINING
ROOM
LOBBY
STORAGE
TMS OFFICE
TRAINING SPECIALIST
WOMEN
MEN
MECHANICAL
ELEC.
IT / COMM
BREAK ROOM
COPIER
VENDING
CORRIDOR
CORRIDOR
R A
R A
HAC
AV CLOSET
CORRIDOR
P
P
P
C
C
C
C
C
C
F A
C P
M A
P
C
C
C
C
C
D O
C
TSFS
TS
S
R
WP
KEY NOTES:
1. PROVIDE INTERFACE TO AUXILIARY SOUND
SYSTEM TO SHUT DOWN ON ALARM. SYSTEM
SHALL AUTOMATICALLY RESET UPON RESET
OF FIRE ALARM SYSTEM WITHOUT MANUAL
INTERVENTION.
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
FIRST FLOOR
FIRE ALARM PLAN
42-FA101
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
N
RDLJAM
4' 8'0 2'
SCALE:3/16"=1'-0"
42-FA101
SCALE: 3/16" = 1'-0"
FIRST FLOOR FIRE ALARM PLAN
GENERAL NOTES:
1. FIRE ALARM SYSTEM DESIGN, ENGINEERING
AND INSTALLATION AS INDICATED ON THIS
PLAN SHALL COMPLY WITH NFPA 72 (2016
EDITION), NFPA 101 (2018 EDITION), AND THE
SEVENTH EDITION OF THE VA FIRE
PROTECTION DESIGN MANUAL.
2. CONTRACTOR SHALL PROVIDE A FIRE ALARM
SYSTEM AS SHOWN ON THESE DESIGN
DOCUMENTS. NOTIFICATION SHALL BE BY
PRE-RECORDED VOICE MESSAGES.
3. THE NEW FIRE ALARM SYSTEM SHALL BE
INTERFACED TO THE CAMPUS NETWORK VIA
THE FIBER LOOP AND BE COMPATIBLE WITH
THE EXISTING NOTIFIER NETWORK.
CONTRACTOR SHALL PROVIDE ALL MATERIAL
AND LABOR TO INTERFACE TO EXISTING
CAMPUS FIBER LOOP.
4. PROVIDE NEW POWER AND CONTROL
EQUIPMENT AS REQUIRED, CONSISTENT
WITH CAMPUS STANDARDS.
5. ALL EXISTING FIRE ALARM EQUIPMENT TO BE
REMOVED. PRIOR TO DISPOSAL OF
EQUIPMENT, CONTACT FIRE ALARM SHOP
AND RETURN EQUIPMENT AS REQUESTED.
6. NEW FIBER OPTIC CABLE SHALL BE IN
ACCORDANCE WITH CAMPUS STANDARDS
AND MANUFACTURER RECOMMENDATIONS.
7. CONTRACTOR SHALL COORDINATE LOCATION
OF FIRE ALARM EQUIPMENT WITH ALL OTHER
TRADES INCLUDING ELECTRICAL,
MECHANICAL, FIRE SPRINKLER AND
ARCHITECTURAL FEATURES.
SYSTEM INPUTS
PULL STATION
SMOKE DETECTOR
WATERFLOW
A
L
A
N
D
I
C
A
T
I
O
A
T
C
P
S
U
P
E
R
V
I
S
O
D
I
C
A
T
I
C
P
A
C
T
I
V
A
T
I
F
I
C
A
T
I
P
L
I
A
N
C
E
S
T
R
A
N
S
M
S
G
N
U
P
E
R
V
I
S
I
G
A
T
I
O
N
*ALL ALARM, SUPERVISORY AND TROUBLE SIGNALS TO BE
ANNUNCIATED LOCALLY AND TRANSMITTED TO
SUPERVISING STATION IN ACCORDANCE WITH NFPA 72.
SYSTEM OUTPUTS
X
X
X
X
X
X
X
X
X
OPERATIONAL MATRIX:
VALVE TAMPER X X
ELEV LOBBY
I
N
I
T
I
A
E
V
A
T
C
A
L
L
X X X
SMOKE DETECTOR
X
E
L
E
V
A
T
H
U
I
P
HEAT DETECTOR X X X X
DUCT SMOKE DET X X X
S
H
D
W
H
U
S
H
W
X
I
L
L
A
D
U
R
C
E
T
R
A
N
S
M
G
N
C
M
P
T
W
O
R
K
X
X
X
X
X
X
X
X
X
X
X
X
X
C
L
O
M
P
E
R
X
FACP
P TS FS
HORN/STROBE
EXTERIOR RISER
ROOM
P TS FS
TO NEXT SPEAKER
FIRST FLOOR
SECOND FLOOR
P TS FS
DUCT
BASEMENT FLOOR
FLOOR
CONTROL
ASSEMBLY
CMCMCMMM
P R
I M
A R
Y
R
E C
A L L
S E
C O
N D
A R
Y
R
E C
A L L
S H
U N
T
T
R I P
S H
U N
T
T
R
W
E R
EOL
CM
H A
T
TS
PIT
TO CAMPUS
FIBER LOOP
TS
RISER
TO
UPPER
FLOORS
TS TS
BACKFLOW
H
PIT
FACP
SS
120 VAC
TO NEXT FIRE ALARM STROBE
HORN/STROBE
EXTERIOR RISER
ROOM
FIRST FLOOR
P FS
FLOOR
CONTROL
ASSEMBLY
TO CAMPUS
FIBER LOOP
TS TS
BACKFLOW
SS
120 VAC
FACP
SS
120 VAC
HORN/STROBE
EXTERIOR RISER
ROOM
FIRST FLOOR
P FS
FLOOR
CONTROL
ASSEMBLY
TO CAMPUS
FIBER LOOP
TS TS
BACKFLOW
BLDG 42 SCHEMATIC ONE-LINEBLDG 20 SCHEMATIC ONE-LINEBLDG 19 SCHEMATIC ONE-LINE
CM
DAMPER
CM
DAMPER
DUCT
TO NEXT SPEAKER
EOL
TO NEXT SPEAKER
EOL
TO NEXT SPEAKER
EOL
TO NEXT SPEAKER
EOL
EOL
TO NEXT FIRE ALARM STROBE
EOL
TO NEXT FIRE ALARM STROBE
EOL
TO NEXT FIRE ALARM STROBE
EOL
TO NEXT FIRE ALARM STROBE
EOL
ONE-LINE NOTES:
1. REFER TO FLOOR PLANS FOR ACTUAL
QUANTITY OF DEVICES AND APPLIANCES.
2. QUANTITIES OF POWER SUPPLIES AND
NUMBER OF CIRCUITS SHALL BE
DETERMINED BY CONTRACTOR.
3. ALL WIRING TO BE IN ACCORDANCE WITH
MANUFACTURER INSTRUCTIONS AND
NFPA 72. ALL WIRING TO BE IN
ELECTRICAL METALLIC TUBING (EMT). ALL
CONDUIT TO BE LABELED "FIRE ALARM"
CONSIST WITH CAMPUS STANDARDS. ALL
CIRCUITS SHALL BE "CLASS B".
4. ALL CIRCUITS ENTERING/LEAVING THE
BUILDING SHALL BE PROTECTED WITH A
SURGE SUPPRESSION DEVICE.
5. ALL CONTROL UNIT POWER CIRCUITS
SHALL BE PROTECTED WITH A SURGE
SUPPRESSION DEVICE.
P
XX
C
XX
C
TS
FS
FACP
LEGEND:
FIRE ALARM CONTROL PANEL
FRAMED GRAPHIC MAP
DOCUMENT CABINET
MANUAL PULL STATION
SMOKE DETECTOR
DUCT = DUCT SMOKE S-SUPPLY;R-RETURN
HEAT DETECTOR
MONITOR MODULE - TAMPER SWITCH
MONITOR MODULE - FLOW SWITCH
MONITOR MODULE
CONTROL MODULE
SURGE SUPPRESSOR
SPEAKER/STROBE, CEILING MOUNT
XX=CANDELA
STROBE, CEILING MOUNT
XX=CANDELA
WEATHERPROOF HORN/STROBE
EOL END OF LINE RESISTOR
SS
MM
CM
H
MAP
DOC
WP
FIRE ALARM DETAILS
FA500
RDLJAM
O f f i c i l i t i e s
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
Revision Date
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
BID DOCUMENTS
649-18-106
03/29/2019
19, 20 & 42
BLOCKING BETWEEN CEILING JOISTS,
RAFTERS, OR TRUSSES TO TOP PLATE OR
OTHER FRAMING BELOW
BLOCKING BETWEEN RAFTER OR TRUSS
NOT AT THE WALL TOP PLATE, TO RAFTER
OR TRUSS
FLAT BLOCKING TO TRUSS AND WEB
FILLER
CEILING JOISTS TO TOP PLATE
CEILING JOIST NOT ATTACHED TO
PARALLEL RAFTER, LAPS OVER
PARTITIONS (NO THRUST) (SEE SECTION
2308.7.3.1, TABLE 2308.7.3.1)
CEILING JOIST ATTACHED TO PARALLEL
RAFTER (HEEL JOINT) (SEE SECTION
2308.7.3.1, TABLE 2308.7.3.1)
COLLAR TIE TO RAFTER
RAFTER OR ROOF TRUSS TO TOP PLATE
(SEE SECTION 2308.7.5, TABLE 2308.7.5)
ROOF RAFTERS TO RIDGE VALLEY OR HIP
RAFTERS; OR ROOF RAFTER TO 2-INCH
RIDGE BEAM
STUD TO STUD (NOT AT BRACED WALL
PANELS)
STUD TO STUD AND ABUTTING STUDS AT
INTERSECTING WALL CORNERS (AT
BRACED PANELS)
BUILT-UP HEADER (2" TO 2" HEADER)
CONTINUOUS HEADER TO STUD
TOP PLATE TO TOP PLATE
TOP PLATE TO TOP PLATE, AT END JOINTS
BOTTOM PLATE TO JOIST, RIM JOIST, BAND
JOIST, OR BLOCKING (NOT AT BRACED
WALL PANELS)
BOTTOM PLATE TO JOIST, RIM JOIST, BAND
JOIST, OR BLOCKING AT BRACED WALL
PANELS
STUD TO TOP OR BOTTOM PLATE
TOP OR BOTTOM PLATE TO STUD
TOP PLATES, LAPS AT CORNERS AND
INTERSECTIONS
1" BRACE TO EACH STUD AND PLATE
1" x 6" SHEATHING TO EACH BEARING
1" x 8" AND WIDER SHEATHING TO EACH
BEARING
3-8d COMMON (2-1/2" x 0.131"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
2-8d COMMON (2-1/2" x 0.131") 2-3" x 0.131" NAILS
2-3" 14 GAGE STAPLES
2-16d COMMON (3-1/2" x 0.162") 3-3" x 0.131" NAILS
3-3" 14 GAGE STAPLES
16d COMMON (3-1/2" x 0.162") @ 6" O.C.
3" x 0.131" NAILS
3" x 14 GAGE STAPLES @ 6" O.C.
3-8d COMMON (2-1/2" x 0.131"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
3-16d COMMON (2-1/2" x 0.162"); OR 4-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
PER TABLE 2308.7.3.1
3-10d COMMON (2-1/2" x 0.148"); OR 4-10d BOX (3" x 0.128"); OR
4-3" x 0.131" NAILS; OR
4-3" 14 GAGE STAPLES, 7/16" CROWN
3-10d COMMON (2-1/2" x 0.148"); OR 3-16d BOX (3-1/2" x 0.135"); OR
4-10d BOX (3" x 0.128"); OR 4-3" x 0.131" NAILS; OR
4-3" 14 GAGE STAPLES, 7/16" CROWN
2-16d COMMON (3-1/2" x 0.162"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
3-10d COMMON (2-1/2" x 0.148"); OR 3-16d BOX (3-1/2" x 0.135"); OR
4-10d BOX (3" x 0.128"); OR 4-3" x 0.131" NAILS; OR
4-3" 14 GAGE STAPLES, 7/16" CROWN
WALL
ROOF
16d COMMON (3-1/2" x 0.162");
10d BOX (3" x 0.128"); OR 3" x 0.131" NAILS; OR
3-3" x 14 GAGE STAPLES, 7/16" CROWN
16d COMMON (3-1/2" x 0.162"); OR
16d BOX (3-1/2" x 0.135"); OR
3" x 0.131" NAILS; OR 3-3" x 14 GAGE STAPLES, 7/16" CROWN
16d COMMON (3-1/2" x 0.162"); OR
16d BOX (3-1/2" x 0.135")
4-8d COMMON (2-1/2" x 0.131"); OR 4-10d BOX (3" x 0.128")
16d COMMON (3-1/2" x 0.162"); OR
10d BOX (3" x 0.128"); OR 3" x 0.131" NAILS; OR
3" x 14 GAGE STAPLES, 7/16" CROWN
8-16d COMMON (3-1/2" x 0.162"); OR 12-10d BOX (3" x 0.128"); OR
12-3" x 0.131" NAILS; OR
12-3" 14 GAGE STAPLES, 7/16" CROWN
16d COMMON (3-1/2" x 0.162"); OR
16d BOX (3-1/2" x 0.135"); OR 3" x 0.131" NAILS; OR
3" x 14 GAGE STAPLES, 7/16" CROWN
2-16d COMMON (3-1/2" x 0.162"); OR 3-16d BOX (3-1/2" x 0.135"); OR
4-3" x 0.131" NAILS; OR
4-3" 14 GAGE STAPLES, 7/16" CROWN
4-8d COMMON (2-1/2" x 0.131"); OR 4-10d BOX (3" x 0.128"); OR
4-3" x 0.131" NAILS; OR
4-3" 14 GAGE STAPLES, 7/16" CROWN; OR
2-16d COMMON (3-1/2" x 0.162"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
2-16d COMMON (3-1/2" x 0.162"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
2-16d COMMON (3-1/2" x 0.162"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
2-8d COMMON (2-1/2" x 0.131"); OR 2-10d BOX (3" x 0.128"); OR
2-3" x 0.131" NAILS; OR
2-3" 14 GAGE STAPLES, 7/16" CROWN
2-8d COMMON (2-1/2" x 0.131"); OR 2-10d BOX (3" x 0.128")
3-8d COMMON (2-1/2" x 0.131"); OR 3-10d BOX (3" x 0.128")
EACH END, TOENAIL
EACH END, TOENAIL
END NAIL
FACE NAIL
EACH JOIST, TOENAIL
FACE NAIL
FACE NAIL
FACE NAIL
TOENAIL
END NAIL
TOENAIL
24" O.C. FACE NAIL
16" O.C. FACE NAIL
16" O.C. FACE NAIL
12" O.C. FACE NAIL
12" O.C. FACE NAIL
16" O.C. EACH EDGE, FACE NAIL
12" O.C. EACH EDGE, FACE NAIL
TOENAIL
16" O.C. FACE NAIL
12" O.C. FACE NAIL
EACH SIDE OF END JOINT, FACE NAIL
(MINIMUM 24" LAP SPLICE LENGTH
EACH SIDE OF END JOINT)
16" O.C. FACE NAIL
12" O.C. FACE NAIL
16" O.C. FACE NAIL
TOENAIL
END NAIL
END NAIL
FACE NAIL
FACE NAIL
FACE NAIL
FACE NAIL
JOIST TO SILL, TOP PLATE, OR GIRDER
RIM JOIST, BAND JOIST, OR BLOCKING TO
TOP PLATE, SILL OR OTHER FRAMING
BELOW
1" x 6" SUBFLOOR OR LESS TO EACH JOIST
2" SUBFLOOR OR LESS TO EACH JOIST
2" PLANKS (PLANK & BEAM - FLOOR &
ROOF)
BUILT UP GIRDERS AND BEAMS 2" LUMBER
LAYERS
LEDGER STRIP SUPPORTING JOISTS OR
RAFTERS
JOIST TO BAND JOIST OR RIM JOIST
BRIDGING OR BLOCKING TO JOIST,
RAFTER OR TRUSS
FLOOR
3-8d COMMON (2-1/2" x 0.162"); OR 3-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
8d COMMON (2-1/2" x 0.162"); OR 10d BOX (3" x 0.128"); OR
3" x 0.131" NAILS; OR
3" 14 GAGE STAPLES, 7/16" CROWN
2-8d COMMON (2-1/2" x 0.131"); OR 2-10d BOX (3" x 0.128")
2-16d COMMON (3-1/2" x 0.162")
2-16d COMMON (3-1/2" x 0.162")
20d COMMON (4" x 0.192")
10d BOX (3" x 0.128"); OR 3" x 0.131" NAILS; OR
3" x 14 GAGE STAPLES, 7/16" CROWN
AND:
2-20d COMMON (4" x 0.192"); OR
3-10d BOX (3" x 0.128"); OR 3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
3-16d COMMON (2-1/2" x 0.162"); OR 4-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
3-16d COMMON (2-1/2" x 0.162"); OR 4-10d BOX (3" x 0.128"); OR
3-3" x 0.131" NAILS; OR
3-3" 14 GAGE STAPLES, 7/16" CROWN
2-8d COMMON (2-1/2" x 0.131"); OR 2-10d BOX (3" x 0.128"); OR
2-3" x 0.131" NAILS; OR
2-3" 14 GAGE STAPLES, 7/16" CROWN
TOENAIL
6" O.C., TOENAIL
FACE NAIL
FACE NAIL
EACH BEARING, FACE NAIL
32" O.C., FACE NAIL AT TOP AND
BOTTOM STAGGERED ON OPPOSITE
SIDES
24" O.C., FACE NAIL AT TOP AND
BOTTOM STAGGERED ON OPPOSITE
SIDES
ENDS AND AT EACH SPLICE, FACE
NAIL
EACH JOIST OR RAFTER, FACE NAIL
END NAIL
EACH END, TOENAIL
NOTES:
A. AS AN ALTERNATE MINIMUM NAILING SHALL BE PROVIDED AS SPECIFIED BY IBC TABLE 2304.10.1 B. THIS SCHEDULE REFLECTS MINIMUM NAILING ONLY. IN CASES WHERE LOADING CONDITIONS
ARE GREATER THAN THESE CONNECTIONS WILL APPLY SEE PLANS AND DETAILS.
WOOD FASTENER SCHEDULE
PRIMARY FRAMING
SECONDARY FRAMING
PRE-ENGINEERED TRUSS
EDGE OF HIDDEN CONSTRUCTION
HANGERS
BUILT-UP 2x POST
SOLID WOOD POST
CMU
CONCRETE
DISTRUBED EARTH
UNDISTURBED EARTH
ROOF OVERFRAMING
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:0
PM
STRUCTURAL GENERAL
NOTES, LEGEND, AND
ABBREVIATIONS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/2019
649-18-106
S-001 87 135
JTBJWV19, 20, & 42
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
DESIGN CRITERIA
A. SCOPE: THIS SPECIFICATION OUTLINES THE STRUCTURAL DESIGN CRITERIA FOR THE
RENOVATION OF HISTORIC BUILDINGS 19, 20, AND 42 AT THE NORTHERN ARIZONA VA
HEALTH CARE SYSTEMS. WHEN A DIFFERENCE EXISTS BETWEEN THIS SPECIFICATION
AND ANY OTHER GOVERNING CODE, THE MORE STRINGENT SHALL CONTROL. ANY OTHER
ITEMS NOT COVERED THEREIN SHALL BE COMMENSURATE WITH GOOD ENGINEERING
PRACTICE.
B. APPLICABLE CODES AND STANDARDS:
1. INTERNATIONAL BUILDING CODE - 2018 EDITION
2. AMERICAN SOCIETY OF CIVIL ENGINEERS - ASCE 7-10
3. AISC MANUAL OF STEEL CONSTRUCTION - 15TH EDITION
4. ACI BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE - ACI 318-14
5. AMERICAN WOOD COUNCIL - NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION - 2018 EDITION
6. BUILDING CODE REQUIREMENTS AND SPECIFICATIONS FOR MASONRY
STRUCTURES - ACI 530-13 / TMS 402-13
C. BUILDING RISK CATEGORIES:
1. BUILDING 19 II
2. BUILDING 20 II
3. BUILDING 42 II
D. DESIGN LOADS:
1. DEAD LOADS: WEIGHT OF STRUCTURE AND ALL THINGS PERMANENTLY ATTACHED:
a. CONCRETE: 150 PCF
b. FLOORS: 45 PSF
c. DECKS: 15 PSF
d. SHINGLE ROOFS: 15 PSF
e. SLATE ROOFS: 30 PSF
2. GRAVITY LIVE LOADS:
a. LOBBIES AND FIRST FLOOR CORRIDORS: 100 PSF
b. UPPER FLOOR CORRIDORS: 80 PSF
c. DECK LOAD: 80 PSF
d. ROOF LOAD: 20 PSF
3. SNOW LOAD:
a. GROUND SNOW LOAD: Pg = 30 PSF
b. SNOW EXPOSURE FACTOR: Ce = 1.0
c. SNOW LOAD IMPORTANCE FACTOR: Is = 1.0
d. THERMAL FACTOR: Ct = 1.0
e. DESIGN UNIFORM SNOW LOAD: 30 PSF
4. WIND LOAD:
a. ANALYSIS PROCEDURE: DIRECTIONAL
b. BASIC WIND SPEED: 115 MPH (3 SEC GUST)
c. EXPOSURE CLASSIFICATION: B
d. INTERNAL PRESSURE COEFFICIENT: ±0.18
5. SEISMIC DESIGN CRITERIA
a. SEISMIC IMPORTANCE FACTOR: Ie = 1.0
b. RISK CATEGORY: II
c. MAPPED SPECTRAL RESPONSE ACCELERATIONS:
• Ss = .304
• S1 = .089
d. SITE CLASS: D
e. SPECTRAL RESPONSE COEFFICIENTS:
• Sds = .316
• Sd1 = .142
f. SEISMIC DESIGN CATEGORY: B
g. BASIC SEISMIC-FORCE-RESISTING-SYSTEM:
• ORDINARY PLAIN MASONRY SHEAR WALLS
h. RESPONSE MODIFICATION COEFFICIENT: R = 1.5
i. SEISMIC RESPONSE COEFFICIENT: Cs = .211
j. ANALYSIS PROCEDURE USED:
6. SIMPLIFIED ANALYSIS PROCEDURE
GENERAL NOTES
(AS APPLICABLE TO EACH PHASE OF CONSTRUCTION, UNLESS
NOTED OTHERWISE ON PLANS)
A. VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS.
B. DO NOT REPRODUCE CONTRACT DOCUMENTS OR COPY STANDARD PRINTED
INFORMATION AS BASIS OF SHOP DRAWINGS
C. STRUCTURAL CONSTRUCTION DOCUMENTS RELEASED BY THIS OFFICE ARE ASSUMED TO
BE COMPLETE AND ACCURATE, YET PROBLEMS MAY ARISE DURING CONSTRUCTION.
COMMUNICATION WITH THE COR DURING THIS PROJECT WILL PROVIDE THE BEST
POSSIBLE BUILDING.
D. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION PRACTICES INCLUDING
TECHNIQUES, PROCEDURES AND THE SEQUENCE OF CONSTRUCTION. CONTRACTOR
SHALL NOTIFY COR IF A CONFLICT ARISES DUE TO VARIATIONS OR OTHER PROBLEMS
WITH THE CONSTRUCTION DOCUMENTS
E. DURING ERECTION OF THE BUILDING, PROVIDE TEMPORARY BRACING TO WITHSTAND
ALL LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED, INCLUDING LATERAL LOADS,
STOCKPILES OF MATERIALS AND EQUIPMENT. SUCH BRACING SHALL BE LEFT IN PLACE
AS LONG AS MAY BE REQUIRED FOR SAFETY AND UNTIL ALL STRUCTURAL FRAMING AND
DIAPHRAGMS ARE IN PLACE WITH CONNECTIONS COMPLETED.
F. OBSERVATIONS OF JOBSITE OTHER THAN REQUIRED INSPECTIONS BY ENGINEER ARE
NOT CONSTRUCTION APPROVALS.
G. STRUCTURAL ENGINEER MUST BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY
REQUIRED CONSTRUCTION OBSERVATION.
H. INSTALL ALL DOOR JAMBS FROM FLOOR SLABS A MINIMUM OF 1/2" TO ALLOW FOR
POSSIBLE VERTICAL MOVEMENT.
I. PROVIDE SLEEVES FOR ALL PIPES PLACES THROUGH CONCRETE BEAMS, WALLS,
COLUMNS, OR SLABS.
J. THE BUILDER AND FUTURE OWNER SHOULD BE MADE AWARE OF THE CHANCE OF
MOVEMENT AND CRACKING OF CONCRETE SLABS PLACED DIRECTLY ON COMPACTED
SOIL.
K. VERIFY ALL OPENINGS THROUGH FLOOR, ROOF, AND WALLS WITH MECHANICAL AND
ELECTRICAL CONTRACTORS.
L. DIMENSIONS ON DRAWINGS ARE TAKEN TO THE FACE OF EXISTING STRUCTURE, UNO
M. COORDINATE FINAL LOCATION OF ALL STAIR FRAMING AND FLOOR PENETRATIONS WITH
ARCHITECTURE.
Revision Date
SYMBOLS AND MATERIALS LEGEND
STUCTURAL ABBREVIATIONS
ARCH ARCHITECTURE / ARCHITECTURAL
B.O. BOTTOM OF
CLR CLEAR SPACING
CMU CONCRETE MASONRY UNIT
COR CONTRACTING OFFICER'S REPRESENTATIVE
(E) EXISTING
FT FEET
HSS HOLLOW STEEL SECTION
IN INCH
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LVL LAMINATED VENEER LUMBER
MAX MAXIUMUM
MIN MINIMUM
MPH MILES PER HOUR
(N) NEW
NTS NOT TO SCALE
O.C. ON CENTER
PCF POUNDS PER CUBIC FOOT
PSF POUNDS PER SQUARE FOOT
T.O. TOP OF
TYP. TYPICAL
UNO UNLESS NOTED OTHERWISE
VA US DEPARTMENT OF VETERANS AFFAIRS
FASTENERS IN CONCRETE AND MASONRY:
A. EXPANSION ANCHORS
1. EXPANSION ANCHORS CALLED FOR ON THE DRAWINGS SHALL BE WEDGE TYPE
EXPANSION ANCHORS, UNO
2. EXPANSION ANCHORS IN CONCRETE OR SOLID GROUTED MASONRY SHALL BE MIN.
7 TIMES THE INSERT DIAMETER, UNO.
3. ACCEPTABLE WEDGE TYPE EXPANSION ANCHORS IN CONCRETE ARE:
a. KWIK BOLT TZ BY HILTI CORPORATION
b. TRUBOLT+ BY ITW REDHEAD
c. POWERSTUD+ SD1 OR SD2 BY POWERS FASTENERS
d. STRONG BOLT BY SIMPSON STRONG-TIE
B. ADHESIVE ANCHORS
1. EPOXY SHALL CONFORM TO ASTM C-881, TYPE IV, GRADE 2 WITH CLASS SUITABLE
FOR ENVIRONMENTAL CONDITIONS
2. EMBEDMENT INTO CONCRETE OR SOLID GROUTED MASONRY SHALL BE AT LEAST 9
TIMES THE INSERT DIAMETER, UNO
3. ACCEPTABLE EPOXIES FOR ANCHORING TO EXISTING CONCRETE ARE:
a. PE1000+ BY POWERS FASTENERS
b. HIT-HY 200 AND HIT-RE 500-SD BY HILTI COROPORATION
c. SET-XP BY SIMPSON STRONG-TIE
4. ACCEPTABLE EPOXIES FOR ANCHORING TO CMU ARE:
a. HIT-HY 70 BY HILTI CORPORATION
5. THREADED STEEL RODS SHALL BE UNGREASED WITH Fy=58KSI AND Fu=72KSI MIN, UNO
EXPANSION BOLT AND ADHESIVE ANCHOR INSTALLATION REQUIREMENTS:
A. HOLES SHALL BE DRILLED USING A COARSE CUTTING ROCK CHISEL OR HAMMER DRILL.
CORE DRILLS OR OTHER SMOOTH CUTTING DRILLS ARE NOT ALLOWED.
B. HOLES SHALL BE THOROUGHLY CLEANED WITH A BRUSH, THEN VACUUMED OR BLOWN
CLEAN WITH OIL-FREE COMPRESSED AIR TO REMOVE ALL RESIDUE FROM THE DRILLING
OPERATION
C. EXPANSION BOLTS AND EPOXY ANCHORS SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS
RIDGE
8:
8:
A
B
8:12
6'
5"
HIP
HIP
GIRDER TRUSS
T.O. BEAM
111'-1"
T.O. BEAM
109'-10 5/8"
W8x21
18' - 4"
S-502
S-502
SIM
S-501
S-501
S-501
S-501
S-501
S-501
SIM
SLOPE SLAB 1% MIN.
FROM FACE OF
BUILDING
SLOPE SLAB 1% MIN.
FROM FACE OF
BUILDING
12' - 3" 14' - 9"
9'
0"
6' - 8" 4' - 10"
/8
5'
1/
8" 4'
8"
7'
2" 4'
8"
5'
9"
2' - 11 3/8"
3' - 0 3/4"
8' - 9 3/8"
FOOTING BELOW, TYP.
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:5
PM
FOUNDATION AND ROOF
FRAMING PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/2019
649-18-106
19-S-101 88 135
JTBJWV19
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
19-S-101 SCALE: 1/4" = 1'-0"
2 ROOF FRAMING PLAN
# KEY NOTES
1. PRE-ENGINEERED ROOF TRUSSES BY OTHERS AT 24" ON
CENTER, MAXIMUM
2. (2) 1.75x9.25 LVL
3. HSS 3-1/2"Øx1/4" ROUND STEEL COLUMN
4. EXISTING ROOF, FRAMING NOT SHOWN
5. NOT USED
6. (2) 2x10
Revision Date
4' 8'0 2'
SCALE:1/4"=1'-0"
19-S-101 SCALE: 1/4" = 1'-0"
1 FOUNDATION PLAN
GENERAL NOTES
1. SEE S-502 FOR FRAMING DETAILS
# KEY NOTES
1. 4" CONCRETE PAD FOR ATM. (2) #4 REINFORCING BARS AT
18" O.C. EACH WAY, CENTERED IN PAD. ROUGHEN EXISTING
SLAB ON GRADE IN AREA OF NEW PAD. COORDINATE PAD
LOCATION AND OVERALL DIMENSIONS WITH ARCHITECTURE
(19-A-401) AND ATM MANUFACTURER
2. DOWEL HORIZONTAL REINFORCEMENT OF RETAINING
WALLS 6" MINIMUM INTO EXISTING FOUNDATION WALL.
EPOXY USING HILTI HIT-HY 200 OR EQUAL.
3. EXISTING LOADING DOCK TO REMAIN. PATCH AND REPAIR
DAMAGED CONCRETE STRUCTURE. SEE SPECICATION 03 01
00. SEE 19-A-201 FOR ARCHITECTURAL FINISH INFORMATION
6'
6"
/2
3'
3/
4" 9'
3/ 4"
19' - 6 1/2" 6' - 4 3/4"
5'
3/ 4"
12' - 5"
5 3 12' - 4"
TYP.
5 TYP.
8'
3"
9'
5"
8'
9"
7'
6" 9'
/2
COORDINATE WITH STAIR PLACEMENT
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:4
PM
FIRST AND SECOND FLOOR
DEMOLITION PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/19
649-18-106
20-SD101
89 135
JTBJWV20
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
# KEY NOTES
4' 8'0 2'
SCALE:1/4"=1'-0"
20-SD101 SCALE: 1/4" = 1'-0"
FIRST FLOOR DEMOLITION
PLAN
1. REMOVE FLOOR DECK, JOISTS AND BLOCKING AT LOCATION
OF EXISTING STAIR OPENING. PROVIDE TEMPORARY
BRACING FOR FLOOR DURING CONSTRUCTION.
2. REMOVE FLOOR DECK, JOISTS, AND BLOCK AT LOCATION OF
PROPOSED OPENING, COORDINATE LOCATION WITH
ARCHITECTURAL DEMOLITION SHEETS. PROVIDE TEMPORARY
BRACING FOR FLOOR DURING CONSTRUCTION.
3. SAW CUT MASONRY WALL AND ANY ARCHED OPENING. CUT
TO CLEAR HEIGHT OF 9'-6". PROVIDE TEMPORARY BRACING IN
OPENING DURING CONSTRUCTION.
Revision Date
# KEY NOTES
1. REMOVE FLOOR DECK, JOISTS AND BLOCKING BACK TO
BEARING. PROVIDE TEMPORARY BRACING FOR FLOOR ABOVE
DURING CONSTRUCTION.
2. REMOVE FLOOR DECK, JOISTS AND BLOCKING ATTACHED TO
EXISTING STAIR OPENING. PROVIDE TEMPORARY BRACING
FOR FLOOR ABOVE DURING CONSTRUCTION.
3. REMOVE STAIR, RAILINGS, AND ALL ATTACHED HARDWARE.
4. SAW CUT MASONRY WALL AND ANY ARCHED OPENING. CUT
TO CLEAR HEIGHT OF 9'-6". PROVIDE TEMPORARY BRACING IN
OPENING DURING CONSTRUCTION.
5. DIAGONAL BRACES ON CANTED COLUMNS TO BE REMOVED
AFTER THE ADDITION OF FLITCH PLATES, SEE 2/20-S-103 AND
DETAIL 5/20-S-501
20-SD101 SCALE: 1/4" = 1'-0"
SECOND FLOOR
DEMOLITION PLAN
T.O. JOIST
95'-0"
SE
E
AR
C
H
SE
E
AR
C
H
SEE ARCH.
4' - 3"
T.O. JOIST
97'-7 1/2"
4'
1/
2"
SEE ARCH.
5 5
TYP. TYP.
TYP.
(2 ) 1
.7 5x
9.
L
VL
(1 ) 1
.7 5x
9.
L
VL
3A 4A
E
T.O. WALL
99'-7"
S-501
S-501
S-501
S-501
14' - 11 1/2" 16' - 5 1/2" 12' - 0" 81' - 10 1/2" 9' - 8"
4' - 0"
5'
3/
4"
1"
/4
6'
8" 3'
7"
9' - 6"
PRIMARY FRAMING
SECONDARY FRAMING
HANGERS
BUILT-UP 2x POST
SOLID WOOD POST
CMU
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:2
PM
BASEMENT FRAMING AND
FOUNDATION PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/19
649-18-106
20-S-101 90 135
JTBJWV20
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
20-S-101 SCALE: 1/4" = 1'-0"
2 BASEMENT FRAMING PLAN
# KEY NOTES
1. 2x8 JOISTS AT 16" ON CENTER, MAXIMUM.
2. (2) 2x8 AT LANDING SEE DETAIL 2/20-S-501 FOR BEARING AND
FRAMING INFORMATION
3. (2) 1.75x7.25 LVL. AT LANDING SEE DETAIL 2/20-S-501 FOR
BEARING AND FRAMING INFORMATION
4. 4x4 WOOD POST. FASTEN TO SLAB WITH (2) SIMPSON
STRONG-TIE RPBZ POST BASES, OR EQUAL. FASTEN PER
MANUFACTURER'S INSTRUCTIONS
5. CMU INFILL, SEE DETAIL 6/20-S-501
4' 8'0 2'
SCALE:1/4"=1'-0"
Revision Date
20-S-101 SCALE: 1/4" = 1'-0"
1 FOUNDATION PLAN
# KEY NOTES
1. CONTINUOUS RETAINING WALL, SEE S-501
FOR MORE INFORMATION
2. DEPRESS TOP OF RETAINING WALL 5"
SHORT OF FINISH FLOOR TO ALLOW FOR
SLAB. SEE 1/20-A-406 FOR MORE
INFORMATION
3. DOWEL HORIZONTAL REINFORCEMENT
OF RETAINING WALLS 6" MINIMUM INTO
EXISTING FOUNDATION WALL. EPOXY
USING HILTI HIT-HY 200 OR EQUAL.
LEGEND
T.O. JOIST
109'-11 1/4"
T.O. JOIST
109'-11 1/4"
T.O. BEAM
112'-2"
3A 4A
E
T.O. RIM JOIST
109'-11 1/4"
T.O. RIM JOIST
109'-11 1/4"
SE
E
AR
C
H
SE
E
AR
C
H
4' - 6 1/2" SEE ARCH.
4' - 3"
SEE ARCH.
9'
5"
SEE ARCH.
SE
E
AR
C
H
7'
7"
18' - 1 1/2"
5 5 5
R
ID
G E
10 B.O. STEEL
119'-6"
20-S-501
20-S-501
S-502
8:12 8:12
8:
TYP.
HIP
HIP
GIRDER TRUSS
VALLEY
VALL
EY OPEN TO
BELOW
1' - 6"
O
PE
N
BE
LO
W
EQ EQ
T.O. JOIST
104'-10"
T.O. JOIST
99'-11 1/4"
T.O. JOIST
99'-11 1/4"
4'
T.O. JOIST
99'-11 1/4"
T.O. BEAM
99'-11 1/4"
6'
6"
5'
3'
1/
4"
/2
6' - 10" SEE ARCH.
8'
9"
SEE ARCH.
3A 4A
E
T.O. JOIST
105'-11 1/4"
T.O. JOIST
99'-11 1/4"
SEE ARCH. SE
E
AR
C
H
12' - 2"
SEE ARCH.
SE
E
AR
C
H
T.O. BEAM
99'-11 1/4"
B.O. STEEL
109'-2"
B.O. STEEL
109'-2"
B.O. STEEL
109'-2"
S-502
9'
OPEN TO
BELOW
OPEN TO
BELOW
S-501
S-501
6' - 0" 6' - 0"
S-501
S-501
SLOPE SLAB 1% MIN.
FROM FACE OF
BUILDING
T.O. WALL
103'-6"
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:2
PM
FIRST AND SECOND FLOOR /
LOWER ROOF FRAMING
PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/19
649-18-106
20-S-102 91 135
JTBJWV20
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
20-S-102 SCALE: 1/4" = 1'-0"
SECOND FLOOR / LOWER
ROOF FRAMING PLAN
# KEY NOTES
1. ROOF EDGE
2. (2) 1.75x9.25 LVL
3. PRE-ENGINEERED ROOF TRUSSES BY OTHERS AT 24" ON
CENTER, MAXIMUM
4. HSS 3-1/2"Øx1/4" ROUND STEEL COLUMN
5. 1/4" FULL DEPTH STEEL FLITCH PLATE, BOTH SIDES OF
EXISTING BEAM. CONTINUOUS STEEL PLATES, CENTERLINE
TO CENTERLINE OF EXISTING COLUMNS. STOP STEEL
PLATES SHORT 1/8" OF EXISTING STEEL HARDWARE AT
BEAM SPLICES. VERIFY DIMENSIONS IN FIELD.
6. 2x10 JOISTS AT 12" ON CENTER, MAXIUMUM. SEE S-001 FOR
TYPICAL FASTENER INFORMATION
7. (2) 1.75x9.25 LVL
8. (1) 1.75x9.25 LVL
9. (2) 2x10
10. DOUBLE L6x6x5/16, MINIMUM BEARING DEPTH 4" EACH SIDE.
THROUGH BOLT WITH 3/4"Ø A325-N AT 12" ON CENTER, MAX.
11. OVERFRAMING
A. RAFTERS: 2x8 UP TO 6'-0" at 24" O.C., MAX.
B. VALLEY PLATE: 2x4 C. RIDGE BOARD: 2x10
4' 8'0 2'
SCALE:1/4"=1'-0"
Revision Date
# KEY NOTES
1. 2x10 JOISTS AT 12" ON CENTER, MAXIUMUM. SEE S-001 FOR
TYPICAL FASTENER INFORMATION.
2. 2x8 JOISTS AT 16" ON CENTER, MAXIMUM.
3. (2) 2x8. AT LANDING SEE DETAIL 2/20-S-501 FOR BEARING AND
FRAMING INFORMATION
4. 2x10
5. (2) 1.75x7.25 LVL. AT LANDING SEE DETAIL 2/20-S-501 FOR
BEARING AND FRAMING INFORMATION
6. (1) 1.75x9.25 LVL
7. (2) 1.75x9.25 LVL. AT LANDING SEE DETAIL 2/20-S-501 FOR
BEARING AND FRAMING INFORMATION
8. DOUBLE L6x6x5/16, MINIMUM BEARING 4" EACH SIDE.
THROUGH BOLT WITH 3/4"Ø A325-N AT 12" ON CENTER, MAX.
SEE 4/S-502
9. DOUBLE L3-1/2x3-1/2x5/16, MINIMUM BEARING 4" EACH SIDE.
THROUGH BOLT WITH 3/4"Ø A325-N AT 12" ON CENTER, MAX.
SEE 4/S-502
10. 4x4 WOOD POST
11. CMU INFILL, SEE ARCHITECTURE. FOR FULL HEIGHT WALLS,
CENTER ON STONE OR MASONRY WALLS BELOW. 8" NOMINAL
HOLLOW CMU
12. EXISTING LOADING DOCK TO REMAIN. PATCH AND REPAIR ALL
DAMAGED CONCRETE PER SPECIFICATION 03 01 00. SAND AND
PRIME ALL STEEL. SEE 20-A-201 AND 20-A-202 FOR ADDITIONAL
FINISHING INFORMATION
20-S-102 SCALE: 1/4" = 1'-0"
FIRST FLOOR FRAMING
PLAN
HEADER, SEE PLAN
PROVIDE ADDITIONAL KING STUD
AS REQURED- KING STUD NOT
INCLUDED IN POST CALLOUT
(3) 2x6 DENOTES 3 TRIMMERS AND DOES
NOT INCLUDE KING STUD - SEE FRAMING
PLANS FOR COLUMN PACK SIZE
NOTES:
1. PROVIDE A MINIMUM OF (2) 2X4 OR (2) 2X6 TRIMMERS
FOR ALL HEADERS CALLED OUT ON FRAMING PLAN
2. ALL COLUMNS NOTED ON FRAMING PLANS ARE FOR
BEARING UNDER HEADER ONLY AND DO NOT INCLUDE
KING STUD
STEEL BEAM, SEE
PLAN
2x POST EMBEDDED IN WALL
SEE PLAN FOR COUNT
NOTES:
1. USE FOR STEEL, BUILT UP 2x, LVL AND
GLULAM BEAMS AT WOOD FRAME
WALLS
2. SADDLE LEG LENGTH VARIES WITH
BEAM SIZE
3. FOR WOOD BEAMS, SHIM FOR LATERAL
STABILITY AS REQUIRED
PROVIDE KING STUD
EACH SIDE OF BEAM
WOOD BEAM, SEE
PLAN
2x POST EMBEDDED IN WALL
SEE PLAN FOR COUNT
PROVIDE KING STUD
EACH SIDE OF BEAM
DOUBLE ANGLE, SEE PLAN
SEE PLAN
BEARING
4" MIN.
(E) MASONRY WALL
20-S-501
SEE PLAN
(E) MASONRY
1/2"Ø A325-N
THRU BOLT AT
24" O.C.
DOUBLE ANGLE, SEE PLAN
2" M
IN
EXISTING CANTED COLUMN
EXISTING BEAM
FULL DEPTH 1/4" FLITCH PLATE, BOTH
SIDES. CONTINUOUS FROM EXISTING
COLUM TO .
3/4"Ø A325-N THRU
BOLTS STAGGERED AT
16" O.C., MAX.
2"
SEE 1/20-S-103 FOR
DIAGONAL BRACES
TO BE REMOVED
2"
2"
EXISTING RUBBLE
FOUNDATION WALL
CMU BOND BEAM, FULLY
GROUTED WITH (1) #4
REINFORCING BAR
MIN. LAP
1' - 4"
6" MIN. DOWEL
CMU BOND BEAM, FULLY
GROUTED WITH (1) #4
REINFORCING BAR
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:3
PM
STRUCTURAL DETAILS RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/19
649-18-106
20-S-501 92 135
JTBJWV20
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
20-S-501 SCALE: 1 1/2" = 1'-0"
1 TYPICAL HEADER POST
20-S-501 SCALE: 1 1/2" = 1'-0"
2 STUD WALL BEAM SADDLE
20-S-501 SCALE: 3/4" = 1'-0"
NEW LINTEL IN EXISTING
CMU WALL
20-S-501 SCALE: 1 1/2" = 1'-0"
4 NEW LINTEL SECTION
20-S-501 SCALE: 3/4" = 1'-0"
5 FLITCH BEAM DETAIL
1' 2'0 6"
SCALE:1-1/2"=1'-0"
SCALE:3/4"=1'-0"
0 1' 2' 3'
Revision Date
20-S-501 SCALE: 3/4" = 1'-0"
6 CMU WINDOW INFILL
47' - 0 3/4" 34' - 1" 23' - 5 1/4" 22' - 9"
1A 1B
C1
18' - 11 1/2" 50' - 3 3/4" 12' - 0" 74' - 4" 4' - 10"
6'
8" 3'
6' - 2" 5' - 8"
5'
1"
0"
3 3
7'
3/
4"
12' - 0" 7' - 5 1/2"
5'
0"
S-501
S-501
S-501
S-501
S-501
S-501
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:2
PM
FIRST FLOOR DEMOLITION
AND FOUNDATION PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/2019
649-18-106
42-S-101 93 135
JTBJWV42
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
42-S-101 SCALE: 3/16" = 1'-0"
FIRST FLOOR STRUCTURAL
DEMOLITION PLAN
# KEY NOTES
1. REMOVE ELEVATED CONCRETE SLAB
TO FACE OF STRUCTURE. DEMOLISH
ANY ATTACHED STEEL OR CONCRETE
COLUMNS
2. REMOVE STAIRS AND ATTACHED
RAILINGS
3. REMOVE INTERIOR PLYWOOD
SHEATHED SHEAR WALLS AND ALL
ATTACHMENT HARDWARE.
GENERAL NOTES
1. PROVIDE TEMPORARY INTERIOR
BRACING AFTER REMOVAL OF INTERIOR
SHEAR WALLS.
4' 8'0 2'
SCALE:3/16"=1'-0"
Revision Date
42-S-101 SCALE: 3/16" = 1'-0"
2 FOUNDATION PLAN
# KEY NOTES
1. CONTINUOUS SPREAD FOOTING, SEE
S-502 FOR MORE INFORMATION
2. DEPRESS TOP OF RETAINING WALL 5"
SHORT OF FINISH FLOOR TO ALLOW FOR
SLAB. SEE 42-A-402 FOR MORE
INFORMATION
3. DOWEL HORIZONTAL REINFORCEMENT OF
RETAINING WALLS 6" MINIMUM INTO
EXISTING CONCRETE STRUCTURE. EPOXY
USING HILTI HIT-HY 200 OR EQUAL.
4. EXISTING CONCRETE LOADING DOCK TO
REMAIN. PATCH AND REPAIR ALL
DAMAGED CONCRETE PER SPECIFICATION
03 01 00. SEE 42-A-201 FOR FURTHER
FINISHING INFORMATION
T.O. BEAM
110'-8-1/4"
R
ID
G E
4:124:12
11 2
S-502
1A 1B
C 4:
VALL
EY
VALLEY
GIRDER TRUSS
HIP HIP
SW1
SW1
SW1
SW1
SW1
SW1
1A 1B
C
12' - 0"
9'
S-501
S-501
S-501
S-501
S-501
S-501
S-501
S-501
S-501
SLOPE SLAB 1% MIN.
FROM FACE OF
BUILDING
SLOPE SLAB 1% MIN.
FROM FACE OF
BUILDING
6'
0"
4'
0"
4'
0"
SHEAR WALL SCHEDULE
MARK EDGE NAIL SPACING FIELD NAIL SPACING
SW1 8d AT 3" ON CENTER 8d AT 6" ON CENTER
N
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:2
PM
FIRST FLOOR AND ROOF
FRAMING PLANS
RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/2019
649-18-106
42-S-102 94 135
JTBJWV42
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
42-S-102 SCALE: 3/16" = 1'-0"
2 ROOF FRAMING PLAN
# KEY NOTES
1. PRE-ENGINEERED ROOF TRUSSES BY
OTHERS AT 24" ON CENTER
2. (2) 1.75x9.25 LVL
3. HSS 3-1/2"Øx1/4" ROUND STEEL COLUMN,
4. NOT USED
5. EXISTING ROOF, EXISTING FRAMING NOT
SHOWN
6. (2) 2x10
7. OVERFRAMING
A. RAFTERS: 2x8 UP TO 6'-0" at 24" O.C., MAX.
B. VALLEY PLATE: 2x4 C. RIDGE BOARD: 2x10
Revision Date
GENERAL NOTES
1. SEE ARCHITECTURE FOR SHEAR WALL
LOCATIONS
2. PANEL LENGTH TO BE MEASURED FROM
INTERIOR FACE OF FURRED EXTERIOR
WALL
3. SEE SHEAR WALL DETAILS ON SHEET 42-
S-501
42-S-102 SCALE: 3/16" = 1'-0"
FIRST FLOOR FRAMING
PLAN
4' 8'0 2'
SCALE:3/16"=1'-0"
WALL STUDS AT TYPICAL
SPACING
INTERIOR SHEATHING
PROVIDE ADDITIONAL
STUD FOR SHEATHING
ATTACHMENT
EDGE FASTENING
BOTTOM CHORD OF EXISTING TRUSS
STUDS @ 16"
O.C. W/ FIELD
FASTENING
STUD W/ EDGE
FASTENING
PLYWOOD SHEAR
PANEL SEE SCHED.
1/2"Ø x 7" LAG BOLTS AT 16"
O.C. MAX., TYP.
BLO.C.K PANEL EDGES
EDGE FASTENING
4x4 POST AT EACH OF
END OF SHEAR PANEL,
TYP.
SIMPSON PC44
END POST CAP,
TYP ALL 4x4 POST
DOUBLE 2x TOP PLATE
2x SILL PLATE
SIMPSON HD5
HOLDOWN AT EACH
4x4 POST, WITH 5/8"Ø THRU-BOLT EXISTING 4x12, VERIFY IN FIELD
2x BLO.C.KING AT
HORIZONTAL
SHEATHING SPLICES
NOTE:
1. MATCH EXISTING TOP ATTACHMENT, EITHER THROUGH
THE BOTTOM CHORD OF THE JOIST OR INTO SOLID 2x
BLOCKING. FASTEN WITH 1/2"Ø THRU BOLT @ 48" O.C.,
MAX.
4' - 0"
8'
0"
FASTENERS AT 12"
O.C. IN FIELD
FASTENERS AT
4" O.C. AT EDGE
(2) 2x10 HEADER, WITH 1/2" PLYWOOD FILL
PROVIDE ADDITIONAL KING STUD
AS REQURED- KING STUD NOT
INCLUDED IN POST CALLOUT
(3) 2x4 DENOTES 3 TRIMMERS AND DOES
NOT INCLUDE KING STUD - SEE FRAMING
PLANS FOR COLUMN PACK SIZE
NOTES:
1. PROVIDE A MINIMUM OF (2) 2X4 OR (2) 2X6 TRIMMERS
FOR ALL HEADERS CALLED OUT ON FRAMING PLAN
2. ALL COLUMNS NOTED ON FRAMING PLANS ARE FOR
BEARING UNDER HEADER ONLY AND DO NOT INCLUDE
KING STUD
Offic e o f F ac ilit ies
Drawing Title: Project:
Approved Facilities Manager:
Approved Medical Center Director:
Building Number: Checked by: Drawn by:
Date:
Project No.:
Drawing No.:
Dwg of
U.
S.
D ep ar tm en t o f Ve te ra ns A ffa irs
6/
/2
3:
:3
PM
STRUCTURAL DETAILS RENOVATE HISTORIC
BUILDINGS 19, 20, & 42
03/29/2019
649-18-106
42-S-501 95 135
JTBJWV42
V.A. MEDICAL CENTER 500 N. HWY 89
PRESCOTT, AZ 86313
(928) 445-4860
BID DOCUMENTS
42-S-501 SCALE: NTS
1 TYPICAL CORNER FRAMING
42-S-501 SCALE: NTS
2 SHEAR WALL DETAIL
42-S-501 SCALE: NTS
4 TYPICAL SHEAR PANEL
Revision Date
42-S-501 SCALE: NTS
3 TYPICAL HEADER POST
GRADE
SEE CIVIL
4"
1' - 8"
5' - 4"
1' - 4"
U P
TO
'-0
4"
STRUCTURAL COLUMN
BASE PLATE
COLUMN ANCHORAGE, SEE DETAIL 3/S-502
REINFORCED
CONCRETE SLAB
#3 TIE AT 12" O.C., MAX. TYP.
(4) #5 VERTICAL REBARS, TYP.
GRADE: SLOPE AWAY 6" IN FIRST 5'-0"
S-501
SIM
(5) #5 REBAR, CONTINUOUS
IN FOOTING, CENTER IN
FOOTING
#5 REBAR AT 16" O.C., MAX.
3" CLR.
(1) #5 REBAR AT EACH VERTICAL
BAR BENT AS SHOWN, TYP. 36
6"
EXISTING MASONRY
EXISTING FOUNDATION WALL
FINISH FLOOR
100'-0"
2'
2" M
IN
1/2" EXPANSION JOINT, TYP.
1/
2" C
LR
#3 REINFORCING BAR AT 18"
O.C., EACH WAY. CENTER IN
SLAB
1' - 4"
3'
6"
PRE-CAST COLUMN CAP, BY OTHERS
#5 VERTICAL REBAR, TYP.
STIRRUP
HORIZONTAL
REINFORCEMENT,
CONTINUOUS THROUGH
COLUMN
3" CLR.
3" C
LR
3" CLR.
1' - 4"
1'
4"
3" C
LR
GRADE
SEE CIVIL
5' - 4"
REINFORCED
CONCRETE SLAB
#5 VERTICAL REBAR,
AT 16" O.C., MAX.
GRADE: SLOPE AWAY 6" IN FIRST 5'-0"
(5) #5 REBAR, CONTINUOUS
IN FOOTING, CENTER IN
FOOTING
#5 REBAR AT 16" O.C., MAX.
3" CLR.
(1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .