36C26218R0720-003.pdf
PDF 301 KB Posted
- Solicitation number
- 36C26218R0720
About this file
36C26218R0720 Annual Inspection Checklist.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| -14344.docx | DOCX document | |
| 36C26218R0720-A00001000.docx | DOCX document | |
| 36C26218R0720-002.pdf | ||
| 36C26218R0720-001.docx | DOCX document | |
| 36C26218R0720-005.pdf | ||
| 36C26218R0720-004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G u ld m a n n
G B
-1
/1
/1
Periodic Inspection according to
DS/EN ISO 10535:2006
12-month inspection of hoist and rail systems
Checklist
1. Rail System:
Check that all brackets are tightened with correct torque to the ceiling/wall- 3/8"-34Nm
Check that all brackets are tightened with correct torque to the rail system- 17mm-54Nm
If not possible, do a load test with 1.5 x rated load for 20 min.
Check reinforcement
If not possible, do a load test with 1.5 x rated load
Check and re-tighten end stops and check they are secured with pins
Check that brackets are placed over all rail joints
Check that a sticker with max. load is placed on hoist and rail system (max. load on hoist must be equal or less than the rail system)
If no sticker is placed on the rail system, check the distance between brackets according to the Installation Guide and place a sticker with rated load after a load test with 1,5 x rated load for 20 min.
Do a load test with rated load through the entire system
Place a sticker with a new date for next inspection
2. Electrical connections:
Check that all cables are intact
Check that all cables are secured with a cable relief inside the transformer.
Check for rupture on cables and on isolation
Check for correct earth connection if this is established
Check that no cables with 110v/220v are in contact with the rail system
Check that cables have the right length (not turned up)
3. Combi-Lock:
Check that safety locks are installed correctly and are intact
Check for dust, etc. inside rails where safety locks are mounted
Check that they open and close easily
Check for corrosion on the safety locks (in case of corrosion, change them)
Check the function of the safety locks with and without traverse rail (must not open without traverse rail)
4. Turntable:
Check the bearings.
5. Switch track:
Check that tongue moves fully and easily.
6. Hoist GH2/GH3
Check connection between trolley and hoist. All locking rings must be intact.
Original pins are used to secure GH3 to trolley
Check connection of strap to the hoist.
Check the strap fraying
Check the stop on the hoist and on the strap for cracks or broken parts
Check the lifting strap, in must be intact (the whole length)
Check the strap to the hoist. Unreel and pull hard
Check connection between strap and hanger
6. Hoist GH2/GH3- continued
Check the emergency stop
Check the emergency lowering
Do a full lifting cycle with rated load – must be effortless and without jarring sound
Update hoist software via SIC program
Place a sticker with a new date for next inspection
Check that the scale is functioning and calibrated.
7. Lifting Hanger-GH2
Check welding
Check sling attachment– must not be bent or worn out.
Check for abnormal space between hanger and swivel
8. Lifting Hanger- GH3
Check hanger attachment safety mechanism for correct function
Check sling attachment rubber finger for correct function and wear
Check for damage to plastic covers that could compromise use of the hanger
Comments:
Inspection Location (Facility Name):
Room Number:
Serial Number:
Inspection Date:
Inspected Company Name:
Inspected by:
Facility representative:
File details come from the government source that posted it.