36C26126Q1112 LineItems.xlsx
XLSX spreadsheet 467 KB Posted
- Attached to
- H999--Sources Sought Notice - Underground Fuel Storage Tank Cleaning, Inspection, Testing and Re-Fueling
- Solicitation number
- 36C26126Q1112
About this file
This is a line items spreadsheet for a Request for Information (RFI) related to underground fuel storage tank cleaning, inspection, testing, and refueling services at the VA Southern Nevada Health Care System in Las Vegas, Nevada. The RFI, solicitation number 36C26126Q1112, is being issued by the Department of Veterans Affairs Network Contracting Office 21 under NAICS code 213112 (Support Activities for Oil and Gas Operations) with a small business size standard of $47.0 million.
The spreadsheet details 21 separate line items, each priced on a quantity-priced percent basis with unit of measure in jobs (JB) or packages (PG). The scope of work encompasses comprehensive services for nine underground diesel fuel storage tanks, including mobilization, confined space setup and OSHA safety compliance, removal of monitoring equipment, cleaning and debris removal, fuel drainage and redistribution, triple rinsing, sludge removal and disposal, tank ventilation, system reinstallation, supply of flange and manway gaskets, fuel polishing of approximately 140,000 gallons, supply of 20,900 gallons of ultra-low sulfur red dye diesel, fuel sampling and laboratory analysis, tank repriming and operational verification, and project supervision with safety management and documentation. All interested contractors were required to submit capability statements via email to Gary.Christensen@va.gov before 2:00 P.M. PDT on August 14, 2026, addressing socioeconomic status, SBA registration if applicable, company legal name and UEI number, and primary point of contact information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q1112.docx | DOCX document | |
| Fuel Tank Cleaning Refuel SOW Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Action Line Item Information
| Action Type Name | Primary ID | Secondary ID | Mod Number | Title | Order Discount Type Name | Order Discount Type | Order Discount |
| RFI | 36C26126Q1112 | Underground Fuel Storage Tank Cleaning, Inspection, Testing and Re-Fueling | Percent | 0 |
KB Version: FY26.09A
Items
| ITEM NUMBER | SLIN | DESCRIPTION | REF CLIN | COMMENT | INCLUDE COMMENTS IN DOCUMENT | CONTRACT PERIOD | POP BEGIN | POP END | QUANTITY | UNIT OF MEASURE | PACKAGING MULTIPLE | RECEIPT TYPE | LINE ITEM IS | UNIT PRICE | ITEM DISCOUNT TYPE NAME | ITEM DISCOUNT | DATE UPDATED | ADDRESS1 | ADDRESS2 | ADDRESS3 | CITY | STATE | ZIP | ZIP4 | COUNTRY | MARK FRO | CONTACT NAME | CONTACT PHONE | CONTACT EMAIL | DELIVERY DATE | FOB | SPECIAL INSTRUCTIONS | INCLUDE INSTRUCTIONS/COMMENTS IN DOCUMENT | INCLUDE DATA VALUES IN DOCUMENT | PRINCIPAL NAICS CODE | PRODUCT/SERVICE CODE | UNSPSC | SIC CODE | MANUFACTURER PART NUMBER (MPN) | NATIONAL STOCK NUMBER | LOCAL STOCK NUMBER | DM DOC ID | DELIVERY REF. COUNTER | UNIT TEXT/DESCRIPTION | DELIVERY REFERENCE | ITEM MASTER FILE NUMBER | EXPENDABLE/NON-EXPENDABLE | QUANTITY REQUESTED | UNIT OF PURCHASE CODE |
| 0001 | Mobilization to VA Medical Center | Mobilization to VA Medical Center | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0002 | Confined Space Setup and OSHA Safety Team Mobilization | Confined Space Setup and OSHA Safety Team Mobilization | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0003 | Remove probes, sensors, and monitoring equipment | Remove probes, sensors, and monitoring equipment | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0004 | Clean diesel supply sump and remove debris | Clean diesel supply sump and remove debris | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0005 | Remove bulkhead bolts and space manway lid | Remove bulkhead bolts and space manway lid | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0006 | Drain SUPPLY LINE | Drain SUPPLY LINE | No | 1 | PG | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | PG | |||||||||||||||||||||||||||||||
| 0007 | Pump remaining fuel from sump | Pump remaining fuel from sump | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0008 | High-lift forklift operations | High-lift forklift operations | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0009 | Pump and redistribute fuel between tanks | Pump and redistribute fuel between tanks | No | 1 | PG | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | PG | |||||||||||||||||||||||||||||||
| 0010 | Triple rinse underground storage tank | Triple rinse underground storage tank | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0011 | Remove and dispose of contaminated rinse water | Remove and dispose of contaminated rinse water | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0012 | ventilate tank | ventilate tank | No | 1 | PG | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | PG | |||||||||||||||||||||||||||||||
| 0013 | Enter tank and remove sludge | Enter tank and remove sludge | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0014 | Dispose of sludge and contaminated waste | Dispose of sludge and contaminated waste | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0015 | Reinstall stinger, bulkhead, flange, piping, and reconnect system | Reinstall stinger, bulkhead, flange, piping, and reconnect system | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0016 | Supply flange and manway gaskets | Supply flange and manway gaskets | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0017 | Fuel polishing of approximately 140,000 gallons | Fuel polishing of approximately 140,000 gallons | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0018 | Supply 20,900 gallons Ultra Low Sulfur Red Dye Diesel | Supply 20,900 gallons Ultra Low Sulfur Red Dye Diesel | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0019 | Fuel sampling and laboratory analysis | Fuel sampling and laboratory analysis | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0020 | Re-prime tanks and verify operational readiness | Re-prime tanks and verify operational readiness | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB | |||||||||||||||||||||||||||||||
| 0021 | Project supervision, safety management, documentation, and closeout | Project supervision, safety management, documentation, and closeout | No | 1 | JB | 0 | Quantity | Priced | Percent | 0 | NONE | No | No | 0 | 0 | E | 1 | JB |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .