Attachment - Quote Pricing Breakdown RFQ No. 36C26127Q0072.docx
DOCX document 36 KB Posted
- Attached to
- Z1DZ--Replace Dental Vacuum Piping
- Solicitation number
- 36C26127Q0072
About this file
This is a Quote Price Breakdown template for RFQ No. 36C26127Q0072 for replacing dental vacuum piping at the VA Las Vegas Medical Center in North Las Vegas, Nevada. The template is structured to capture labor and material costs organized by eight construction divisions: General Requirements (Division 01), Existing Conditions (Division 02), Thermal and Moisture Protection (Division 07), Openings (Division 08), Finishes (Division 09), Special Construction (Division 13), Plumbing (Division 22), and Electrical (Division 26). Each division section requires quoters to itemize personnel by role, hourly rates, hours worked, total labor costs, material quantities, unit costs, and total material costs.
The pricing template culminates in a summary section that calculates subtotals for each division, followed by aggregate calculations for overall subtotal, overhead, profit, bonds and insurance, and a final total offer amount. This is a price-only procurement set-aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors certified and registered in both SAM.GOV and the SBA's VETCERT system at time of submission. Quotes are due by 12:00 PM PDT on November 17, 2026, submitted via email to the Contract Specialist and Contracting Officer. The project scope is valued between $1,000,000 and $5,000,000 with an estimated duration of 180 calendar days from Notice to Proceed. The applicable NAICS code is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN
RFQ No. 36C26127Q0072 QUOTE PRICE BREAKDOWN
QUOTE PRICE BREAKDOWN
Replace Dental Vacuum Piping, Las Vegas, NV
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
01. General Requirements (Division 01)
A. Project Manager
| $ |
| $ |
B. Superintendent
| $ |
| $ |
C. General Requirements
| $ |
| $ |
D. Mobilization
| $ |
| $ |
E. Premium After Hours Work
| $ |
| $ |
F. Infection Control (ICRA)
| $ |
| $ |
G. Storage Container/Office (rent)
| $ |
| $ |
H. Dumpster (rent)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
01. General Requirements Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
02. Existing Conditions (Division 02)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
02. Existing Conditions Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
03. Thermal and Moisture Protection (Division 07)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
03. Thermal and Moisture Protection Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
04. Openings (Division 08)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
04. Openings Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
05. Finishes (Division 09)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
05. Finishes Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
06. Special Construction (Division 13)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
06. Special Construction Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
07. Plumbing (Division 22)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
07. Plumbing Subtotal
| $ |
| $ |
| DESCRIPTION |
| # OF PERSONNEL |
| HOURLY RATE |
| # OF HOURS |
| TOTAL LABOR COST |
| QUANTITY |
| MATERIAL COST |
| TOTAL MATERIAL COST |
08. Electrical (Division 26)
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
08. Electrical Subtotal
| $ |
| $ |
SUB TOTAL (Items 1 – 08)
Overhead
| $ |
| $ |
Profit
| $ |
| $ |
Bonds and Insurance
| $ |
| $ |
Total
| $ |
| $ |
TOTAL OFFER
Note: All other costs may be included as a separate item and shall be specified in this breakdown.