36C26220R0072-0002001.pdf

PDF Posted

Attached to
J046--Water Treatment Boilers Cooling Towers Long Beach
Solicitation number
36C26220R0072
Issued by

About this file

36C26220R0072 0002 S02 36C26220R0072 0002-RFP amendment 2.pdf

View the file

Other files

File Type Posted
36C26220R0072-0003000.docx DOCX document
36C26220R0072-0003001.pdf PDF
36C26220R0072-0002000.docx DOCX document
36C26220R0072-0001001.pdf PDF
36C26220R0072-0001000.docx DOCX document
36C26220R0072-000.docx DOCX document
36C26220R0072-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 4

0002 02-20-2020 600-20-2-5665-0015 0

00262

Department of Veterans Affairs

Network Contracting Office 22

4811 Airport Plaza Drive

Suite 600

Long Beach CA 90815

00262

Department of Veterans Affairs

Network Contracting Office 22

4811 Airport Plaza Drive

Suite 600

Long Beach CA 90815

To all Offerors/Bidders 36C26220R0072

02-13-2020 X

X X

See CONTINUATION Page

X 1

Water Treatment for the VA Long Beach Healthcare System

The purpose of this amendment is to extend the proposal due date and time to 2/24/2020 at 11:00 am pst.

Please also see below the answers to the questions submitted from the solicitation.

Cooling tower testing results are also attached.

Michael Cordeiro

Contracting Officer

Questions and Answers to

RFP 36C26220R0072

1. Question: Is this a new requirement or a follow-on to an existing contract? If this is a follow-on, please provide the contract number and contractors name.

Answer: Only questions regarding the technical aspect of this solicitation are being answered at this time.

2. Question: Please provide the volume of cooling towers and the blowdown rate.

Answer: Volume is 2940 cubic feet per tower and there four towers. We move approximately

3300 gallons per minute per tower for the most part we have one or two towers running 24hrs a day 365 days a year, in summer and hot we run three to four towers.

Blow down is control by PH balance in the water, and conductivity

3. Question: Please provide the hours of operation.

Answer: 24 hrs. a day 365 days a year

4. Question: What is the current cycle of concentration in the cooler tower and boiler systems? Can you provide any water meter data logs from the past year?

Answer: Concentration is 4.9 There is no current data on the meters.

5. Question: Can you please extend the proposal submission date of the RFP?

Answer: The proposal submission due date will be extended to Monday February 24, 2020 at 11 am pst. The due date will not be extended any further.

6. Question: How much condensate return is received?

Answer: Approximately 65% has been received.

7. Question: Do you currently have automated boiler blowdown and will the controller need to be replaced?

Answer: We do not have a constant blow down, but we do have an automated surface blow down. We do have a controller and it is serviceable and in use.

8. Question: Is there stream line treatment currently being fed?

Answer: Yes

9. Question: Can you share the most recent water test results? If so, please include makeup water to the cooling tower and feedwater to the boiler.

Answer: Yes, please see below for results. We do not have data on cooling tower make up or boiler feedwater.

10. Question: Does the VA want to own the new pumps, controllers, tanks, and containment? Or will the awarding company maintain ownership?

Answer: No. The Contractor is to own, and maintain/service all equipment related to chemical treatment

11. Question: Will VA personnel move delivered drums of chemical from the dock to the containment pallets?

Answer: No, the Contractor will move drums.

12. Question: How much funding has been allocated for this contract?

Answer: This will not be disclosed. Please review the solicitation and submit your proposal accordingly.

13. Question: How will deviations from the current scope of services be handled? For example, if the VA experiences a mechanical or electrical failure that causes greater chemical demand.

Answer: If mechanical failure or electrical failure occurs, the VA will submit credit card request for any additional chemicals used to bring plant and or boiler back to normal balance. It has happened in the past mechanical and electrical failures.

14. Question: What boiler testing is currently being performed by VA personnel?

Answer: Yes, we conduct conductivity, TDS, Water Hardness, and Ph levels

15. Question: Will the test equipment remain in possession of the VA? We noted a MyronL

Conductivity meter on the test bench that seemed to be in working order that could continue to be used.

Answer: Yes, it belongs to VA and it will remain with the VA.

f· l' --

Test

Hardness, Total (ppm as CaCO3)

Hardness, Calcium (as ppm CaCO3)

Alkalinity, P (ppm as CaCO3)

Alkalinity, M (as ppm CaCO3) pH

Chloride as ppm NaCl

PTSA Dye

Conductivity (as mmhos)

Controller Conductivity

Sodium Nitrite (ppm as NaNO2)

Copper (as ppm Cu)

Iron (as ppm Fe)

!@ Conductivity Cycles (Calculated)

@) Chloride Cycles (Calculated)

@ Hardness Cycles (Calculated)

(:) LSI (Calculated w Fixed Temp & Calcium)

IL

II

II

I

II

II

I

Central Plant - Cooling System

C1ly Makeup Cooling Towe, Chill Loop 50 240 um1n JI 1 ,,.. max I

30 210

Om1n ' I 1000 max I

0 100 u m111 11 120 max I

120 520

Om1n 11 soo max I

8.11 9 9.93

11.Bmax 11 9.1 max 11 a.s-·1os J

50 200

0m•n ii 500 max I

23.58

'I 120-150 --, 399 1950 1428

1300max l'I 25110max I Omjn I

I D=n I

800 min

0 0 0

02 max i I 0;21rnax 11,2_max I

0 0 0.13

5max m•x , max

4.9 limn I

4.9

II &max

4.8 II Ii max I

2.5

II 3-max I

I I

I I

S02 36C26220R0072 0002-RFP amendment 2
cooling tower testing results

File details come from the government source that posted it. Updated .