36C26218Q0225-003.pdf
PDF 35 KB Posted
- Solicitation number
- 36C26218Q0225
About this file
36C26218Q0225 D.2 - LIST OF EQUIPMENT REQUIRING 5 AND 20 YEAR BASELINE INSPECTION.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26218C0068-000.docx | DOCX document | |
| 36C26218Q0225-007.docx | DOCX document | |
| 36C26218Q0225-009.xlsx | XLSX spreadsheet | |
| 36C26218Q0225-008.docx | DOCX document | |
| 36C26218Q0225-012.pdf | ||
| 36C26218Q0225-011.pdf | ||
| 36C26218Q0225-010.pdf | ||
| 36C26218Q0225-005.pdf | ||
| 36C26218Q0225-000.docx | DOCX document | |
| 36C26218Q0225-001.docx | DOCX document | |
| 36C26218Q0225-006.xlsx | XLSX spreadsheet | |
| 36C26218Q0225-004.pdf | ||
| 36C26218Q0225-002.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 1: Tank Integrity Program - Requiring Steel Tank Institute SP001 Inspection by Certified SPI Inspector
Tank Location
Contents and Capacity Comments and Details Inspection
Due Type of
Inspection
Tank 12 Tank Configuration: Double-Walled, Horizontal Tank 2018 5 Year
5000 Gallon Diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Tank 215 Tank Configuration: Double-Walled, Horizontal Tank 2018 5 Year
20,000 gallon Diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Tank 222 Tank Configuration: Double-Walled, Horizontal Tank 2018 5 Year
1525 gallons Diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Tank 299 Tank Configuration: Double-Walled, Horizontal Tank 2018 5 Year
2000 gallons Diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Tank 501 Tank Configuration: Double-Walled, Horizontal Tank 2018 5 Year
20,000 gallons diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Tank 1 Tank Configuration: Single Wall Horizontal Tank with berm 2018 20 Year
5,000 gallons diesel
Inspection or Test Method Comments: Tank is equipped with interstitial monitoring device.
Monthly Visual Tank Inspections Performed. Integrity Testing Conducted in Accordance with STI Standards-001. External Tank inspections performed every 5 years by an authorized inspector.
Internal inspection shall be performed every 20 years.
Los Angeles Ambulatory
Clinic
West Los Angeles MC
West Los Angeles MC
West Los Angeles MC
West Los Angeles MC
West Los Angeles MC
Sheet1
File details come from the government source that posted it.