Draft Performance Work Statement.pdf

PDF 185 KB Posted

Attached to
S205--Waste Removal for VA Southern Nevada Health Care System
Solicitation number
36C26127Q0185
Issued by

About this file

This is a Draft Performance Work Statement (PWS) for commercial solid waste, recycled materials, and regulated medical waste disposal services at VA Southern Nevada Healthcare System (VASNHS) facilities.

The contractor shall provide collection, containment, and disposal services for commercial solid waste, recyclables, and regulated medical waste across eight VASNHS locations in the Las Vegas and Laughlin, Nevada areas, including the main hospital campus and seven primary care clinics. Services are scheduled for Monday through Friday, 7:30 a.m. to 4:00 p.m. Pacific Time, excluding eleven federal holidays, with makeup collections within 24 hours for missed service or severe weather. The contractor must establish COR-approved collection schedules at consistent times and rent appropriate containers approved by the COR, replacing any removed containers with comparable units. Unscheduled collections for special events must occur within 24 hours and be invoiced separately via purchase order. The contractor shall invoice only for materials actually removed and container rental periods, with pricing based on a standard unit cost schedule that includes all labor, equipment, materials, and disposal fees. The contract period runs from April 1, 2027 through March 31, 2032, consisting of one base year and four option years.

The PWS establishes extensive requirements for contractor responsibility, including full compliance with federal, state, and local regulations; maintenance of current licenses and permits; provision of end-of-month waste reports detailing account numbers, containers, pickup dates, and weights within ten business days; and adherence to strict information security, records management, HIPAA privacy, and personnel requirements. The contractor must maintain specified insurance coverage (workers compensation with $1,000,000 employer's liability, general liability of $500,000 per occurrence, and automobile liability of $200,000 per person/$500,000 per occurrence), establish an accessible contract manager available within two hours during business hours, ensure personnel wear company identification and distinctive clothing, and prohibit weapons and smoking at VASNHS facilities. Liquidated damages of $37.50 per affected individual apply to data breaches involving sensitive personal information, and security controls compliance testing may be conducted with 10 working days' notice or unannounced during security incidents.

View the file

Other files

File Type Posted
36C26127Q0185.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA SOUTHERN NEVADA HEALTHCARE SYSTEM

DRAFT PERFORMANCE WORK STATEMENT (PWS) FOR

COMMERCIAL SOLID WASTE, RECYCLE, AND

REGULATED MEDICAL WASTE DISPOSAL

1. DESCRIPTION OF SERVICES

The Contractor shall provide all necessary labor, personnel, supplies, travel, supervision, equipment, tools, and materials to perform commercial solid waste disposal and regulated medical waste container disposal and recycle service in accordance with the terms and conditions of the contract. The Contractor shall perform to the standards in the contract, as well as all local, state, and federal regulations. This service will be performed at VA Southern Nevada Health Care System (VASNHS) facilities listed below.

• Main Hospital Campus 6900 North Pecos Road, North Las Vegas, NV 89086

• Northeast Primary Care Clinic 4461 E. Charleston, Las Vegas, 89104

• Northwest Primary Care Clinic 3968 N. Rancho, North Las Vegas 89130

• Southeast Primary Care Clinic 1020 S. Boulder Highway Henderson, NV 89015

• Southwest Primary Care Clinic 7235 South Buffalo Drive, Las Vegas, NV 89113

• Veterans Recovery Center 3525 W. Cheyenne Ste. 106 North Las Vegas, NV 89032

• 5406 El Campo Grande, Suite 150, Las Vegas, NV 89115

• Laughlin Clinic 3650 South Point Circle, Building D, 2nd Floor, Suite 200, Laughlin, NV

89029

a. Period of performance:

Base Year: 04/01/2027 – 03/31/2028

Option Year 1: 04/01/2028 – 03/31/2029

Option Year 2: 04/01/2029 – 03/31/2030

Option Year 3: 04/01/2030 – 03/31/2031

Option Year 4: 04/01/2031 – 03/31/2032

The Contractor shall invoice for each container rental period, removal, and only for the materials removed. The Government reserves the right to increase or decrease the quantity, frequency and service days, as needed. The Contractor shall not exceed services in an amount that is greater than the amount of the funded contract.

b. Collection Requirements.

The Contractor shall provide services for the collection for commercial solid waste, recycle materials, and regulated medical waste disposal. The Contractor will have sufficient personnel, vehicles, equipment, expendable and durable goods to perform the duties required without additional support from VASNHS. The driver shall pick up the waste on a schedule approved by both the Contractor and the VASNHS Contracting Officer’s Representative (COR) and shall be at VASNHS at approximately same time of day for each pick-up of waste.

c. Routes/Schedules Submittals.

The Contractor shall establish a collection time, which will be submitted to the COR for approval. The Contractor shall pick up the waste on this approved schedule Monday through Friday. No changes are allowed to this schedule without the COR’s or Contracting Officer (CO) approval. The Contractor will communicate with the COR to ensure the number of containers and the timing of emptying them is adequate for the waste removal needs of VASNHS. This shall be monitored closely to resolve any issues that may arise.

d. Unscheduled Collections.

The COR may require the Contractor to make unscheduled collections or disposals, for special events or other occasions. The Contractor shall remove the waste within twenty-four (24) hours of any special event or other occasion. Any unscheduled services shall be ordered and invoiced via a separate purchase order. The price for waste collections shall be in accordance with the Price Cost Schedule of Supplies and Services included in the contract.

e. Inclement Weather Schedule.

The Contractor shall collect waste during periods of inclement weather. In cases of severe weather, the COR may authorize exceptions. When exceptions are granted, Contractor shall make up all missed collections within twenty-four (24) hours at no additional cost to the Government after the severe weather has terminated, unless the COR authorizes additional time.

f. Containers.

The Contractor shall rent commercial solid waste and regulated medical waste containers to VASNHS. These containers shall be approved by the COR. The containers will either be placed outside in an area specified by the COR or VASNHS will provide a way for the Contractor to enter the facility(s) to retrieve the containers. Any containers removed by the Contractor shall be replaced with a comparable container.

2. CONTRACTOR'S RESPONSIBILITIES

While accomplishing any work under this contract the Contractor is totally responsible for full compliance with all applicable federal, state and local government policies, regulations, procedures, specifications, and laws that apply to work of this nature. In addition, the Contractor shall obtain and keep current all licenses and permits that are required by local, state and federal agencies to accomplish the work.

3. CONTRACTOR'S WORK HOURS

Unless otherwise agreed upon, all work performed shall be between the hours of 7:30 a.m. and 4:00 p.m. Pacific Time (PT), Monday through Friday, excluding the federal holidays listed below.

The Contractor will perform unscheduled work on mutually agreed upon dates between the COR and Contractor to occur no more than five (5) business days from an initial request.

Modifications to these work hours may be granted by the COR only, and they must be requested by the Contractor not less than five (5) business days prior to their implementation. Regardless of the work hours agreed upon, all work will be performed under the cognizance of the COR or their representative, who will remain on station until all work for that day has been completed.

Listed below are the eleven (11) national holidays:

New Year’s Day January 1st Martin Luther King ‘s Birthday Third Monday in January

President’s Day Third Monday in February Memorial Day Last Monday in May

Independence Day July 4th Juneteenth Day June 19th

Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th

Thanksgiving Day Fourth Thursday in November Christmas Day December 25th

Any other day specifically declared by the President of the United States to be a national holiday.

When a federal holiday is observed on a scheduled service date, the contractor will provide service on the following business day. When one of the above designated holidays falls on a Sunday, the following Monday will be observed as a holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a holiday.

4. SCHEDULE OF UNIT COSTS

The contractor shall establish a schedule of standard unit costs, which will be the basis for invoicing. These will include all labor, equipment, materials and disposal fees for the waste disposal listed below, inclusive of all associated administrative activities. With the establishment of this contract, the Government may request additional services outside the scope of this contract. These additional services will not be billable to the contract but will be paid via Government Purchase Card (GPC), which shall not exceed $2,499.00 for each additional service.

To support any additional services required, contractor shall provide price per service that will be inclusive of cost to include all labor, personnel, equipment, supplies, vehicles.

5. END OF MONTH WASTE REPORT

At the end of each month of service, contractor shall provide an excel report that provides the account number, container, pick up date, and weight. This report is due within ten (10) business days after the end of the last day of the month.

6. VA INFORMATION AND INFORMATION SECURITY:

Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the information system and privacy laws, regulations, policies, directives, and regulations, including, but not limited to, those contained in VA Handbook 6500.6.

7. RECORDS MANAGEMENT

Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. Chapters. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a).

These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

In accordance with 36 CFR 1222.32, the contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law.

Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

The VA Southern Nevada Healthcare System (VASNHS) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VASNHS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report to VASNHS. The agency must report promptly to NARA in accordance with 36 CFR 1230.

The contractor shall immediately notify the appropriate Contracting Officer (CO) upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract documents. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VASNHS control, or the contractor must hold it until otherwise directed.

Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the CO or address prescribed in the contract documents. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

The contractor is required to obtain the CO's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract

In accordance with 36 CFR 1222.32, the contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law.

Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

The VA Southern Nevada Healthcare System (VASNHS) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VASNHS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report to VASNHS. The agency must report promptly to NARA in accordance with 36 CFR 1230.

The contractor shall immediately notify the appropriate Contracting Officer (CO) upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract documents. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VASNHS control, or the contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the CO or address prescribed in the contract documents. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

The contractor is required to obtain the CO's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The contractor (and any sub-contractor) is required to abide by Government and VASNHS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

The contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VASNHS policy.

The contractor shall not create or maintain any records containing any non-public VASNHS information that are not specifically tied to or authorized by the contract.

The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the FOIA.

VASNHS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VASNHS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

Training. All contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

Flow down of requirements to Subcontractors:

The contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract document, and require written subcontractor acknowledgment of same.

Violation by a subcontractor of any provision set forth in this clause will be attributed to the contractor.

8. SECURITY REQUIREMENTS FOR UNCLASSIFED INFORMATION

TECHNOLOGY SECURITY RESOURCES

a. The contractor and their personnel shall be subject to the same Federal laws, regulations, standards and VA polices as VA personnel, regarding information and information system security. These include but are not limited to Federal Information Security Management Act (FISMA), Appendix III of OMB Circular A-130, and guidance and standards, available from the Department of Commerce’s National Institute of Standards and Technology (NIST). This also includes the use of common security configuration available from NIST’s Web site at:

http://checklists.nist.gov

b. To ensure that appropriate security controls are in place, contractors must follow the procedures set forth in “VA Information and Information System Security/Privacy Requirements for IT Contractors” located at the following site: http://www.iprm.oit.va.gov.

c. These provisions shall apply to all contracts in which VA sensitive information is stored, generated, transmitted, or exchanged by VA, a contractor, subcontractor or a third-party, or on behalf of any of these entities regardless of format or whether it resides on a VA system or contractor/subcontractor’s electronic information system(s) operating for or on the VA behalf.

9. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.

b. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.

c. The contractor or subcontractor must notify the COR immediately when an employee working on a VA system or with access to VA information is reassigned or leaves the contractor or subcontractor’s employ. The COR must also be notified immediately by the contractor or subcontractor prior to an unfriendly termination.

10. VA INFORMATION CUSTODIAL LANGUAGE

a. Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).

b. VA information should not be co-mingled, if possible, with any other data on the contractors/subcontractor’s information systems or media storage systems in order to ensure VA requirements related to data protection and media sanitization can be met. If co-mingling must be allowed to meet the requirements of the business need, the contractor must ensure that VA’s information is returned to the VA or destroyed in accordance with VA’s sanitization requirements.

VA reserves the right to conduct on site inspections of contractor and subcontractor IT resources to ensure data security controls, separation of data and job duties, and destruction/media sanitization procedures are in compliance with VA directive requirements.

c. Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the COR within 30 days of termination of the contract.

d. The contractor/subcontractor must receive, gather, store, back up, maintain, use, disclose and dispose of VA information only in compliance with the terms of the contract and applicable Federal and VA information confidentiality and security laws, regulations and policies. If Federal or VA information confidentiality and security laws, regulations and policies become applicable to the VA information or information systems after execution of the contract, or if NIST issues or updates applicable FIPS or Special Publications (SP) after execution of this contract, the parties agree to negotiate in good faith to implement the information confidentiality and security laws, regulations and policies in this contract.

e. The contractor/subcontractor shall not make copies of VA information except as authorized and necessary to perform the terms of the agreement or to preserve electronic information stored on contractor/subcontractor electronic storage media for restoration in case any electronic equipment or data used by the contractor/ subcontractor needs to be restored to an operating state. If copies are made for restoration purposes, after the restoration is complete, the copies must be appropriately destroyed.

f. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.

g. In accordance with 45 CFR 164.502(e), the Privacy Rule includes exceptions to the Business Associate Standard. This requirement meets the exception and does not require a Business Associate agreement in order for Covered Entity to disclose Protected Healthcare Information to the contractor for treatment.

h. The contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.

i. The contractor/subcontractor’s firewall and Web services security controls, if applicable, shall meet or exceed VA’s minimum requirements. VA Configuration Guidelines are available upon request.

j. The records created in accordance with this contract belong to the VASNHS and should be returned to the VASNHS and/or destroyed in accordance with VHA RCS 10-1. Destruction should only occur with advance notice and guidance from the Records Management Officer at the VASNHS. Records shall be safeguarded in accordance with the Privacy Act, Health Insurance Portability and Accountability Act (HIPAA) and the VASNHS Release of Information Unit. Patient Medical information is considered privileged and shall not be disclosed or revealed in any way without prior written permission from the VA Chief, Health Information Management Section.

k. The Contractor shall only release medical information obtained during the course of this contract to those VA staff members involved in the necessary management and treatment of that individual patient. Patient list and name of patients are considered privileged information and shall not be disclosed or revealed in any way for use outside the Contractor without prior written permission from the referring VA Chief of Staff. Veterans requesting copies of medical information generated by the contractor will be referred to the VASNHS Release of Information Unit.

l. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor/subcontractor may use and disclose VA information only in two other situations: (i) in response to a qualifying order of a court of competent jurisdiction, or (ii) with VA’s prior written approval. The contractor/ subcontractor must refer all requests for, demands for production of, or inquiries about, VA information and information systems to the VASNHS Release of Information Unit for response.

m. Notwithstanding the provision above, the contractor/subcontractor shall not release VA records protected by Title 38 U.S.C. 5705, confidentiality of medical quality assurance records and/or Title 38 U.S.C. 7332, confidentiality of certain health records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse, or infection with human immunodeficiency virus. If the contractor/subcontractor is in receipt of a court order or other requests for the abovementioned information, that contractor/ subcontractor shall immediately refer such court orders or other requests to the VASNHS Release of Information Unit for response.

n. All electronic storage media used on non-VA leased or non-VA owned IT equipment that is used to store, process, or access VA information must be handled in adherence with VA Handbook 6500.1, Electronic Media Sanitization upon: (i) completion or termination of the contract or (ii) disposal or return of the IT equipment by the contractor/subcontractor or any person acting on behalf of the contractor/subcontractor, whichever is earlier. Media (hard drives, optical disks, CDs, back-up tapes, etc.) used by the contractors/subcontractors that contain VA information must be returned to the VA for sanitization or destruction or the contractor/subcontractor must self-certify that the media has been disposed of per 6500.1requirements. This must be completed within 30 days of termination of the contract.

The C&A requirements do not apply, and that a Security Accreditation Package is not required.

Ensure that a Contractor Security Control Assessment (CSCA) is completed within 30 days of contract approval and yearly on the renewal date of the contract.

Ensure that the CSCA is sent to the ISO and the OCS Certification Program Office for review to ensure that appropriate security controls are being implemented in service contracts.

Ensure a copy of the CSCA is maintained in the Security Management and Reporting Tool (SMART) database. COR will provide a copy of the completed CSCA to ISO for uploading into SMART database.

11. HEALTH INSURANCE PORTABILITY AND ACCOUNTABILITY ACT (HIPAA):

Contractor shall take reasonable measures to ensure patient privacy and confidentiality. The contractor agrees to take all reasonable precautions to safeguard patient information from unauthorized access or modification, in both electronic and hard-copy formats. This includes not only electronic security measures such as “strong” user passwords on computer systems, but also physical barriers to prevent unauthorized use of computer work-stations; that hard copy patient files are in secured lockable areas, that files are in lockable cabinets, that the cabinets can in fact be locked, i.e., keys are available, and the locking mechanisms work properly. This precaution also includes the proper transfer of patient information via electronic means, such as faxing or system to system transmission.

That only the minimum necessary patient information is used to provide appropriate service to the correct patient.

That the undersigned understands that all parties are bound by the requirements of the “Health Insurance Portability and Accountability Act of 1996” which provide guidance on the protection of patient privacy and confidentiality. This Act mandates that all government agencies, and those bodies with whom they contract, must be in compliance with the directives of the Act.

12. SECURITY INCIDENT INVESTIGATION

a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.

b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/ subcontractor considers relevant.

c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.

d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.

13. LIQUIDATED DAMAGES FOR DATA BREACH

a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.

b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.

c. Each risk analysis shall address all relevant information concerning the data breach, including the following:

(1) Nature of the event (loss, theft, unauthorized access);

(2) Description of the event, including:

(a) date of occurrence;

(b) data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;

(3) Number of individuals affected or potentially affected;

(4) Names of individuals or groups affected or potentially affected;

(5) Ease of logical data access to the lost, stolen or improperly accessed data considering the degree of protection for the data, e.g., unencrypted, plain text;

(6) Amount of time the data has been out of VA control;

(7) The likelihood that sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);

(8) Known misuses of data containing sensitive personal information, if any;

(9) Assessment of the potential harm to the affected individuals;

(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and

(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.

d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $37.50 per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:

(1) Notification;

(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;

(3) Data breach analysis;

(4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;

(5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible;

and

(6) Necessary legal expenses may incur to repair falsified or damaged credit records, histories, or financial affairs.

14. SECURITY CONTROLS COMPLIANCE TESTING

On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-day’s notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.

15. TRAINING

Contractor/subcontractor employees requiring access to VA information shall complete privacy training annually as required for covered entities under the HIPAA.

The COR shall ensure employees complete training within 1 week of the initiation of the contract and annually thereafter, as required.

Failure to complete the mandatory annual training annually, within the timeframe required, is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the training and documents are complete.

16. SPILL RESPONSE

The Contractor is responsible to report and promptly cleanup all spills in a manner consistent with current environmental regulations, in the event that it is necessary to utilize government material, equipment or personnel to clean up spill caused by the Contractor, the Contractor shall be required to reimburse the government for all associated costs.

17. TRAFFIC LAWS

The Contractor and its employees shall comply with federal, State of Nevada, local and VASNHS traffic regulations.

18. WEAPONS, FIREARMS AND AMMUNITION

The contractor employee(s) are prohibited from possessing weapons, firearms or ammunition on themselves or within their Contractor owned or privately owned vehicle(s) while at any VASNHS location.

19. CONTRACT MANAGER

The Contractor shall establish and maintain an office where the Contractor’s contract manager and/or alternate is/are available and can be contacted by the COR or alternate COR(s) or designated VA representative(s) or CO during normal duty hours from 7:30 a.m. through 4:00 p.m. Pacific Time (PT), Monday through Friday, excluding federal holidays. The Contractor’s contract manager or alternate shall be available within two (2) hours during normal duty hours to meet onsite with the COR or alternate COR or CO to discuss any problem areas.

The COR shall be provided the telephone number(s) where surveillance results and complaints can be reported to the Contractor. The Contractor shall also provide the names, telephone numbers, and pager numbers of the Contractor’s point of contact(s) (POCs) to the COR for communication after business hours that may include nights, weekends, and holidays. This information will be kept updated by the Contractor whenever personnel changes occur. The Contractor’s contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.

20. PERSONNEL

The Contractor shall be responsible for its administration and management of all aspects of this contract. This includes responsibility for all Contractor employees, subcontracts, agents, and anyone acting for or on behalf of the Contractor.

The government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and/or its population.

Contractor personnel shall present a neat appearance and be easily recognizable as the contractor’s personnel while at any VASNHS facility. The Contractor’s personnel shall wear distinctive clothing, overcoats, rain gear or hats bearing the company name and/or logo. The coloring and/or design of the items selected should be designed so that personnel can be identified easily and quickly for reasons of safety and personal protection.

Contractor's personnel are required to read, write, speak, and understand the English language, unless otherwise specified in this contract or agreed to by the Government.

All Contractor personnel are required to wear identification (I.D.) badges during the entire time they are on the VA grounds. I.D. badges shall have an identification picture and shall state the name of the individual and the company they represent.

The parties agree that the Contractor's personnel working as a result of this contract shall not be considered VA employees for any purpose and shall be considered employees of the Contractor.

The Contractor shall be responsible for providing:

i. Workers Compensation.

ii. Professional liability insurance.

iii. Health examinations.

iv. Income tax withholding, and,

v. Social Security payments.

21. PARKING POLICY

It is the responsibility of Contractor personnel to park only in designated parking areas. Parking information is available from the VA Police. The VA will not validate or make reimbursement for parking violations of the Contractor' s personnel under any circumstances.

22. SMOKING POLICY

Smoking is prohibited on VASNHS grounds and inside buildings.

23. LIABILITY

(a) Workers Compensation and Employer's Liability: The Contractor is required to comply with applicable Federal and State worker's compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $1,000,000 shall be required.

(b) General Liability: (1) The Contractor is required to maintain bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

The Contractor shall be responsible for all damage to property, which may be caused by him, or any employee engaged in the performance of this contract.

(c) Automobile Liability: The Contractor is required to maintain automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the U.S. shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and

$20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

(d) Before commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his insurance company indicating that the coverage outlined in paragraphs (a) and (b) and (c) has been obtained and that it may not be changed or canceled without a guaranteed thirty(30) days-notice to the Contracting Officer.

File details come from the government source that posted it. Updated .