36C26220Q0459-0002000.docx
DOCX document Posted
- Solicitation number
- 36C26220Q0459
About this file
36C26220Q0459 0002 36C26220Q0459 0002.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26220Q0459-0003001.pdf | ||
| 36C26220Q0459-0003000.docx | DOCX document | |
| 36C26220Q0459-0001001.pdf | ||
| 36C26220Q0459-0001000.docx | DOCX document | |
| 36C26220Q0459-003.txt | TXT text file | |
| 36C26220Q0459-001.docx | DOCX document | |
| 36C26220Q0459-002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 03-23-2020 691-20-2-5693-0018 00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 00262 Department of Veterans Affairs Network Contracting Office 22 4811 Airport Plaza Drive Suite 600 Long Beach CA 90815 To all Offerors/Bidders:
36C26220Q0459 03-11-2020
X X
X
1. Amendment 0002 of RFQ 36C26220Q0459 please acknowledge per Section E and sign and return cop ies of all issued amendments (A0001 and A0002).
2. An RFI section answered by VAGLAHS using service is included for Amendment 0002 (pages 2-7).
3. The Amended Price/Cost Schedule (page ) and Amended Statement of Work (SOW) (pages -1 ) is included.
4. All other terms and conditions of this RFQ remain unchanged, in full-force and effect.
Due Date for reciept of quotes re mains 03-27-2020, at 4PM (PST).
Maria Cruz-Thompson Contracting Officer RFI Questions & Answers
Project Name: New Carpet, Flooring, and Painting Project Building 220, 2nd Floor, of the VAGLAHS
Solicitation Number: 36C26220Q0459, Amendment 0002
PART 1:
Question 1 [Contractor] Q: In the RFQ, under the Statement of Work (SOW) (pages 6- 8) states the period of performance to be the following:
7.1 Delivery and installation shall occur within 90 days after contract award;
7.2 The period of performance shall be 30 days from the date of award;
7.3 The period of performance shall be no more than 30 days after receiving the “Notice to Proceed” (NTP) letter from the contracting officer (CO). Can the VA please clarify?
[Using Service] A: RFQ, SOW, Section 7 (page 8 and 9), Period of Performance, is hereby amended to state the following:
7.1. [Amended]: Delivery and installation shall begin within thirty (30) days of receiving the “Notice to Proceed” (NTP) letter from the Contracting Officer (CO); Contractor shall coordinate with the COR for the exact date to start work on the site.
7.2. [Amended]: The period of performance shall be completed in no more than 120 days after receiving the NTP letter from the CO, and no more than ninety (90) days for deduct alternate #5.
7.3. [Deleted]
7.4. [unchanged] RFQ, SOW, Section 6 (page 7 and 8), Tasks, is hereby amended to state the following:
6.9.5. [Added]: Deduct alternate No. 5: Procure for Deduct alternate No 4, except omit item 6.4.
Question 2 Q: Is the period of performance 30 days or 90 days?
A: The period of performance shall be completed in no more than 120 days after receiving the NTP letter from the CO, and 90 days for Deduct Alternate #5.
Question 3 Q: Will the VA please clarify what the duration of the period of performance will be for this project?
A: The period of performance shall be completed in no more than 120 days, and 90 days for alternate # 5, after receiving the NTP letter from the CO.
Question 4 Q: Will the period of performance also include time for submittals such as 30 days?
A: Yes, submittals shall be 30 days or less.
Question 5 Q: We were unable to locate anything in the RFP that stated how long the offers must remain valid from the bid date. Will the VA provide the number of days the offers must remain valid from date of submittal
A: FAR 52.212-1 Instructions to Offerors-Commercial Items (OCT 2018). Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 45 calendar days from the date specified for receipt of offers: due 03-27-2020 @4PM (PST).
Question 6 Q: RFQ, Section 11.3., Page 13 of 48, states: “A reduction in Firm-Fixed Pricing payment of 1% will be deducted each calendar day until the performance standard is met.” This is an unusual requirement for a VA Solicitation and seems to amount to a liquidated damages penalty clause. Will the VA confirm that this clause will be enforced for this project?
A: This section, “Incentives/Disincentives for “Meeting” or “Not Meeting” the Performance Standards” is hereby omitted.
Question 7 Q: RFQ, SOW B.1, Section 3, Page 7 of 48, states: “the working hours will be M-F 8:00 a.m.-4:40 p.m. PDT for this project. Will the VA confirm that this project will take place during normal working hours and that no after-hours or weekend work will be required?
A: Confirmed. Normal business hours only: M-F 8:00 a.m.-4:40 p.m.
Question 8 Q: Specifications were not provided with this RFQ. To ensure a fair bidding process, will the VA provide either a Basis of Design or a Specification Section for the Window Shades, and the New Sink?
A: Window Shades are hereby omitted from scope. KOHLER Staccato, drop-in Stainless Steel (SS) 20” single bowl, model# K-3363-1-NA or equal. Size of sink to be not less than 16”. As an alternative to custom millwork, premanufactured, ADA compliant, solid surface countertop 4’-0” to 6’-0” in length with backsplash and SS sink with some lower storage will be acceptable as long as it can be installed in the space with all gaps closed off on sides with walls with good workmanship, and plumbing can be provided as shown on drawings without disturbing existing wainscot tiles.
Question 9 Q: Sheet 2 of 2 of the Drawings depict new casework. To ensure a fair bidding process, will the VA provide the cabinet and countertop Specifications?
A: P-lam- by Wilson Art, Solid surface by Corian or equal. Provide samples for selection.
Question 10 Q: This facility is known in the past to have asbestos containing materials in certain assemblies. Neither the Drawings nor the RFP mention any hazardous materials or abatement.
a): Does the VA expect any asbestos containing materials or lead-based paint to be encountered, demolished, or disturbed during this project?
b): Will the VA provide a current Hazardous Material Survey for the areas included in the scope of work for this project?
c): Will the VA require the Contractor to perform a Hazardous Material Survey for this project?
d): If a Survey is required, will the VA add 21 days to the Period of Performance to allow for the testing and the return of results?
e): If asbestos or lead-based paint is encountered during this project, will the VA consider this discovery as an “unforeseen condition”?
A: VA confirms that there is no asbestos in floor or walls. There may be lead-based paint in door and window frame paint; sanding of door window frame is not permitted. No HAZMAT abatement of door/window frames will be done by VA and is not in contractor’s scope of work.
Question 11 Q: RFQ SOW Item 6.9., page 8 of 48, states: “Provide samples for kitchen flooring that meets color schemes selected for the remainder of the suite” included below with 6.9 are 4 deductive alternates, items 6.9.1 through 6.9.4.
a): We do not see a “kitchen” on the plans, is this supposed to refer to the break room?
b): If so, the breakroom is called out to receive F3 flooring—is the VA looking for alternate colors?
c): Do these deductive alternates apply to the “Kitchen” only?
d): The deductive alternates listed in the SOW, section 6.9.1-6.9.4 are not included on the price schedule, if these deductive alternates apply, will the VA re-issue the price schedule to reflect the deductive alternates requested (the solicitation document A.2 Price/Cost Schedule requests one lump sum price)?
e): Can you please advise whether there are four kinds of deduct alternates are in the bid?
A: [Amended]: 6.9.4 Deduct Alternate No. 4: Procure for Deduct alternate No. 3, except omit item 6.7.
a) yes, break room.
b) No alternatives requested. Provide samples with submittals per drawings. F3 flooring to match closely with existing West hallway flooring or equal.
c) Abatement of HAZMAT was carried out in the past. There is no HAZMAT in the floor or walls. The doors/door frames and windows are likely to have lead paint in the original paint which is now covered up by subsequent painting. No sanding of doors/windows/frames is required prior to painting.
d) Please see the amended and Revised price schedule (attached):
e) Deduct alternates # 5 now added as: SOW, Section 6.9.5 [Added]: Deduct alternate No. 5: procure for Deduct alternate No 4, except omit item 6.4.
Question 12 Q: The solicitation document states that the estimate completion time is 90 calendar days in SF 18 Request for Quotation block 11(b) and that 7.1. Delivery and installation shall occur within 90 days after contract award, 7.2. The period of performance shall be 30 days from the date of award, and 7.3. The period of performance shall be no more than 30 days after receiving the “Notice To Proceed” (NTP) letter from the contracting Officer (CO) in Request for Quotation Clause B.1.7. Can you please clarify the performance period?
A: Please refer to Question # 1.
Question 13 Q: The RFQ SOW, B.1. Section 6.5., page 8 of 48, states: “…Furniture will be required to move to paint wall surfaces entirely”, can you please advise whether the furniture will be moved for new flooring by contractor also?
A: VA will move furniture only.
Question 14 Q: There are 14 rooms for the project work.
a) Can you please verify that the VA is to hand over all rooms to contractor at a time for the work?
b) If not, can you please advise how many rooms the VA is to hand over to contractor at one time?
A:
a) VA will make available all the rooms under the scope of this project at the same time to the contractor.
b) Room 224A is amended to be omitted from scope altogether.
Question 15 Q: At the site walk it was noted that there is a lot of furniture within the areas scheduled for work. Is the Awarded Contractor responsible for removing and storing all furniture and personal items from employees prior to the start of work or will the VA be responsible for removing & storing furniture?
A: VA will provide empty rooms for storage.
Question 16 Q: Does the VA anticipate this work being completed in phases or will the VA turn over the entire project area at one time for one single phase?
A: Single phase.
Question 17 Q: The RFQ SOW, Section 6.7 and 6.8, page 8 of 48, states to paint the existing ceiling grid.
a): Does the VA expect the awarded contractor to replace any ceiling grid members that are damaged?
b): If replacement is necessary, will the VA please provide a quantity for fair bidding purposes?
A: At this point VA is not aware of any damaged grid; replacement of grid is not expected.
Question 18 Q: At the site visit, Room 202 was found to have an existing hump in the floor that stretched almost across the entire room. Grinding out the hump would be considered outside of the normal floor prep for a flooring contractor. Does the VA expect humps in the floor such as this one to be grounded down?
A: Floor prep is required for any floor slab damage caused by removal of existing flooring and mastic. Grinding may be required for removal of mastic. Any existing hump requiring extensive grinding is not required.
Question 19 Q: In Room 203, where the existing tile wainscot is to remain, and blocking is to be added: does the VA expect the tile wainscot to be removed only where tile is above countertop height?
A: The existing tiles on the walls are to be left alone as they may contain HAZMAT. No abatement is included in the scope of this project. The intent is to install sink and counter without disturbing the tiles. There is a gap in the wainscot on wall where the sink plumbing is to be installed, hence blocking is suggested to fill the gap behind backsplash—between the wainscot only. The Contractor may suggest alternates to cover gap for consideration by VA’s COR.
Question 20 Q: Room 203 has an outlet installed on the north wall in the corner adjacent to the location shown for the casework. Since this outlet must be moved in order to install casework, can this circuit be used as the new GFCI above counter?
A: Yes, the outlet may be left on North wall. The intent is to use it for a coffee maker.
Question 21 Q: In room 203, there is a double gang blank cover on the wall were the new sink and casework is installed; use of the blank cover and box is unknown to the contractor at this time. Is the VA expecting this box to be accessible after casework installation? For example, are we to add an extension ring to the box then re-install the blank cover after casework thus making the box accessible from below countertop?
A: Access to existing cover plate behind casework is not required.
Question 22 Q: In office 206, there appears to be an unfinished shaft of some kind sticking out into the room. Is it in the scope of this project to repair the drywall on this shaft?
A: Drywall replacement is not required. Prep wall as needed with stain removing primer.
Question 23 Q: The SOW does not reference repairing the existing drywall prior to painting. Does the VA expect the contractor to repair old patches and screw holes?
A: Yes, please fill existing screw holes and leave existing screws not removed by VA alone. Patch and repair walls where needed, including rooms 214 and 206, prior to painting.
Question 24 Q: In Room 207, the exterior wall appears to have plaster bubbling below one of the windows: does this need repaired prior to painting?
A: Yes.
Question 25 Q: The existing wood windowsill in room 208 is damaged. Does the VA expect the contractor to repair the wood prior to painting?
A: No.
Question 26 Q: The work required by this RFQ appears to have been completed in room 224A. Can the VA confirm whether the flooring, painting and ceiling grid work in this room is included in this scope?
A: VA confirms Room 224A is excluded from scope of work.
Question 27 Q: During the site walk, it was noticed that there appears to be a door magnet located next to the door coming from the west corridor to the east corridor. The magnet is installed on the floor on the latch side of the door thus being unusable. Can the VA confirm that the door magnet mounted to the floor on the latch side is to be permanently removed?
A: Yes, do not reinstall unusable floor magnet; please hand over to VA facilities.
Continued below:
Project Name: New Carpet, Flooring, and Painting Project Building 220, 2nd Floor, of the VAGLAHS
Solicitation Number: 36C26220Q0459, Amendment 0002 continued:
PART 2:
A.2 PRICE/COST SCHEDULE [AMENDED]
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Department of Veterans Affairs, VA Greater Los Angeles Healthcare System, Building 220, 2nd Floor: Remove and dispose of existing carpet; purchase, deliver and install new flooring materials; paint all walls, doors and door/window frames of areas receiving new flooring; replace existing ceiling tiles with new tiles, and; add new sink with counter in break room. |
| One (1) |
| JOB |
| $_________ |
| $________________ |
| 0002 |
| Provide for 0001 except provide ceiling tiles by Armstrong cirrus ¾” instead of Ultima regular |
| One (1) |
| JOB |
| $_________ |
| $________________ |
| 0003 |
| Provide for 0002 except omit painting of doors, door frames and windows |
| One (1) |
| JOB |
| $_________ |
| $________________ |
| 0004 |
| Provide for item 0003 except omit task # 6.8 on page 8 |
| One (1) |
| JOB |
| $_________ |
| $________________ |
| 0005 |
| Provide for item 0004 except omit task # 6.7 on page 8 |
| One (1) |
| JOB |
| $_________ |
| $________________ |
| 0006 |
| Provide for item 0005 except omit task # 6.4 on page 8 |
| One (1) |
| JOB |
| $_________ |
| $________________ |
GRAND TOTAL: $ ___________________
Project Name: New Carpet, Flooring, and Painting Project Building 220, 2nd Floor, of the VAGLAHS
Solicitation Number: 36C26220Q0459, Amendment 0002 continued:
PART 3:
B.1 STATEMENT OF WORK (SOW) [AMENDED]
Title: RFQ 36C26220Q0459, New Flooring, Carpet Installation and Painting Services for the 2nd Floor, East Wing Offices of the VA Greater Los Angeles Healthcare System.
1. Introduction: The Department of Veteran’s Affairs (VA), Office of Resolution Management (ORM) has a requirement to replace the worn carpet at the Department of Veterans Affairs, VA Greater Los Angeles Healthcare System (VAGLAHS), 11301 Wilshire Blvd., Los Angeles CA 90073. The current conditions are worn and torn aged carpet which presents a safety issue.
2. Background: The ORM strives to provide a safe, clean and productive work environment for VA personnel supporting ORM’s mission. The carpet at the VAGLAHS 2nd Floor, East Wing Offices, needs to be replaced with new flooring materials to enhance the work environment, boost morale, and alleviate associated safety concerns.
3. Place of Performance: Department of Veterans Affairs, VA Greater Los Angeles Healthcare System (VAGLAHS), 11301 Wilshire Blvd., Building 220, 2nd Floor, Los Angeles, CA 90073. Hours of Operation: 8:00AM to 4:40PM (PST).
4. Scope of Work.
4.1. This SOW is for the removal and disposal of the existing carpet; the purchase, delivery and installation of new flooring materials; the painting of all walls, doors and door/window frames of areas receiving new flooring; installing new window shades; replacing existing ceiling tiles with new tiles, and; adding new sink with counter in break room.
4.2. Electrical work is limited to relocating or adding GFCI power outlet at new counter of sink.
4.3. The Contractor shall provide all materials, labor, supervision, coordination, transportation, delivery/shipping, supplies and tools necessary for proper removal, delivery and installation of new materials even though certain items may not be specifically described in the specification.
4.4. The Contractor’s quoted price must be all-inclusive.
4.5. The Contractor’s quote shall include carpet specifications to meet the requirement as described in this SOW.
5. Type of Contract: Firm, Fixed-Price.
6. Tasks. Base bid: procure and provide as listed below:
6.1. Carpet tile 11 offices and one (1) conference room (approximately 3,543 square feet total) (See attached site drawing A1; Verify dimensions in field);
6.2. Luxury vinyl tile in break room, copy room, and conference room storage to match exactly with existing tile found in the West side of hallway (See attached drawing A1; verify all dimensions in field);
6.3. Provide 6” vinyl wall base at carpet: Burke LVT floors;
6.4. Paint all the walls in all the rooms and East hallway plus hallway ceiling (approximately 8200 square feet) with Dunn Edwards paint, eggshell finish (See Drawing A1 for colors and room dimensions; verify in field);
6.5. Paint 18 doors (both sides), door frames, and 26 window frames (inside only) in the area of remodel. Furniture will be required to move to paint wall surfaces entirely;
6.6. Provide a counter in Room 203 with a stainless-steel ADA compliant sink and base cabinet as shown on drawing A2. Provide associated plumbing and a GFCI power outlet above counter;
6.7. Replace acoustic ceiling tiles and paint ceiling grid in Conference Room 214 and Office 207 only; Ceiling tile used shall be Ultima Tegular by Armstrong;
6.8. Replace acoustical ceiling tiles in all the area of remodel (other than Conference Room 214 and Office 207) and paint ceiling grid. Ceiling tile used shall be Ultima Tegular by Armstrong;
6.9. Provide samples for kitchen flooring that meets color schemes selected for the remainder of the suite;
6.9.1. Deduct Alternate No. 1: Procure for base bid, except provide ceiling tiles by Armstrong cirrus ¾” instead of Ultima regular;
6.9.2. Deduct Alternate No. 2: Procure for Deduct Alternate No. 1, except omit painting of doors, door frames and windows;
6.9.3. Deduct Alternate No. 3: Procure for Deduct Alternate No. 2, except omit item 6.8;
6.9.4. Deduct Alternate No. 4: Procure for Deduct alternate No. 3, except omit item 6.7.
6.9.5. Deduct alternate No. 5: Procure for Deduct alternate No 4, except omit item 6.4.
7. Period of Performance.
7.1. Delivery and installation shall begin within thirty (30) days after receiving the “Notice To Proceed” (NTP) letter from the Contracting Officer (CO); Contractor shall coordinate with the COR for the exact date to start work on the site.
7.2. The period of performance shall be completed in no more than 120 days after receiving the NTP letter from the CO, and no more than ninety (90) days for deduct alternate # 5.
7.3. Any overtime or holiday pay that may be entitled to the Contractor’s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government;
7.4. The Contractor is not required to provide service on the following U.S. Government holidays nor shall the Contractor be paid for these days (this includes any specific day declared a holiday by the President of the United States):
| New Year’s Day |
| January 1 |
| Martin Luther King ‘s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Independence Day |
| July 4 |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veterans Day |
| November 11 |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25 |
8. Requirements.
8.1. The Contractor shall be qualified and experienced to install all types of floor coverings. No unqualified worker shall do any type of work related to this project without the direct supervision of qualified personnel.
8.2. The Contractor shall conduct a site visit to verify site conditions and for verifying the quantity of flooring product(s) required;
8.3. The Contractor shall notify the ORM Contracting Officer Representative (COR) Jahaira Thompson in writing of any site conditions that may impair or prevent completion of the project as planned.
8.4. The Contractor shall provide samples of flooring materials as requested for approval before ordering materials.
8.5. The Contractor shall provide a detailed work plan, schedule, shop drawing of counter, and briefing on the project which presents the contractor’s plan for completing the work.
8.6. The Contractor shall provide all encompassing pricing of flooring materials, supplies, labor costs, carpet removal and delivery/shipping costs.
8.7. The Contractor shall verify all flooring product quantities before ordering.
8.8. The Contractor shall obtain approval by ORM COR Jahaira Thompson before beginning any work.
8.9. The Contractor shall prep floor to accept new flooring in accordance with the new carpet manufacturer’s requirements and specifications. Floor prep includes removal of any existing adhesive and filling of any holes in the floor if found.
8.10. The Contractor shall install new floor covering in accordance with manufacturer’s specifications.
8.11. The Contractor shall install 6” vinyl coved base at all new carpet/vinyl areas.
8.12. The Contractor shall install trims and/or transition strips as needed to allow smooth transition from new flooring to immediate adjacent surfaces.
8.13. The Contractor shall provide carpet manufacturer documentation providing material specifications. Material must be compatible for commercial office settings; all carpet must follow EPA standards.
8.14. The Contractor shall verify paint samples before application from designated ORM COR Jahaira Thompson.
8.15. Upon completion of installation, the contractor shall remove all unused materials, containers, wrappings, cuttings, trimmings and any other debris which has accumulated as a result of this service and transport/dispose of as required by law. Areas shall be left clean.
8.16. The Contractor will be liable for any damages to walls, furniture, floors, elevators or carpeting that occur during installation. The Contractor shall repair or replace any finishes to match with existing finishes if damaged during construction at no cost to VA.
8.17. The Contractor shall develop a punch list and perform repairs and replacements within seven (7) days after completion of installation.
8.18. The Contractor shall obtain certification of completion of work from ORM COR Jahaira Thompson.
8.19. The Contractor shall submit invoice for payment to the ORM COR for all completed work.
8.20. The Contractor shall obtain a security clearance from the VAGLAHS Human Resource Security office, Building 218, ground floor, for all construction workers who will be working on the site prior to start of work. Allow 2 to 3 weeks for processing of clearance.
9. Deliverables.
9.1. The Contractor shall provide a proposal inclusive of all associated costs that will be billed to the Department of Veteran’s Affairs, ORM, and submit those costs to the ORM COR.
9.2. The Contractor shall remove and properly dispose of the existing carpet, deliver and install the new flooring material(s), remove any debris, and cleanup workspace not later than 30 days from contract award.
| Task/Deliverable |
| Frequency |
| # of Copies |
| Medium/Format |
| Submit To |
| Obtain approval of detailed work plan |
| 1 occurrence |
| 1 |
| Email, hardcopy, or Microsoft Office Word document 97 -2010, or PDF. |
| COR |
| Deliver BPI’s to COR |
| 1 occurrence |
| 1 |
| Email, hardcopy, or Microsoft Office Word document 97 -2010, or PDF. |
| COR |
| Onsite assessment |
| 1 occurrence |
| 1 |
| In person |
| COR |
| Notify COR of site conditions which may delay work |
| Always |
| 1 |
| Email, hardcopy, or Microsoft Office Word document 97 -2010, or PDF. |
| COR |
| Certificate of Insurance |
| UPON REQUEST (One time, at least 1 week prior to commencement of work) |
| 2 |
| Email, hardcopy, or Microsoft Office Word document 97 -2010, or PDF. |
| COR and Building Management Company |
| Name of Contractors representative, supervisor, crewmembers |
| One time, at least 1 week prior to commencement of work |
| 1 |
| Email, hardcopy, or Microsoft Office Word document 97 -2010, or PDF. |
| COR |
| Receipt of NTP Letter |
| 1 occurrence |
| 1 |
| Hardcopy or PDF |
| CO |
| Receipt of COR Delegation Memo |
| 1 occurrence |
| 1 |
| Hardcopy or PDF |
| CO |
10. Supporting Information.
10.1. Security.
10.1.1. No less than one (1) week prior to commencement of work, the contractor shall provide the COR with a list of contractor staff participating in the work and the following information:
10.1.1.1. Company Name, Address, Telephone Number;
10.1.1.2. Name of each individual contractor employee and position title.
10.1.2. The Contractor shall be responsible for confining its’ crew and work to the designated project areas;
10.1.3. The contractor be responsible for ensuring that the installation personnel are identifiable.
10.2. Certificate of Insurance: A Certificate of Insurance (COI) shall be provided upon request.
10.3. Parking: Onsite parking will be available.
10.4. Hours of Operation and Information.
10.4.1. Delivery of materials and installation to 11301 Wilshire Blvd., Building 220, 2nd Floor Los Angeles, CA 90073 will be from 8:00 AM to 4:30 PM (PST) excluding Federal Holidays.
10.4.2. Flooring materials and worker tools will be unloaded in the front of the building and taken immediately to the work area.
10.4.3. The Contractor shall Notify the ORM COR to arrange for delivery schedule. Any after hour delivery would have to be coordinated with the ORM COR Jahaira Thompson.
10.5. Delivery and Acceptance.
10.5.1. The Contractor shall coordinate the delivery of the flooring materials with ORM COR Jahaira Thompson.
10.5.2. The scheduled start date will be coordinated between the Contractor, ORM COR Jahaira Thompson and VAGLAHS Project Manager Naveed Subhan after contract award with the Contractor. The schedule is subject to change as deemed necessary.
10.6. Clean Up.
10.6.1. The Contractor shall clean up and dispose of waste materials/trash in accordance with all applicable federal, state and local regulations, standards, codes and laws and in accordance with section 10.6 of the SOW.
10.6.2. The contractor shall make any necessary arrangements with private parties and with county officials pertaining to locations and regulations of such disposal. Any fees or charges for disposal of materials shall be the responsibility of the contractor.
10.6.3. The contractor shall always keep the job site, including staging and storage areas used by the contractor, free from accumulations of waste material or rubbish which shall be removed daily to eliminate the accumulation of debris.
10.6.4. Prior to completion of the work, the contractor shall remove from the vicinity of the work all shipping containers, packing, rubbish, unused materials, and other like material, belonging to the contractor or used under the contractor’s direction.
10.6.5. Under no circumstances will eating and drinking be allowed on the installation site by the Contractor.
10.7. Inspection: As stated in section 8.16 of the SOW, the contractor will be responsible for any damage to the building occurring during delivery and installation. As such, it is incumbent upon the Contractor to identify any existing damage to the building by means of a Pre-Installation and Delivery Walk-Thru, and daily submissions of checklists to the designated agency representative on site. Proper measures (e.g., protective runners; pads) shall be utilized by the Contractor to protect building infrastructure (i.e., elevators, walls, floors).
11. Performance Measurements.
11.1. Specific requirements include, but not limited to the following:
11.1.1. Installation plan;
11.1.2. Purchase of new flooring material(s);
11.1.3. Removal of existing carpet/Installation of new flooring material(s).
11.2. Performance measurement factors are as follows:
11.2.1. All coordination’s needed for this project have been completed and adhered to, consistent with VA requirements and specifications;
11.2.2. A thorough inspection with the Contractor will produce a “punch” list that will be completed as part of the project requirement;
11.2.3. All items delivered are consistent with contract terms.
11.3. The table below defines the Performance Standards and Performance Target associated with this effort:
Performance Measure
| Requirement Objective Supported |
| Method of Measurement |
| Performance |
Target Incentives/Disincentives for “Meeting” or “Not Meeting” the Performance Standards
| Flooring Material(s) |
| Delivery/installation of flooring material(s) |
| Accuracy and timeliness of performance of task |
| 100% of flooring material(s) delivered and installed in no more than 120 days, and 90 days for alternate # 5, after receiving the NTP letter from the CO. |
| N/A |
| Deliverables |
| Contractor is timely in providing appropriate deliverables |
| Accuracy and timeliness of performance of task |
| 95% completed and delivered within the guidelines set forth in the SOW |
| N/A |
12. Contractor Responsibilities: Unexpected conflicts during product installation must be brought to the ORM COR Jahaira Thompson within one (1) hour of discovery for resolution and implementation. Resolutions may include, but not limited to the following:
12.1. The Contractor shall correct (at the Contractor’s expense) any installation problems which are the result of delays, delivery errors, and damaged product;
12.2. The Contractor shall immediately remove from the premises all wrong/incorrectly shipped materials and damaged materials, unless otherwise authorized by VA;
12.3. Damaged and/or missing product will be replaced via means that will prevent installation delays. Damaged product replacement will be at the Contractor’s expense and all damaged product shall be removed from the job site immediately;
12.4. Within 24 hours after completing the product installation, the Contractor shall be present to walk through the workspace with VA representatives to verify working conditions, assess the quality of flooring installation, and jointly prepare a punch list of outstanding items;
12.5. The Contractor will be responsible for correcting punch list items within 30 working days after the walk-through verification;
12.6. Once all punch list items have been completed, a final walk-through by VA representatives and the Contractor will take place; the final walk-through shall be coordinated with VA;
12.7. The Contractor shall be responsible for managing the delivery and installation of the product on schedule and in accordance with contract requirements;
12.8. Final measurements and drawings are the responsibility of the Contractor. Final measurements will be taken after contract award to verify all dimensions (critical and non-critical) are accurate.
12.9. Any/all excess flooring tiles shall be neatly left at the site with VA Project Manager Naveed Subhan.