VENDOR RFI001 with VA RESPONSE.pdf
PDF 109 KB Posted
- Solicitation number
- 36C26221Q0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MASTER ELEVATOR-VTU INVENTORY_VA SAN DIEGO.xlsx | XLSX spreadsheet | |
| MASTER ELEVATOR-VTU INVENTORY_VA SAN DIEGO.pdf | ||
| 36C26221Q0006 0001_1.docx | DOCX document | |
| WAGE DETERMINATION RATES SCA WDN 1986-0431 REVISION 52.pdf | ||
| SF1449 RFQ 36C26221Q0006.pdf | ||
| ELEVATOR-VTU LISTING.pdf | ||
| 36C26221Q0006_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name:
Address:
Phone/Fax:
Send to: cecil.nichols@va.gov
RFI
(REQUEST FOR INFORMATION)
PROJECT NO.:
RFI NO.:
PROJECT NAME:
SERVICE to PERFORM Semi-Annual & Annual
Inspection & Certification of
Elevators, VA San Diego
DATE REQUESTED:
09/17/2020
SOLICITATION NO.:
36C26221Q0006
REFERENCE:
DRAWING:
SPECIFICATION
SECTION:
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
1. Per SOW, [paragraph] 5. BACKGROUND: Please confirm that all units require 5-year testing?
2. Please confirm when 5-year testing is due.
3. What month is the current schedule for annual and semi-annual testing?
PROJECT MANAGER’S RESPONSE
1. Yes; all units listed require testing.
2. The 5-year load test is due June 2021.
3. June and December.
AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER:
TIM CONROY, Engineering Technician / COR
DATE:
09/29/2020 mailto:cecil.nichols@va.gov