36C26218Q0216-002.docx

DOCX document 55 KB Posted

Attached to
Lab- VISN Wide Infectious Molecular Pathology (HIV/HCV/HPV) CPT BPA Revise RFQ Terms
Solicitation number
36C26218Q0216
Issued by

About this file

36C26218Q0216 S02 36C26218Q0216 - Attachment A - Statement of Work.docx

View the file

Other files

File Type Posted
36C26218Q0216-00001002.docx DOCX document
36C26218Q0216-00001001.pdf PDF
36C26218Q0216-00001003.docx DOCX document
36C26218Q0216-00001005.doc DOC document
36C26218Q0216-00001004.xlsx XLSX spreadsheet
36C26218Q0216-00001000.docx DOCX document
36C26218Q0216-001.docx DOCX document
36C26218Q0216-004.doc DOC document
36C26218Q0216-000.docx DOCX document
36C26218Q0216-003.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A - STATEMENT OF WORK

VISN 22 Infectious Molecular Pathology Cost Per Test (CPT) Blanket Purchase Agreement (BPA)

1. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

1.1. SCOPE OF PROCUREMENT:

1.1.1. The desired instrumentation shall have the capability of performing or reporting the clinical parameters as defined within this statement of work. The instrument will be able to simultaneously perform the complete profile as described below and meet the performance characteristics for accuracy and precision as defined by the 1988 Clinical Laboratory Improvement Act (CLIA) and the Clinical and Laboratory Standards Institute (CLSI).

1.1.2. Equipment shall maintain, or preferably reduce the number of work stations or overall labor required to accomplish the required testing by each laboratory.

1.1.3. If Contractor offers a family of analyzers, VISN 22 technical evaluation panel will determine if instrumentation proposed meets needs of using facility.

1.1.4. The Contractor is required to provide a continuously stocked inventory of reagents, standards, controls, supplies, disposables and any other materials required to properly perform tests on the equipment such that equipment operations are not interrupted. These items shall be of the highest quality, sensitivity, specificity and tested to assure precision and accuracy. Expiration date shall be clearly marked on reagent, standards and control containers. Unexpected changes in methodology/technology shall be at the expense of the Contractor. Alert/Notification of any delays in shipment as well as any or all technical advisory/recalls/alerts, prior to or simultaneously with field alerts shall be forwarded to the designated individuals determined at contract award.

1.1.5. Special handling for emergency orders of supplies: In the event that the supplies are found to be defective and unsuitable for use with the Contractor’s equipment, or the Contractor has failed to comply with the requirements for routine supply delivery, the Contractor is required to deliver the supplies within 24 hours of receipt of a verbal order for emergency delivery. If either circumstance has occurred, the Contractor shall deliver to the Government site in the most expeditious manner possible without additional cost to the Government, the necessary consumables in sufficient quantity as required to allow operation of the Contractor’s equipment for one week (under normal Government test load volume). If additional requests for emergency supply delivery are required by the Government, they shall be honored by the Contractor until the arrival at the laboratory of the monthly standing order/routine supplies delivery.

Meets the minimum requirement described in Section 1.1 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.2. DEFINITIONS:

1.2.1. Cost per Test (CPT) - as defined in the Federal Supply Schedule FSC Group 66, Part III, Cost-Per-Test Clinical Laboratory Analyzers – Contractors are required to provide a price for each test that can be performed on its equipment. The per test price shall include costs covering (1) 5 year equipment use, (2) all reagents, standards, quality controls, supplies, consumable/disposable items, parts, accessories and any other item required for the proper operation of the Contractor’s equipment and necessary for the generation and reporting of a test result, (3) all necessary maintenance to keep the equipment in good operating condition (This element includes both preventive maintenance and emergency repairs) and (4) training for Government personnel. Contractors are required to provide delivery, installation and removal of equipment at no additional charge.

1.2.2. Business Associate Agreement (BAA) - A business associate is an entity, including an individual, company, or organization that, on behalf of VHA, performs or assists in the performance of functions or activities involving the use or disclosure of PHI, or that provides certain services involving the disclosure of protected health information (PHI). VHA is a covered entity under the HIPAA Privacy Rule (Privacy Rule). HIPAA regulations require VHA to execute HIPAA-compliant BAAs with certain entities that receives, uses, or discloses VHA PHI in order to perform some activity for VHA. These BAAs obligate VHA business associates to provide the same protections and safeguards to PHI that is required of VHA under the Privacy Rule.

1.2.3. Parameter definitions -

1.2.3.1. HIV Viral Load

1.2.3.2. HCV Viral Load

1.2.3.3. HPV Test

1.2.3.4. CT/NG Tests

1.3. TEST MENU: Refer to Attachment B for required test menu and estimated annual volumes.

Able to perform all the tests listed in Attachment B (y/n)?

File name of Contractor’s attachment, if providing additional supporting documentation:

1.4. PRICING: Submit pricing in Format as defined on Attachment B.

1.5. GENERAL REQUIREMENTS:

1.5.1. Primary analyzer(s) - Base equipment offered that shall fully support the scope of operations (minimal requirements). Depending upon the technical functionality and the capabilities of the individual manufacturer’s instrumentation, one analyzer or multiple analyzers may be required to meet the productivity specifications defined herein. In those instances, the additional analyzer(s) shall, likewise, be considered primary instrumentation and shall meet all of the technical specifications of this solicitation. Those additional analyzer(s) offered meeting the definition of a primary analyzer shall be equivalent to a back-up analyzer (see definition below) and shall replace the requirement for offering that category of equipment.

Able to meet the instrument requirements listed above and in Section 1.5.1 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.2. Contractor shall provide assayed quality control material at a minimum of two levels; normal and elevated/abnormal levels.

Meets the minimum requirement described in Section 1.5.2 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.3. Operational Features - The instrumentation offered shall have the following:

1.5.3.1. The capability of performing analysis on 100% of the tests listed in Attachment B.

1.5.3.2. Sufficient capacity and throughput to meet the volume and service demands as defined in Attachment B.

1.5.3.3. Safety features to avoid unnecessary exposure to biohazardous and chemical material. The exposure to and the volume of biohazardous and chemical material generated by the equipment shall be minimal and require a minimum amount of handling.

1.5.3.4. A bi-directional, bar-coded computer interface compatible with the current VA laboratory information system. The fully operational interface (both hardware and software) shall be immediately available for implementation to the VA computerized hospital information system.

1.5.3.4.1. The accuracy of the barcode reading shall have less than a 1% failure rate.

1.5.3.4.2. Equipment shall be able to support multiple barcode formats (Code 39, Code 128) that may be enabled concurrently.

1.5.3.4.3. Equipment shall accept, at a minimum, 13 characters in specimen identifier that is alphanumeric

1.5.3.5. Minimal daily, monthly, and periodic maintenance.

1.5.3.6. Ability to store and retransmit records (24 hours of maximal instrument throughput) in case of interface outage.

1.5.3.7. Ability to accept various types of sample containers.

1.5.3.8. An on-board refrigeration system for reagents.

1.5.3.9. Minimum eight (8) hour stability of quality control (QC) material.

1.5.3.10. Capability to detect out of range quality control.

1.5.3.11. Ability to automatically program the performance of QC testing.

1.5.3.12. On board reagent stability sufficient to accommodate both high and low volume use. Contractor to provide expiration dates of at least 12 months for reagents.

Meets the minimum requirement described in Section 1.5.3 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.4. Technical Features - The instrumentation shall be approved by the Food and Drug Administration (FDA) and shall have the following:

1.5.4.1. Ability to monitor instrument performance.

1.5.4.2. On board reagent inventory system.

1.5.4.3. Minimal carryover.

1.5.4.4. Minimal reagent, calibrator, and control preparation.

Meets the minimum requirement described in Section 1.5.4 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.5. Hardware Features - The instrumentation shall have the following:

1.5.5.1. A total equipment footprint that when installed in the laboratory shall not impact the functionality/operations of that laboratory.

1.5.5.2. An on-board monitor/screen that is easily readable.

1.5.5.3. A printer that has the capability of printing a patient report with patient demographic information that includes minimally the accession or unique identifier number (UID).

1.5.5.4. An uninterruptible power supply with line conditioner for each instrument provided.

1.5.5.5. Primary tube sampling.

Meets the minimum requirement described in Section 1.5.5 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.6. Specific Equipment Requirements -

1.5.6.1. Ready to use reagents. No preparation requirement. Reagents able to be directly loaded with tracking performed by RFID chips.

1.5.6.2. Pre-calibrated reagents, no user calibration required.

1.5.6.3. Direct loading of wide variety of different tube types without presorting requirements, or need to sort by assay type.

1.5.6.4. Continuous loading: The system permits loading of samples, consumables, and reagents while it is in operation.

1.5.6.5. Automated ordering workflow directly from the tube.

1.5.6.6. Loading sample capacity of up to 350 tubes on board.

1.5.6.7. Loading throughput of 384 samples per 8 hour shift with 30 minutes of hands on time.

1.5.6.8. On board reagent refrigeration.

1.5.6.9. Walkaway time 8 hrs. when running at full capacity.

1.5.6.10. No daily maintenance.

1.5.6.11. Flexible run sizes: Operator has full flexibility in determining the number of tests per run.

1.5.6.12. Need to be able to create up to 3 aliquots from a single sample.

Meets the minimum requirement described in Section 1.5.6 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.7. Analyzer utilizes windows operating software.

Meets the minimum requirement described in Section 1.5.7 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.8. Method Performance/Validation Requirements -

1.5.8.1. Method performance/comparison shall be at the expense of the Contractor, shall include linearity material and reagents as required or recommended based on manufacturer’s specifications, and be consistent with current CLSI guidelines and related documents, College of American Pathologists (CAP) standards and Federal regulations The method validation will include the following:

1.5.8.1.1. Correlation studies for each analyte. A minimum of 50 samples spanning the reportable range shall be run by the present and the proposed method. Contractor shall analyze results and provide statistical data to support acceptance of the new method. Statistics shall consist of at least mean, bias, slope, y-intercept, correlation coefficient, and meet current standards defined by CLSI.

1.5.8.1.2. Analytical Measurement Range (AMR) Validation shall be performed on proposed instrument(s) for each analyte to validate the reportable range when applicable. The material shall have values, which are near the low, mid, and high values of the AMR and be of appropriate matrix for the clinical specimens assayed by that method. A minimum 5-point linearity analysis that adheres to the Beer-Lambert Law and spans the entire range shall be performed as a minimum.

1.5.8.1.3. Precision study using normal and abnormal control material. This shall consist of a within run precision study of 10 normal and 10 abnormal controls and a day-to-day precision study of normal controls and abnormal controls for 10 days (may be run twice a day) for a total of 20 values per level of control. Where applicable, intra-VISN facility variations shall be kept at an absolute minimum.

1.5.8.1.4. Sensitivity. Sensitivity may be validated concurrently with correlation studies. Mathematical calculations to determine efficiency, sensitivity, false positive rate and false negative rate are applied.

Meets the minimum requirement described in Section 1.5.8 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.9. Specificity Studies. A review of product literature and assay inserts to determine any adverse effects for interrupting substances.

Meets the minimum requirement described in Section 1.5.9 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.10. Assay Detection – Specific Requirements

1.5.10.1 HIV Viral Load test must have the following features:

1.5.10.1.1 The HIV test must be designed with dual target amplification – two regions are targeted, the gag and LTR regions which are highly conserved and not current drug targets.

1.5.10.1.2 The HIV test must include a QS (Quantitation Standard) that acts as an internal control and is co- amplified with the target for the purpose of titer calculations within each reaction.

1.5.10.1.3 AmpErase enzyme must be included in each reaction to ensure degradation of carry-over amplicon from prior reactions.

1.5.10.1.4 The HIV viral load test must have a linear range of 20 copies/mL - 10,000,000 copies/mL.

1.5.10.1.5 The HIV test must require only 650 ul of sample of which 500 is processed.

1.5.10.1.6 The HIV test must have a moderate complexity classification.

Meets the minimum requirement described in Section 1.5.10.1 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.10.2 HCV Viral Load test must have the following features:

1.5.10.2.1 The HCV Viral Load must be a monitoring assay with a confirmatory claim to be used as an aid in diagnosis of HCV infection.

1.5.10.2.2 The HCV test must have a dual probe design that provides built in redundancy against current and potential future polymorphisms

1.5.10.2.3 The HCV test must have a moderate complexity classification.

1.5.10.2.4 The HCV test must require only 650 ul of sample of which 500 is processed.

1.5.10.2.5 AmpErase enzyme must be included in each reaction to ensure degradation of carry-over amplicon from prior reactions.

1.5.10.2.6 The HCV viral load test must have a linear range of 15 IU/ml – 100,000,000 IU/ml

1.5.10.2.7 The HCV test must include a QS (Quantitation Standard) that acts as an internal control and is co-amplified with the target for the purpose of titer calculations within each reaction.

Meets the minimum requirement described in Section 1.5.10.2 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.10.3 HPV test must have the following feature:

1.5.10.3.1 The HPV test must be FDA approved to detect simultaneously 14 HPV High Risk Genotypes, plus HPV Genotypes 16 and 18.

1.5.10.3.2 The HPV test must be FDA approved for first-line primary cervical cancer screening test to detect hrHPV including genotyping for 16 and 18.

1.5.10.3.3 The HPV test must meet HPV testing needs in ASCUS and NILM as detailed in recent ACOG guidelines

1.5.10.3.4 The HPV test must feature NO GREY ZONE OR INDETERMINATES; must use of a unique kinetic algorithm.

1.5.10.3.5 T e HPV test must contain B globin internal control for cellularity check.

1.5.10.3.6 The HPV test must use only 2 controls per run for 22 reportable results in runs of 24, or 94 reportable results in runs of 96.

1.5.10.3.7 The software must allow the individual Genotypes 16/18 results to be held by the LIS and reported out only if requested, eliminating the need to re-run a sample.

Meets the minimum requirement described in Section 1.5.10.3 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.10.4 CT/NG tests (Chlamydia trachomatis, Neisseria gonorrhoeae)

1.5.10.4.1 The CT/NG tests must be designed with dual target detection of CT/NG and the Internal Control all in one reaction.

1.5.10.4.2 The CT primers and probes must be designed to detect targets in both cryptic plasmid and MOMP genomic DNA that will enable the detection of all major serovars of CT and the Swedish CT Mutant (nvCT), strains that may harbor deletions in the cryptic plasmid, and strains that do not carry the cryptic plasmid.

1.5.10.4.3 The NG target region must have 2 highly conserved sequence variations that will enable the detection of a combination of both target variations with no-cross reactivity with commensal Neisseria or other bacterial species.

1.5.10.4.4 The CT/NG Internal Control must be a combination of two non-infectious recombinant plasmid DNAs, each with primer binding regions identical to those of either the C. trachomatis or the N. gonorrhoeae genomic target sequences. The internal control is automatically added to every reaction to demonstrate that amplification has actually taken place, providing confidence that a negative reaction is truly a negative result.

1.5.10.1 Meets the minimum requirement described in Section 1.5.10.4 above (y/n)?

1.5.11. Reference Range - A reference range shall be determined for each test following CLSI guidelines. Samples used for the reference range study shall be representative of the patient population being tested. Reference range assessment shall be performed for each lab. One of the following protocols shall be used:

1.5.11.1. A verification of the manufacturer’s suggested reference range may be performed as long as the suggested range is based on a comparable population of test subjects. The manufacturer shall provide specific information defining how the suggested range was determined. A minimum of 20 reference individuals shall be used to verify the manufacturer’s range. Any apparent outliers shall be discarded and new specimens obtained to provide a statistically valid verification.

1.5.11.2. If the suggested manufacturer’s range is not appropriate for the patient population, a reference range shall be established. Establishing a reference shall follow CLSI guidelines. This requires a minimum of 120 reference individuals to be used to establish a reference range. The reference interval shall be determined using the nonparametric method.

1.5.11.3. If a laboratory is currently using the proposed instrument/reagent system, the “in-use” reference range can be transferred to the “new” system if a method comparison study between the two systems proves to be acceptable. If comparison studies are not acceptable, one of the two above items shall be performed.

Meets the minimum requirement described in Section 1.5.11 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.12. Reportable Range Requirements -

1.5.12.1. HIV Viral Load and HCV Viral Load, assays– Contractor shall provide accurate high and low reportable range limits

1.5.12.2. HPV and CT/NG tests are Qualitative tests

Meets the minimum requirement described in Section 1.5.12 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.13. Reports - The Contractor shall provide to the Contracting Officer and other individuals (designated post-award) a copy of a quarterly report of sales, by ordering facility, within 30 calendar days after the close of each quarter’s business. Reports are to reflect, at a minimum, total net sales amounts before discount, and discount amounts by ordering facility as well as the raw data used to develop these reports. These reports shall be used to monitor the commitment of each facility, reporting the savings realized and shall be shared with each participating facility, personnel associated with acquiring the products, and respective laboratory personnel. Additional invoice charges associated with reagent and/or supply wastage or repair parts included at no charge (per FSS awarded contract) shall not be accepted. There will be no additional charges for any reports required as part of the BPA. Attachment C may be used as a template to provide these quarterly reports.

Meets the minimum requirement described in Section 1.5.13 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14. Support Features -

1.5.14.1. Commercial marketing. The equipment models being offered shall be in current production as of the date this offer is submitted. For purposes of this solicitation, “current production” shall mean that the clinical laboratory analyzer model is being offered as new equipment. Discontinued models that are only being made available as remanufactured equipment are not acceptable.

Meets the minimum requirement described in Section 1.5.14.1 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.2. Start-Up Reagents. The Contractor shall provide all reagents, calibrators, controls, consumable/disposable items, parts, accessories and any other item included on the list of supplies defined in the Federal Supply Schedule contract and required to establish instruments for operation for performance of acceptance testing. The Contractor shall perform, to the satisfaction of the Government, all validation studies including: precision, method comparison with current analyzer, accuracy (recovery), linearity (reportable range), calibration verification, verification of reference interval, and determination of sensitivity and specificity at no cost to the Government. The Contractor shall perform all of the statistical analysis as stated in the Method Performance/Validation section above and report data in an organized, clearly comprehensible format.

Meets the minimum requirement described in Section 1.5.14.2 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.3. Training. The Contractor shall provide an instrument training program that is coordinated with and timely to the equipment installation, sufficient to the size and scope of the facility’s services and minimally equivalent to the terms and conditions for training defined in the Contractor’s Federal Supply Schedule FSC Group 66, Part III, Cost-Per-Test Clinical Laboratory Analyzers contract. This shall include training on the operation of the system, data manipulation, and basic trouble shooting and repair. Thereafter, the Contractor shall provide training for minimally two operators per facility at inception and one per year at the discretion of the Government for each model of instrumentation placed. Utilization of the training slots shall be mutually agreed upon between the VA and the Contractor. A training program that involves off-site travel shall include the cost of airfare, room and board for each participant.

Meets the minimum requirement described in Section 1.5.14.3 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.4. Equipment Preventative Maintenance/Repair Service. The Contractor shall be able to provide emergency equipment repair and preventative maintenance on all primary and back-up instrumentation and any incremental support equipment, e.g. water system, offered according to the following terms:

Service Requirements A technical assistance center shall be available by telephone 24 hours per day, 7 days per week with a maximum call back response time of hour.

Equipment repair response time shall be no more than hours.

Service agreement to cover 7 days per week, business hours unless both instruments are down then agreement converts to emergent 24/7.

Preventative maintenance will be performed as frequently as published in manufacturer’s operator’s manual and within 2 weeks of the scheduled due date.

A malfunction incident report shall be furnished to the Laboratory upon completion of each repair call. The report shall include, as a minimum, the following:

date and time notified date and time of arrival serial number, type and model number of equipment time spent for repair, and proof of repair that includes documentation of a sample run of quality control verifying acceptable performance.

Each notification for an emergency repair service call shall be treated as a separate and new service call

Meets the minimum requirement described in Section 1.5.14.4 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.5. Upgrades - The Contractor shall provide upgrades to both the equipment hardware and software in order to maintain the integrity of the system and the state-of –the art technology, at no additional charge to the Government. These shall be provided as they become commercially available and at the same time as they are being provided to commercial customers. This requirement only applies to “system upgrades” that enhance the model of equipment being offered, i.e. new version of software, correction of hardware defect, upgrade offered to commercial customers at no additional charge, upgrade to replace model of equipment no longer Contractor supported, etc. This does not refer to replacing the original piece of equipment provided under the BPA; however, it does refer to significant changes in the hardware operational capability.

Meets the minimum requirement described in Section 1.5.14.5 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.6. Ancillary support equipment - The Contractor shall provide, install and maintain through the life of the BPA , as indicated, any and all ancillary support equipment to fully operate the analyzer as defined in these specifications, e.g. cabinetry to support/house the analyzer (if necessary), water systems (including consumable polishers, filters, etc.), and universal interface equipment, etc. In addition, the Contractor shall include all ancillary components that are customarily sold or provided with the model of equipment proposed, e.g. starter kits, tables/stands, etc.

Meets the minimum requirement described in Section 1.5.14.6 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

Interface Requirements The Contractor shall be responsible for providing all hardware required for the connection, implementation, and operation of the interface to the universal interface and any incremental fee that is required each time an instrument is added to an existing universal interface system (see Attachment A).

The Contractor shall provide any and all necessary software support for insuring that successful interfacing has been established. Specific requirements for the communication of the data streams will be unique to the instrument system involved and dictated by the manufacturer itself. Information necessary to make the determination for type and amount of interfacing equipment is supplied in Attachment A.

If a site already has a universal interface box, the Contractor is responsible for everything leading up to the box including any incremental fee required to add additional equipment (e.g. licenses, ports/cards, cables, software, etc.) to the universal interfacing system.

If a site does not have a universal interface and one is needed to optimally interface the instrument, then the Contractor is responsible for the acquisition of the universal interface box and everything else needed to connect with VA computerized hospital information system.

Meets the minimum requirement described in Section 1.5.14.7 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

If there are any software upgrades in the instrument during its life, the Contractor is responsible for seeing that the interface can accommodate any changes in the data stream going to the VA computerized hospital information system.

Meets the minimum requirement described in Section 1.5.14.8 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

The Contractor shall provide remote support which will require establishment of a VA national MOU/ISA between Contractor and VA prior to award. If the Contractor current has a valid MOU/ISA, the Contractor shall include a copy of the MOU/ISA as part of their quote with the file named “VA MOU/ISA”.

Meets the minimum requirement described in Section 1.5.14.9 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.7. Commercial offerings - The Contractor shall provide any additional support material that is routinely provided to equivalent commercial customers and assists in regulatory compliance, e.g. Computer disc containing their procedure manual in CLSI format or an on-line procedure manual in the instrument software.

Meets the minimum requirement described in Section 1.5.14.10 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.8. Characterization of waste – The Contractor shall provide documentation that it has characterized the hazardous nature of all wastes produced by all equipment, devices, reagents, and discharges in accordance with the requirements of the Code of Federal Regulations Title 40 “Protection of the Environment” Part 261 et seq. and applicable state and local requirements. Documentation shall include a description of the characteristics of the hazardous waste produced as a byproduct of the instrument operations, Safety Data Sheets (SDS) meeting the requirements of the Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA), the analytical process used to determine the hazardous nature and characteristics of the waste, and the analytical test results. Testing of hazardous waste is to be done in accordance with testing protocol specified for each individual waste as described in the Code of Federal Regulations Title 40 to make a determination if the waste is a hazardous waste or otherwise regulated. Documentation shall be submitted as an attachment to the Contractor’s quote and the file shall be named “Characterization of Waste – Section 1.4.21.11”.

1.5.14.8.1. The determination and description shall address the following:

1.5.14.8.1.1. Waste toxicity (Reference 40 CFR §261.11 and 40 CFR §261.24)

1.5.14.8.1.2. Waste ignitability (Reference 40 CFR §261.21)

1.5.14.8.1.3. Waste corrosivity (Reference 40 CFR §261.22)

1.5.14.8.1.4. Waste reactivity (Reference 40 CFR §261.23)

1.5.14.8.1.5. Hazardous waste from non-specific sources (F-listed) (Reference 40 CFR §261.31)

1.5.14.8.1.6. Discarded commercial products (acutely toxic or P-listed and toxic or U-listed) (Reference 40 CFR §261.33)

1.5.14.8.1.7. Solid Waste (Reference 40 CFR §261.2)

1.5.14.8.1.8. Exclusions (Reference 40 CFR §261.4)

1.5.14.8.2. The Contractor will provide written instructions and training material to ensure VHA laboratory staff are trained as needed to properly operate devices with special emphasis to managing and disposing of hazardous waste in accordance with EPA and state requirements. Additionally, the training provided by the Contractor shall fulfill Resource Conservation and Recovery Act (RCRA) requirements for training as applicable to devices.

Meets the minimum requirement described in Section 1.5.14.11 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.14.9. Contractor shall provide a description of all wastes the process or equipment may discharge so that the facility can determine whether the discharge meets Local Publicly Owned Treatment Works (POTW), State and Federal discharge requirements. At a minimum the characteristics of ignitability, corrosivity, reactivity and toxicity as defined in 40 CFR §261 shall be determined and documented. Any mercury containing reagents shall be identified in any concentrations. All test results shall be provided. All listed chemicals (F, U, K and P) found in 40 CFR §261 shall be provided in product information and their concentrations documented. For those materials with a positive hazardous waste determination, a mechanism for the laboratory to meet local discharge requirements (i.e. mercury, thimerosol and formaldehyde) shall be developed and SDS sheets shall be provided in advance for review. At a minimum, documentation shall include, but not be limited to the concentration/measures of the elements and parameters listed below and shall be included with Contractor response:

1.5.14.9.1.1.Chromium(Total)
1.5.14.9.1.2.Copper(Total)
1.5.14.9.1.3.Cyanide(Total)
1.5.14.9.1.4.Lead(Total)
1.5.14.9.1.5.Mercury(Total)
1.5.14.9.1.6.Nickel(Total)
1.5.14.9.1.7.Silver(Total)
1.5.14.9.1.8.Zinc(Total)
1.5.14.9.1.9.Arsenic(Total)
1.5.14.9.1.10.Selenium(Total)
1.5.14.9.1.11.Tin(Total)
1.5.14.9.1.12.pH
1.5.14.9.1.13.Flash point(to higher than 200F)
1.5.14.9.1.14.BOD; biochemical oxygen demand

1.5.14.9.2. The documentation the Contractor provides will be used to work with the VAMC and the public and/or private organization (e.g., POTW) to determine whether or not the waste from each device can legally be disposed of via the sewerage system. Documentation shall be submitted as an attachment to the Contractor’s quote and the file shall be named “Description of Waste – Section 1.4.21.12.2”.

Meets the minimum requirement described in Section 1.5.14.12 above (y/n)?

1.5.14.10. Implementation/transition timeframe - The implementation of the services/requirements described in this solicitation shall be completed no later than 90 days after the award of the BPA. This timeline is based on a reasonable attempt of the Contractor to complete all of the necessary implementation requirements within the stated timeframe. Contractor shall not be penalized for implementation timelines that extend beyond the 90 day timeframe, if the extension is through no fault of the Contractor and is a result of delays due to the Government.

1.5.14.10.1. Upon award of a BPA, the transition period for the awarded BPA to have all equipment and peripherals installed and operational shall be from date of award through 90 days. During this same period all initial training of VA personnel in the operation and maintenance of said award shall also be completed.

1.5.14.10.2. Contractor shall provide with its quotation an implementation plan for installation of new equipment. Contractor’s submitted plan shall not exceed 90 days for the transition of all services under the awarded BPA including installation and training of personnel, transition of all testing materials, reagents and supplies, etc., performance of all correlations and validations. Failure of the Contractor to conform to the transition period shall be considered as sufficient cause to terminate BPA for cause under the Termination for Cause clause of the BPA.

1.5.14.10.3. At the end of 90 days from award of the BPA, the awarded Contractor shall have full and sole responsibility for services under the awarded BPA.

Meets the minimum requirement described in Section 1.5.14.13 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.15. Standard and Quality of Performance - This paragraph establishes a standard of quality performance that shall be met before any equipment listed on the delivery order or BPA is accepted by the Government. This also includes replacement, substitute machines and machines that are added or field modified after a system has demonstrated successful performance. The acceptance period shall begin on the installation date. It shall end when the equipment has met the standard of performance for a period of 30 consecutive calendar days by operating in conformance with the Contractor’s technical specification or as quoted in any BPA at an effectiveness level of 90% or more.

1.5.15.1. In the event that equipment does not meet the standard of performance during the initial 30 consecutive calendar days, the standard of performance tests shall continue on a day-by-day basis until the standard of performance is met for a total of 30 consecutive days.

1.5.15.2. If the equipment fails to meet the standard of performance after 90 calendar days from the installation date, the user may, at his/her option, request a replacement or terminate the order in accordance with the provisions of FAR 52.212-4 entitled “Termination for cause.” (The Contractor shall receive revenue for tests reported during the 90-day acceptance period.)

1.5.15.3. Operational use time for performance testing for a system is defined as the accumulated time during which the machine is in actual use. System failure downtime is that period of time when any machine in the system is inoperable due to equipment failure. Downtime for each incident shall start from the time the Government makes a bona fide attempt to contact the Contractor’s designated representative at the prearranged contact point until the system or machine(s) is returned to the Government in proper operating condition.

1.5.15.4. During the performance period for a system, a minimum of 100 hours of operational use time with productive or simulated work shall be required as a basis for computation of the effectiveness level. However, in computing the effectiveness level, the actual number of operational use hours shall be used when in excess of the minimum of 100 hours.

1.5.15.5. The Government will maintain daily records to satisfy the requirements of the Standard and Quality of Performance section and shall notify the Contractor in writing of the date of the first day of the successful period of operation. Operations use time and downtime shall be measured in hours and whole minutes.

1.5.15.6. During the term of the BPA, shall the repair record of any individual piece of laboratory equipment reflect a downtime of 10% or greater of the normal working days in one calendar month, a determination shall be made by the COR to replace the malfunctioning equipment with new equipment. The responsibility for maintaining the equipment furnished in good condition in accordance with manufacturer’s instructions, shall be solely that of the Contractor. Each instrument provided by the Contractor shall maintain an uptime of 90% in each month of the term of the agreement for equipment.

Meets the minimum requirement described in Section 1.5.15 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.16. Government’s Responsibility - The user will perform routine maintenance and cleaning as required in the manufacturer’s operation and maintenance instructions. The user shall maintain appropriate records to satisfy the requirements of this paragraph.

Meets the minimum requirement described in Section 1.5.16 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.17. Ownership of Equipment - Title to the equipment shall remain with the Contractor. All accessories (unused consumables, etc.) furnished by the Contractor shall accompany the equipment when returned to the Contractor. The Contractor, upon expiration of order(s), at termination and/or replacement of equipment, shall remove the equipment. The Contractor shall disconnect the analyzer (gas, water, air, etc.) and shall be responsible for all packing and shipping required to remove the analyzer.

Meets the minimum requirement described in Section 1.5.17 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.18. The Contractor shall identify if removable media is required to perform their duties. The Clinical Engineering Department will ensure the removable media is scanned with anti-virus software running current virus definitions prior to connection to any medical device/system. Any Contractor with patient sensitive information that is imported into the removable media device for any reason shall purge all patient sensitive information prior to departure from the facility.

Meets the minimum requirement described in Section 1.5.18 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.19. Prior to termination or completion of this BPA, Contractor/subcontractor shall not destroy information received from VA, or gathered/created by the Contractor in the course of performing this BPA without prior written approval by the VA. Any data destruction done on behalf of VA by a Contractor/subcontractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the Contractor that the data destruction requirements above have been met shall be sent to the VA Contracting Officer within 30 days of termination or completion of the BPA.

Meets the minimum requirement described in Section 1.5.19 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.20. All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information shall be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the BPA or (ii) disposal or return of the IT equipment by the Contractor/subcontractor or any person acting on behalf of the Contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the Contractors/subcontractors that contain VA information shall be returned to the VA for sanitization or destruction or the Contractor/subcontractor shall self-certify that the media has been disposed of per 6500.1 requirements. This shall be completed within 30 days of termination or completion of the BPA or disposal or return of the IT equipment, whichever is earlier.

Meets the minimum requirement described in Section 1.5.20 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.21. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information shall not be returned to the Contractor at the end of lease, for trade-in, or other purposes. The options are:

1.5.21.1. Contractor shall accept the system without the drive;

1.5.21.2. VA’s initial medical device procurement includes a spare drive which shall be installed in place of the original drive at time of turn-in; or

1.5.21.3. VA shall reimburse the company for media at a reasonable open market replacement cost at time of purchase.

Meets the minimum requirement described in Section 1.5.21 above (y/n)?

Describe how the minimum requirement is met or exceeded:

File name of Contractor’s attachment, if providing additional supporting documentation:

1.5.22. Due to the highly specialized and sometimes proprietary hardware and software associated with medical equipment/systems, if it is not possible for the VA to retain the hard drive, then;

1.5.22.1. The equipment Contractor shall have an existing BAA if the device being traded in has protected health information stored on it and hard drive(s) from the system are being returned physically intact; and

1.5.22.2. Any fixed hard drive on the device shall be non-destructively sanitized to the greatest extent possible without negatively impacting system operation. Selective clearing down to patient data folder level is recommended using VA approved and validated overwriting technologies/methods/tools. Applicable media sanitization specifications need to be pre-approved and described in the purchase order or BPA.

1.5.22.3. A statement needs to be signed by the Director (System Owner) that states that the drive could not be removed and that (a) and (b) controls above are in place and completed. The Information Security Officer (ISO) needs to maintain the documentation.

Meets the minimum requirement described in Section 1.5.22 above (y/n)?

File details come from the government source that posted it.