This document is a Quality Assurance Surveillance Plan (QASP) for a VA contract that establishes strict performance requirements for service providers. The QASP outlines three critical performance objectives with zero-tolerance thresholds: (1) Certification Testing Interval must adhere to PWS Section 2 requirements and VA directives with 100% compliance, (2) All reports must be 100% accurate, complete, and submitted on time, and (3) All personnel must meet CETA certification requirements 100% of the time. For each objective, the document mandates 100% inspection to ensure requirement achievement, with explicit warning that failure to meet these standards will result in termination for default. The surveillance methods focus on comprehensive inspection to verify full compliance across all specified performance areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHEMENT 1

Quality Assurance Surveillance Plan (QASP)

The following Performance Requirement Services Summary identifies the performance objective and performance thresholds for critical tasks associated with providing support services for this requirement. The performance threshold describes the minimum acceptable levels of service required for each requirement. The Performance

Requirements Summary shall not take the place of the PWS. These thresholds are critical to mission success. Failure to meet the standard will result in termination for default.

Performance Objective

Standard Performance Threshold Maximum Allowable Degree of deviation requirement

Method of Surveillance

1. Inspection Service frequency/ interval

Certification Testing Interval Per PWS, Section 2

No deviations. All requirements mandated by VA Directive or regulation must be 100% compliant

100% inspection to ensure that PWS requirement is achieved

2. Reports All reports are accurate, complete, and submitted on time per the PWS

100 % of the time. No discrepancies are allowed.

100% inspection to ensure that PWS requirement is achieved

3. Use of qualified personnel

All personnel shall meet the CETA certification requirement in the

PWS

100% of the time.

No discrepancies are allowed

100% inspection to ensure that PWS requirement is achieved