1. SOW Attachment Drawings Fall Protect Fresno.pdf
PDF 16 MB Posted
- Solicitation number
- 36C26125R0030
About this file
This is a set of drawings titled "SOW Attachment Drawings Fall Protect Fresno.pdf" related to a Sources Sought Notice for installing fall protection systems at the Fresno VA Medical Center (VA Central California Health Care System). This appears to be a drawing file showing specifications for fall protection installation, though the actual drawings are not provided in the text.
The project falls under NAICS code 236220 (Commercial and Institutional Building Construction) with an estimated value between $1-5 million. The work requires providing all materials, labor, tools, equipment, transportation, supervision, project management, and specialized expertise for fall protection installation. Responses are due by February 6, 2025 at 4:30 PM PT to Rosario Chaidez. While this is currently a Sources Sought Notice to assess market capabilities, particularly among SDVOSB/VOSB contractors, the actual solicitation will be issued at a later date. The small business size standard is $45 million under the designated NAICS code.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0030_Sources Sought.docx | DOCX document | |
| 2. SOW Attachment Specfications Fall Protection- Frenso.pdf | ||
| Statement of Work - Install Fall Protection Fresno.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUS
B U S
BUS
MAIN
ENTRANCE
SIGN
V A
M O N U M E N T
S
IG
N
M O N U M E N T
S
IG
N
S P E E D
B U M P
S P E E D
B U M P
STAGING AREA
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
H Y
D R
O N
IC
S
U T
IL
IT
Y P
A D
U T
IL
IT
Y
V A
U L T
FUEL TANK #2FUEL TANK #1
TANK
O2
TANK
O2
TANK
DIESEL
TANK
DIESEL
CLINTON AVENUE
HARVARD AVENUE
N O
R T
H A
N G
U S
S T
R E
E T
MOTORCYCLES
YIELD
YIELD
P A R K
IN
G
L O T
HP
A R K
IN
G
L O T
H
PARKING LOT
APARKING LOT
B
P A R K
IN
G
L O T
C
PARKING LOT
E
P A R K
IN
G
L O T
F
PARKING LOT
G
PARKING LOT
D
DN
AREA OF WORK @ ROOF
BLDG 01
BLDG 01
BLDG
OPC
BLDG 34
(NO WORK)
BLDG 32
BLDG 24
BLDG 03
BLDG 02
BLDG 22
B36
(NO
WORK)
BLDG 31
BLDG 28
BLDG 25
(NO WORK)
BLDG 27
(NO WORK)
AREA OF WORK @ ROOF
AREA OF WORK @ ROOF
N
BLDG
22A
(NO WORK)
BLDG 01
(NO WORK)
BLDG
OPC
BLDG 08 (NO WORK)
BLDG 07 (NO WORK)
BLDG 04 (NO WORK)
POTENTIAL
STAGING
AREA
PHARMACY
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
GI000
COVER SHEET 570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
1" = 40'-0"
Reference Site Plan
PROJECT
SITE
INSTALLATION OF GUARDRAILS AT ROOFS OF BUILDINGS 01, 02, 03, 22, 24,
28, 31, 32 AND OPC.
PROJECT DESCRIPTION
VICINITY MAP
PROJECT TEAM
FACILITY:
Department of Veterans Affairs VA Central California Healthcare System Engineering Services 2615 E Clinton Ave Building 03 Fresno, CA 93703
Contact: Blong Vang, COR P: 559.225.6100 ext. 7005 E: blong.vang@va.gov
Contact: Kest Cousins, Alt. COR P: 559.225.6100 ext.5218 E: kest.cousins@va.gov
ARCHITECT
MA|Architects, Inc.
385 Van Ness Ave., Suite 110 Torrance, CA 90501
Contact: Steven A. McCaslin P: 424.302.5271 E: s.mccaslin@ma-architects.net
STRUCTURAL ENGINEER
Gregory P. Luth & Associates, Inc.
3350 Scott Blvd., Bldg. 48 Santa Clara, CA 95054
Contact: Jordan Henke P: 425.393.2276 E: jordanhe@gplainc.com
DEPARTMENT OF VETERANS AFFAIRS
VA Central California Healthcare System
2615 E Clinton Ave, Fresno, CA 93703
VA Project No. 570-21-109 Install Fall Protection PROJECT DATA
PROJECT ADDRESS: 2615 E Clinton Ave Fresno, CA 93703
OCCUPANCY
& STORIES: Building 01 - 7 Stories (Fully Sprinklered)
- Occupancy: Healthcare
Building 02 - 2 Story (Fully Sprinklered)
- Occupancy: Factory Group F1
Building 03 - 1 Story (Fully Sprinklered)
- Occupancy: Business
Building 22 - 1 Story (Fully Sprinklered)
- Occupancy: Factory Group F1
Building 24 - Construction Type: II-B
- 3 Stories (Fully Sprinklered)
- Occupancy: Business
Building 28 - 1 Story (Fully Sprinklered)
- Occupancy: Healthcare
Building 31 - Construction Type: II-B
- 1 Story (Fully Sprinklered)
- Occupancy: Healthcare
Building 32 - 3 Stories (Fully Sprinklered)
- Occupancy: Storage
Building OPC - 3 Story (Fully Sprinklered)
- Occupancy: Business
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
11.22.2024 100% Construction Documents (Pharmacy & Bldg 32 Mod)
DRAFT
APPLICABLE STANDARDS:
VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/).
2021 International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)
2021 NFPA 101 Life Safety Code
2022 NFPA 241 Standard for Safeguarding Construction, Alteration, and Demolition Operations
2018 NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900
Occupational, Safety and Health Administration (OSHA) Standards
2019 VA Seismic Design Requirements, H-18-8
2020 National Electrical Code (NEC) (NFPA 70)
2018 International Plumbing Code (IPC)
2019 Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1.
2023 ASME Boiler and Pressure Vessel Code
ASME Code for Pressure Piping
2015 Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)
Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)
Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)
Energy policy Act of 2005 (EPAct)
DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High- Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU)
Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01 00 00 of the VA Master Construction Specification.
Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.
Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2016.
UNLESS OTHERWISE SPECIFIED, SPECIFIC REFERENCES TO CODES, REGULATIONS, STANDARDS, MANUFACTURERS' INSTRUCTIONS, OR REQUIREMENTS OF REGULATORY AGENCIES, SHALL MEAN
THE LATEST EDITION OF EACH IN EFFECT AT THE DATE OF PROJECT SUBMISSION (U.N.O.)
AB
A
ANCHOR BOLT
AD AREA DRAIN
ADDL ADDITIONAL
ADH
ADDITIONAL
ADHESIVE
ADJ
AFF
ADJACENT
AFG
ABOVE FINISH FLOOR
AFS
ABOVE FINISH GRADE
ABOVE FINISH SLAB
ALUM
ALT
ALUMINUM
ALTERNATE
APPROX
ARCH
APPROXIMATE(LY)
ARCHITECT(URAL)
ASPH ASPHALT
AVG AVERAGE
B
BD BOARD
BTWN
BLDG
BETWEEN
BUILDING
BM
BOT
BENCHMARK
BOTTOM
BITUM BITUMINOUS
BOS BOTTOM OF STEEL
C
CEM CEMENT, CEMENTITIOUS
CJ CONTROL JOINT
CL
CLG
CLR
CMU
COL
CONC
CONN
CONSTR
CONT
CONTR
CORR
CU
CW
CENTER LINE
CEILING
CLEAR
CONCRETE MASONRY UNIT
COLUMN
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORRUGATED
CUBIC
COLD WATER
D
D
DEPTH
DBL DOUBLE
DEG DEGREE
DEMO DEMOLISH
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIM PT DIMENSION POINT
DIST DISTANCE
DN DOWN
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DWGS DRAWINGS
(E)
E
EXISTING
EA EACH
EDR EQUIPMENT DRAWING
EIFS EXTERIOR INSULATION FINISH SYSTEM
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPB ELECTRICAL PANEL BOARD
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
EST ESTIMATE(D)
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXP EXPANSION
EXP JT EXPANSION JOINT
EXT EXTERIOR
FXTR FIXTURE
G
G
GAS
H
H
HIGH
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS FIBER REINFORCED GYPSUM
GL GLASS
GLU LAM GLUE LAMINATED
GLZ GLAZING
GR GRADE OR GRADING
ID
I
INSIDE DIAMETER
J
L
L
LENGTH, LONG
M
M
METERS
(N)
N
NEW
P
Q
R
R
RISER
S SOUTH
T
W
W
WEST
XFMR
X
TRANSFORMER
YD
Y
YARD
HDW HARDWARE
HGT HEIGHT
HNDRL HANDRAIL
HORIZ HORIZONTAL
HPT HIGH POINT
HVAC HEATING-VENTILATION-AIR CONDITIONING
IN INCH
INCL INCLUDE, INCLUDING
INFO INFORMATION
INSUL INSULATION
INTR INTERIOR
JST JOIST
JT JOINT
LB POUND
LF LINEAR FOOT
LG LENGTH
LIN LINEAR
LPT LOW POINT
LT LIGHT
LTG LIGHTING
LVR LOUVER
HW HOT WATER
S
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETERS
MOD MODULE, MODULAR
MTD MOUNTED
MTG MOUNTING
MVBL MOVABLE
NA NOT APPLICABLE
NE NORTHEAST
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOICE REDUCTION COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
PLBG PLUMBING
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PNL BD PANEL BOARD
PNT PAINT
PR PAIR
PRCST PRECAST
PREP PREPARATION
PREFAB PREFABRICATION
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PVG PAVING
PVMT PAVEMENT
PWR POWER
QTR QUARTER
QTY QUANTITY
RAD RADIUS
RD ROOF DRAIN
RECT RECTANGULAR
REF REFERENCE
REINF REINFORCE (D) (ING) (MENT)
REQD REQUIRED
REQT REQUIREMENT
RET RETURN
REV REVISION
RHMS ROUND HEAD MACHINE SCREW
RHWS ROUND HEAD WOOD SCREW
RM ROOM
RND ROUND
SCHED SCHEDULE
SCRN SCREEN
SE SOUTHEAST
SECT SECTION
SEG SEGMENT
SEP SEPARATION OR SEPARATE
SEP JT SEPARATION JOINT
SHT SHEET, SHEETING
SIM SIMILAR
SMS SHEET METAL SCREW
SP SPACE, SPACED, SPACING
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SST STAINLESS STEEL
ST STREET
STAG STAGGERED
STC SOUND TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
STS SELF-TAPPING STEEL
SUSP SUSPENDED
SVCE SERVICE
SW SOUTHWEST
SYMM SYMMETRICAL
SYST SYSTEM
T&B TOP AND BOTTOM
TC TOP OF CONCRETE, TOP OF CURB
TEL TELEPHONE
TEMP TEMPORARY
THERM THERMAL
THK THICK, THICKNESS
THRES THRESHOLD
THRU THROUGH
TMPD GL TEMPERED GLASS
TO TOP OF
TOR TOP OF RAILING
TOS TOP OF STEEL
TOT TOTAL
TOW TOP OF WALL
TP TOP OF PAVEMENT
TTB TELEPHONE TERMINAL BOARD
U
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTABLE POWER SUPPLY
UTIL UTILITY
W/ WITH
W/O WITHOUT
WD WOOD
WDW WINDOW
WGL WIRE GLASS
WM WIRE MESH
WO WHERE OCCURS
WPT WORKING POINT
WR WATER RESISTANT
WSCT WAINSCOT
WSP WET STANDPIPE
WT WEIGHT
WTHPRF WEATHERPROOF
WTRPRF WATERPROOF
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
BUR BUILT UP ROOFING SYSTEM
F
FA FIRE ALARM
FAS FIRE ALARM STATION
FB FLAT BAR
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FF FINISH FACE
FHMS FLAT HEAD MACHINE SCREW
FHWS FLAT HEAD WOOD SCREW
FLAM FLAMMABLE
FLASH FLASHING
FLEX FLEXIBLE
FO FACE OF
FSTNR FASTENER
FT FOOT, FEET
OC
O
ON CENTER
PA PUBLIC ADDRESS
OA OVERALL
OD OUTSIDE DIAMETER
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
OVHD OVERHEAD
PART PARTIAL
PCF POUNDS PER CUBIC FOOT
PCI POUNDS PER CUBIC INCH
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PI POINT OF INTERSECTION
PL PLATE
P
V
VB VALVE BOX
VERT VERTICAL
VIT VITREOUS
VP VENT PIPE
VOL VOLUME
ABBREVIATIONS
SYMBOLS
ANGLE
@ AT
C CENTER LINEL
Ø DIAMETER
= EQUAL
> GREATER THAN
< LESS THAN
± PLUS OR MINUS (TOLERANCE)
# POUND(S)
' FOOT OR FEET
" INCH OR INCHES
FOF FACE OF FINISH
HSS HOLLOW STRUCTURAL STEEL
SYMBOLS LEGEND
N
SHEET
NORTH IDENTIFIER
ELEVATION
IDENTIFIER
KEY NOTE TAG
CALL-OUT IDENTIFIER
? PHOTOGRAPH
LOCATIONS
SHEET #
REF # ON SHEET
TPO T.P.O ROOFING
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED BY
THE "INDEX OF DRAWINGS".
2. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE
DRAWINGS OF ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – REFER
TO THE "SHEET INDEX".
3. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND
ESTABLISH MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
THIS PROJECT AND ALL PARTS OF THE WORK ASSOCIATED WITH THE PROJECT -
INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC - SHALL COMPLY WITH ALL
APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND LAWS OF ALL
FEDERAL, STATE, DISTRICT, TERRITORIAL, AND LOCAL GOVERNMENT AUTHORITIES HAVING
JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE NOR
PERMIT WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION,
ORDINANCE, OR LAW.
4. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT
ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS.
5. SCHEDULE & COORDINATE CONSTRUCTION WORK HOURS TO ACCOMMODATE THE
OPERATION OF THE FACILITY.
6. THE ARCHITECTURAL DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS WHICH,
WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE INDEX OF DRAWINGS. THE
SET OF DRAWINGS, WHEN COMPLETE, CONSISTS OF ALL DRAWINGS LISTED BY THE "SHEET
INDEX". PARTIAL SETS OF DRAWINGS ARE INCOMPLETE.
THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND
ELEVATIONS ILLUSTRATE THE DESIGN INTENT. THE ARCHITECTURAL DRAWINGS
ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND LOCATION OF MANY, BUT
NOT ALL, EXPOSED ELEMENTS OF THE WORK. THE STRUCTURAL, MECHANICAL,
ELECTRICAL, PLUMBING, OTHER DRAWINGS, AND JOB SPECIFICATIONS ARE
SUPPLEMENTARY TO THE ARCHITECTURAL WORKING DRAWINGS.
THE WORK DESCRIBED BY THE DRAWINGS OF ANY ONE DISCIPLINE MAY BE AFFECTED BY
THE WORK DESCRIBED ON DRAWINGS OF ANOTHER DISCIPLINE OR MANUFACTURER
INSTALLATION REQUIREMENTS. SHOULD THEY DISAGREE IN THEMSELVES, OR WITH EACH
OTHER, BIDS SHALL BE BASED ON THE MOST EXPENSIVE COMBINATION OF QUALITY AND
QUANTITY OF WORK INDICATED. ANY DISCREPANCY BETWEEN THESE DOCUMENTS SHALL
BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER FOR
CLARIFICATION.
7. THE SPECIFICATIONS ARE INTENDED TO COMMUNICATE THE DETAILED PROPERTIES AND
QUALITY OF THE INDIVIDUAL MATERIALS, ASSEMBLIES, AND SYSTEMS THAT COMPRISE THE
WORK; THE FUNCTIONAL AND PERFORMANCE REQUIREMENTS FOR THE INDIVIDUAL PARTS
OF THE WORK; AND THE FABRICATION AND INSTALLATION REQUIREMENTS FOR INDIVIDUAL
PARTS OF THE WORK - THE SPECIFICATIONS TAKE PRECEDENCE OVER THE DRAWINGS
WITH RESPECT TO INFORMATION OF THIS NATURE.
8. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
A. ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE
MANUFACTURES AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR
ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
B. THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE
CONTRACTING OFFICER. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO
ADDITIONAL EXPENSE TO THE GOVERNMENT) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF
DESIGN" SHOWN IN THE CONTRACT DOCUMENTS.
C. THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
VARY FROM THAT SHOWN BY THE DRAWINGS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COORDINATION OF THE WORK OF THE TRADES,
SUBCONTRACTORS, AND MATERIAL SUPPLIERS
GENERAL NOTES CONTINUED:
9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES, AND SUPPLIERS WITH ALL REQUIREMENTS OF THE
CONTRACT DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT
ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE
REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK
OF THAT PARTY.
CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT, TOOLS AND SERVICES
NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF ALL WORK SHOWN,
DESCRIBED, OR REASONABLY IMPLIED, BUT NOT LIMITED TO THAT EXPLICITLY INDICATED
IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, FITTING, OR PATCHING
THAT MAY BE REQUIRED TO COMPLETE WORK OR TO MAKE ITS SEVERAL PARTS FIT
TOGETHER.
10. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE COORDINATION
DRAWINGS SHOWING THE LOCATION OF OPENINGS THROUGH SLABS, THE PIPE SLEEVES
AND HANGER INSERTS, AS WELL AS THE LOCATION AND ELEVATION OF UTILITY LINES,
INCLUDING, BUT NOT LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND
CONDUITS AND PIPES TWO INCHES AND LARGER IN DIAMETER WITH THEIR SUPPORTS.
THESE DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS APPROPRIATE,
SHALL CLEARLY SHOW THE MANNER IN WHICH THE UTILITIES FIT INTO THE AVAILABLE
SPACE AND RELATE TO EACH OTHER AND TO EXISTING BUILDING ELEMENTS. DRAWINGS
SHALL BE OF APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES, BUT
NOT SMALLER THAN 3/8” SCALE. DRAWINGS MAY BE COMPOSITE (WITH DISTINCTIVE
COLORS FOR THE VARIOUS TRADES) OR MAY BE SEPARATE BUT FULLY COORDINATED
DRAWINGS OF THE SAME SCALE. SEPARATE DRAWINGS SHALL BE ALIGNED TO DEPICT
IDENTICAL BUILDING AREAS OR SECTIONS AND SHALL BE CAPABLE OF BEING OVERLAID IN
ANY COMBINATION. THE SUBMITTED DRAWINGS FOR A GIVEN AREA OF THE PROJECT
SHALL SHOW THE WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR
AREA. COMPLETE COMPOSITE DRAWINGS IN ELECTRONIC FORMAT SHALL BE RECEIVED BY
THE GOVERNMENT NOT LESS THAN 20 FEDERAL WORKING DAYS PRIOR TO THE
SCHEDULED START OF THE WORK IN THE AREA ILLUSTRATED BY THE DRAWINGS, FOR THE
PURPOSE OF SHOWING THE CONTRACTOR’S PLANNED METHODS OF INSTALLATION. THE
OBJECTIVES OF SUCH DRAWINGS ARE TO PROMOTE CAREFULLY PLANNED WORK
SEQUENCE AND PROPER TRADE COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS
SOLUTIONS OF PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENT AS
CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR MINIMIZING
ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE GOVERNMENT. IN THE EVENT THE
CONTRACTOR, IN COORDINATING THE VARIOUS INSTALLATIONS AND IN PLANNING THE
METHOD OF INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF THE
UTILITIES WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH OTHER CONSTRUCTION
ITEMS, THE GENERAL CONTRACTOR SHALL BRING THIS CONFLICT TO THE ATTENTION OF
THE CONTRACTING OFFICER IMMEDIATELY.
IN DOING SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD OF SOLVING THE
PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW TO PROCEED IF ADJUSTMENTS
BEYOND THOSE OF USUAL TRADES’ COORDINATION ARE NECESSARY. INSTALLATION OF
UTILITIES WORK WILL NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND
COMPLETION OF THE GOVERNMENT REVIEW OF THE COORDINATION DRAWINGS FOR THAT
AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY THE COORDINATION
DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN CORRECTED TO THE SATISFACTION OF THE
CONTRACTING OFFICER. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
SUBMIT THE REQUIRED DRAWINGS IN A TIMELY MANNER CONSISTENT WITH THE
REQUIREMENTS TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN THE
PRESCRIBED CONTRACT TIME.
11. THE ARCHITECT / ENGINEERS SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT
BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON
PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE
WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR.
12. ALL WORK NOTED "N.I.C." OR "NOT IN CONTRACT" IS TO BE ACCOMPLISHED BY A
CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND IS NOT TO BE PART OF THE
CONSTRUCTION AGREEMENT. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE TO
COORDINATE WITH ALL "OTHER" CONTRACTORS PER REQUIREMENTS ESTABLISHED BY
GOVERNMENT, WHICH ARE UNDER SEPARATE CONTRACT WITH THE GOVERNMENT.
13. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE GOVERNMENT SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL PROMPTLY CORRECT ALL WORK REJECTED BY THE GOVERNMENT AS
DEFECTIVE OR AS FAILING TO CONFORM TO THE CONTRACT DOCUMENTS WHETHER
OBSERVED BEFORE OR AFTER SUBSTANTIAL COMPLETION AND WHETHER OR NOT
FABRICATED, INSTALLED OR COMPLETED. THE CONTRACTOR SHALL BEAR ALL COSTS OF
CORRECTING SUCH REJECTED WORK.
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
GI001
SHEET INDEX, APPLICABLE
STANDARDS & GENERAL NOTES
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
APPLICABLE STANDARDS SHEET INDEX
PROJECT GENERAL NOTES
BLDG 0PC
GI100 BUILDING OPC ROOF REFERENCE PLAN
AD200 BUILDING OPC ROOF DEMOLITION PLAN
AE200 BUILDING OPC ROOF RENOVATION PLAN
AE500 BUILDING OPC EXTERIOR ELEVATIONS & WALL SECTIONS
S200 BUILDING OPC ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 01
GI101 BUILDING 01 ROOF REFERENCE PLAN
GI101A BUILDING 01 LOBBY ROOF REFERENCE PLAN
GI101B BUILDING 01 UPPER ROOF - WEST REFERENCE PLAN
GI101C BUILDING 01 UPPER ROOF - EAST REFERENCE PLAN
GI101D BUILDING 01 PHARMACY ROOF REFERENCE PLAN
AD201A BUILDING 01 LOBBY ROOF DEMOLITION PLAN
AD201B BUILDING 01 UPPER ROOF - WEST DEMOLITION PLAN
AD201C BUILDING 01 UPPER ROOF - EAST DEMOLITION PLAN
AD201D BUILDING 01 PHARMACY ROOF DEMOLITION PLAN
AE201A BUILDING 01 LOBBY ROOF RENOVATION PLAN
AE201B BUILDING 01 UPPER ROOF - WEST RENOVATION PLAN
AE201C BUILDING 01 UPPER ROOF - EAST RENOVATION PLAN
AE201D BUILDING 01 PHARMACY ROOF RENOVATION PLAN
AE501A BUILDING 01 EXTERIOR ELEVATIONS
AE501B BUILDING 01 EXTERIOR ELEVATIONS
AE501C BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS
AE501D BUILDING 01 EXTERIOR ELEVATIONS & WALL SECTIONS
S201 BUILDING 01 UPPER ROOF RENOVATION STRUCTURAL PLAN
S201A BUILDING 01 LOBBY ROOF RENOVATION STRUCTURAL PLAN
S201B BUILDING 01 UPPER WEST ROOF RENOVATION STRUCTURAL PLAN
S201C BUILDING 01 UPPER EAST ROOF RENOVATION STRUCTURAL PLAN
S201D BUILDING 01 PHARMACY ROOF RENOV. STRUCTURAL PLAN & DETAILS
BLDG 02 & 22
GI102 BUILDINGS 02 & 22 ROOF REFERENCE PLAN
GI102A BUILDINGS 02 & 22 ROOF REFERENCE PHOTOS
AD202 BUILDING 02 & 22 ROOF DEMOLITION PLAN
AE202 BUILDING 02 & 22 ROOF RENOVATION PLAN
AE502 BUILDING 02 & 22 EXTERIOR ELEVATIONS
AE602 BUILDING 02 & 22 WALL SECTIONS
S202A BUILDING 02 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
S202B BUILDING 22 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 03
GI103 BUILDING 03 ROOF REFERENCE PLAN
AD203 BUILDING 03 ROOF DEMOLITION PLAN
AE203 BUILDING 03 ROOF RENOVATION PLAN
AE503 BUILDING 03 EXTERIOR ELEVATIONS
S203 BUILDING 03 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 24
GI124A BUILDING 24 ROOF REFERENCE PLAN
GI124B BUILDING 24 ROOF REFERENCE PHOTOS
AD224A BUILDING 24 ROOF- NORTH DEMOLITION PLAN
AD224B BUILDING 24 ROOF - SOUTH DEMOLITION PLAN
AE224A BUILDING 24 ROOF - NORTH RENOVATION PLAN
AE224B BUILDING 24 ROOF - SOUTH RENOVATION PLAN
AE524A BUILDING 24 EXTERIOR ELEVATIONS
AE524B BUILDING 24 EXTERIOR ELEVATIONS
AE624A BUILDING 24 WALL SECTIONS
S224 BUILDING 24 ROOF OVERALL RENOVATION STRUCTURAL PLAN
S224A BUILDING 24 SOUTH ROOF RENOVATION STRUCTURAL PLANS & DETAILS
S224B BUILDING 24 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN &
DETAILS
BLDG 28
GI128 BUILDING 28 ROOF REFERENCE PLAN
AD228 BUILDING 28 ROOF DEMOLITION PLAN
AE228 BUILDING 28 ROOF RENOVATION PLAN
S228 BUILDING 28 ROOF RENOVATION STRUCTURAL PLAN & DETAILS
BLDG 31
GI131 BUILDING 31 ROOF REFERENCE PLAN
GI131A BUILDING 31 ROOF - NORTH REFERENCE PLAN
GI131B BUILDING 31 ROOF - CENTER REFERENCE PLAN
GI131C BUILDING 31 ROOF - EAST REFERENCE PLAN
GI131D BUILDING 31 ROOF - SOUTH REFERENCE PLAN
AD231A BUILDING 31 ROOF - NORTH DEMOLITION PLAN
AD231B BUILDING 31 ROOF - CENTER DEMOLITION PLAN
AD231C BUILDING 31 ROOF - EAST DEMOLITION PLAN
AD231D BUILDING 31 ROOF - SOUTH DEMOLITION PLAN
AE231A BUILDING 31 ROOF - NORTH RENOVATION PLAN
AE231B BUILDING 31 ROOF - CENTER RENOVATION PLAN
AE231C BUILDING 31 ROOF - EAST RENOVATION PLAN
AE231D BUILDING 31 ROOF - SOUTH RENOVATION PLAN
AE531A BUILDING 31 EXTERIOR ELEVATIONS
AE531B BUILDING 31 EXTERIOR ELEVATIONS & WALL SECTIONS
S231 BUILDING 31 ROOF OVERALL RENOVATION STRUCTURAL PLAN
S231A BUILDING 31 NORTH & PENTHOUSE ROOF RENOVATION STRUCTURAL PLAN
S231B BUILDING 31 CENTRAL ROOF RENOVATION STRUCTURAL PLAN
S231C BUILDING 31 EAST ROOF RENOVATIONSTRUCTURAL PLAN
S231D BUILDING 31 SOUTH ROOF RENOVATION STRUCTURAL PLAN
BLDG 32
GI132 BUILDING 32 REFEERENCE PLAN
AD232 BUILDING 32 ROOF DEMOLITION PLAN
AE232 BUILDING 32 ROOF RENOVATION PLAN
AE532A BUILDING 32 EXTERIOR ELEVATIONS
AE532B BUILDING 32 EXTERIOR ELEVATIONS
S232A BUILDING 32 ROOF RENOVATION STRUCTURAL PLANS & DETAILS
S232B BUILDING 32 ROOF RENOVATION ADD'L STRUCTURAL PLANS & DETAILS
DETAILS
AE1000 TYPICAL DETAILS
AE1001 TYPICAL DETAILS
AE1002 TYPICAL DETAILS
GENERAL
GI000 COVER SHEET
GI001 SHEET INDEX, APPLICABLE STANDARDS & GENERAL NOTES
GI002 OVERALL REFERENCE SITE PLAN
S-000 STRUCTURAL SHEET INDEX, APPLICABLE STANDARDS, & GENERAL NOTES
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
BUS
B U S
BUS
MAIN
ENTRANCE
SIGN
V A
M O N U M E N T
S
IG
N
M O N U M E N T
S
IG
N
S P E E D
B U M P
S P E E D
B U M P
STAGING AREA
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
G E
N E
R A
T O
R
H Y
D R
O N
IC
S
U T
IL
IT
Y P
A D
U T
IL
IT
Y
V A
U L T
FUEL TANK #2FUEL TANK #1
TANK
O2
TANK
O2
TANK
DIESEL
TANK
DIESEL
CLINTON AVENUE
HARVARD AVENUE
N O
R T
H A
N G
U S
S T
R E
E T
MOTORCYCLES
YIELD
YIELD
P A R K
IN
G
L O T
HP
A R K
IN
G
L O T
H
PARKING LOT
APARKING LOT
B
P A R K
IN
G
L O T
C
PARKING LOT
E
P A R K
IN
G
L O T
F
PARKING LOT
G
PARKING LOT
D
DN
DN
N
BLDG 01
BLDG 34
(NO WORK)
BLDG 32
BLDG 02
B36
(NO
WORK)
BLDG 08 (NO WORK)
BLDG 28
BLDG 27
(NO WORK)
BLDG
OPC
BLDG 24
BLDG 03
BLDG 22
BLDG 31
BLDG 01
(NO WORK)
BLDG
22A
(NO
WORK)
BLDG
OPC
BLDG 25
(NO WORK)
BLDG 07 (NO WORK)
BLDG 04 (NO WORK)
GI100
GI103
GI102
GI128
GI101
GI124A
GI131
STAGING
AREA
BLDG 01
PHARMACY
GI132
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
GI002
OVERALL REFERENCE SITE PLAN 570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
1" = 40'-0"
Overall Site Plan
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
GENERAL NOTES, & ABBREVIATIONS
STRUCTURAL APPLICABLE STANDARDS,
S000
/2
1/
:0 6:
am
Te kl a St ru ct ur es
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
ATS
570-21-109
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
N/A 22042
Rev. Date Description
JMH
Structural Engineers and Builders GPLA, Inc.
1450 Veterans Blvd, Suite 300 Redwood City, CA 94063
1215 E Fort Ave, Suite 22 Baltimore, MD 21230
408-654-0475 | www.gplainc.com
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
11.22.2024 100% Construction Documents (Pharmacy & Bldg 32 Mod)
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
Ω
APPLICABLE STANDARDS:
GENERAL NOTES:GUARDRAIL FABRICATION & COMPONENTS:
STRUCTURAL GENERAL NOTES
1. These drawings must be used in conjunction with the architectural drawings on the project to clearly define all requirements for construction.
2. No contractor should attempt to bid or construct any portion of this project without consulting the project architectural drawings.
3. All existing conditions must be verified in field. Any discrepancies between the assumed and actual conditions shall be brought to the attention of the COR for proper review.
4. The project scope includes installation of fall protection features to multiple existing buildings on the VA Fresno Healthcare campus. Fall protection includes handrails, ladders, and tieback anchors.
1. Stainless Steel Guardrails:
a. Guardrails noted as stainless steel shall be shop fabricated to match field-verified geometry using
CJP welds at all railing-post connections. Welds shall be ground smooth to match architectural intent .
b. If splicing of the guardrails is required for transportation to site, fabricator shall submit splice details for review and approval by the SEOR.
c. The guardrail post bases attached to existing structure are intended to be installed separately, prior to roofing repair, waterproofing, and guardrail installation. It is recommended that these post bases be installed prior to guardrail fabrication to ensure that the post spacing within the guardrail assemblies matches the spacing of the field-installed post bases.
2. Galvanized Pipe Guardrails:
a. Galvanized pipe guardrails are intended to be delivered to site as loose pieces, cut to size either in the shop or on site, rather than as pre-assembled guardrail systems. Guardrail posts shown as welded to their base plates can be shop assembled to eliminate field-welding.
b. Rail to post connections are intended to be off-the-shelf pipe fittings that meet the requirements of ASTM A47-77-32510, unless noted otherwise on the drawings. The basis-of-design fittings are "KEE KLAMP" components manufactured by Kee Safety, Inc. The following fittings shall be used unless noted otherwise on the drawings.
Connection Type Component Description KEE KLAMP Fitting Top rail to post connections "Single Socket Tee" Type 10 or equivalent Mid rail to post connections "Two Socket Cross" Type 26 or equivalent Top rail splices "Straight Coupling" Type 14 Rail corner connections "90° Elbow" Type 15 Where noted on plan "Obtuse Angle Elbow" Type 55 Where noted on plan "Side Outlet 90° Elbow" Type 21
b. Top rails should be continuous across a minimum of two posts unless noted otherwise. Mid rails should be continuous between posts. Posts do not occur at guardrail corners except where noted on plan.
c. Where overhang (O.H.) dimensions are noted on plan, rails extend beyond the end post. Connect top and mid rails to each other using a vertical pipe and (2) "90° Elbow" fittings.
d. Where overhang (O.H.) dimensions are not noted on plan, top and mid rails stop at the end post.
Connect top rail to end post using a "90° Elbow" fitting. Connect mid rail to end post using a "Single Socket Tee" fitting.
STRUCTURAL STEEL:
1. Steel Sections:
Rolled wide-flange sections A992 Gr. 50 50 ksi Rolled channels & angles A36 36 ksi Rectangular HSS A500 Gr. C 50 ksi Round HSS A500 Gr. C 46 ksi Pipes A53 Gr. B 35 ksi Plates & bent plates A572 Gr. 50 50 ksi Stainless steel guardrail elements 304L 30.5 ksi
2. Structural steel has been designed in accordance with Load and Resistance Factor Design (LRFD) procedures as required by "AISC Manual of Steel Construction" and "AISC Specification for Structural Steel Buildings," 2016 edition. All beam shears, reactions, member forces, moments, etc. shown on these drawings correspond to factored (ultimate) loads.
3. Connection Design:
a. The SEOR intends to provide all steel connection designs. Connection designs have been included in the contract documents.
b. If a connection design is inadvertently omitted from contract documents, the contractor shall request specific written connection design from the COR.
c. Contractor deviations from connection designs shown on the contract documents will be rejected unless contractor submits complete structural calculations for approval. Calculations shall be sealed by a Professional Engineer registered in the state where the project is located.
d. Contractor deviations fabricated without written approval by the COR will be deemed a contractor design with total design responsibility remaining with the contractor.
4. Bolted Connections:
a. Minimum bolt diameter: 3/4" unless noted otherwise
b. Two bolts minimum per connected member.
c. Use fully tensioned F1852SC or F2280SC bolts for bracing, moment connections, cantilevers, tension members, roof panel connections, and at oversized or slotted holes where the force on the joint is not normal to the axis of the slot. Use F1852 or F2280 elsewhere.
d. Bolts in connections that are not slip critical, nor subject to tension, nor required to be fully tensioned bearing type connections need only be tightened to the snug tight condition. Snug tight condition is defined as the tightness that exists when all plies in a joint are in firm contact. This may be attained by a few impacts of an impact wrench or the full effort of a man using an ordinary spud wrench.
e. A307 bolts may be used only where indicated.
f. Oversized and long slotted holes are permitted only where shown.
g. The standard bolt hole diameter is the bolt diameter + 1/16".
5. Welded Connections:
a. Electrodes: E70xx electrodes excluding E 70-T-4. When welding to stainless steel components, use stainless-steel compatible electrodes with F EXX = 70 ksi.
b. Fillet welds: AISC minimum but not less than 3/16", unless noted otherwise.
c. Groove welds: full penetration, unless noted otherwise.
d. Welds are continuous unless noted otherwise.
6. Galvanizing:
a. All structural steel members and plates are to be hot-dipped galvanized unless called out as stainless steel.
b. All bolts, nuts, and other hardware are to be galvanized.
c. Shop-weld assemblies prior to galvanizing when possible. If field welding must be done, use galvanizing repair paint. Submit product data to the COR for review.
7. Post-installed anchors:
a. Install products as shown in connection details with no deviations from manufacturer, item type, diameter, and embedment length. Anchors or threaded rods shall be either stainless steel or galvanized .
b. Adhere to manufacturer installation instructions in all circumstances. Verify anchor substrate in the field. Notify the COR where field conditions differ from those shown in the connection details or where field conditions are incompatible with the manufacturer's instructions .
2021 International Building Code (IBC)
2023 VA Seismic Design Requirements, H-18-8
2022 Minimum Design Loads and Associated Criteria for Buildings and Other Structures, American Society of Civil Engineers (ASCE/SEI 7-22), Provisions and Commentary
Steel Construction Manual, American Institute of Steel Construction (AISC), 15th Edition 2016 AISC Specification for Structural Steel Buildings (ANSI/AISC 360-16) 2014 RSCR Specification for Structural Joints Using High-Strength Bolts (AISC 348-14) 2016 AISC Code of Standard Practice for Steel Buildings and Bridges (ANSI/AISC 303-16)
Building Code Requirements for Reinforced Concrete, American Concrete Institute, and Commentary (ACI 318-19)
DESIGN CRITERIA:
1. Dead Loads:
Self-weight of existing building assemblies (parapet, roof, etc.)
Self-weight of new fall protection components (ladder, tieback anchorage, etc.)
2. Roof Live Loads:
20 psf reducible IBC Table 1607.1 & §1607.14.2
3. Fall Protection Design Criteria:
200-lb (unfactored) live load point load outward or downward applied at the top of guardrail
OSHA §1910.29(b)(3) & OSHA § 1926.502(b)(3) 150-lb (unfactored) live load point load outward or downward applied at midrails or posts
OSHA §1910.29(b)(5) & OSHA § 1926.502(b)(5) Anchorage capacity of 5000 lbs in any direction tieback anchors OSHA §1926.502(d)(15) Live load of 3000 lbs live load in any direction on tieback anchors OSHA §1926.502(e)(2)
(2) 250-lb point loads acting on a ladder concurrently OSHA §1926.1053(a)(1)(iii)
(1) 250-lb point load on any rung or portion of a ladder OSHA §1926.1053(a)(1)(iii)
4. Wind Load Parameters:
N/A. The fall protection live loads in item #3 above govern all design.
5. Seismic Parameters:
N/A. The fall protection live loads in item #3 above govern all design.
MISCELLANEOUS NOTES:
1. Means and methods of construction and erection of structural materials are solely the Contractor's responsibility.
2. The structure is designed to function as a unit upon completion of construction of the project and then, only to support the design loads indicated. The contractor is responsible for means, methods and sequence of construction and the adequacy of the structure to support loads occurring during construction of the project. Furnish all temporary bracing, shoring, and/or support as may be required.
3. Where supported slabs are to be used for staging or temporary storage area the contractor shall verify that unit loads do not exceed the design loads for the supporting slabs.
4. No openings, or any change in size, dimension or location shall be made in any structural element without written approval of the COR.
5. Do not scale these drawings, use the dimensions shown.
6. No structural modifications, alterations, or repairs shall be made without prior review by COR. Submit details and calculations prepared by a professional engineer registered in state where project is located and employed by contractor.
APPLICABLE STANDARDS
N
GI100
EXISTING PARAPET 45"
@ ROOF EDGE
EXISTING PARAPET 45"
@ ROOF EDGE
EXISTING PARAPET 45"
@ ROOF EDGE
EXISTING PARAPET 6"
@ ROOF EDGE
GI100 2
BUILDING 01
(SEE GI101)
NOTE: AREA SHOWN FOR
REFRENCE ONLY, NO WORK
REQUIRED AT 45" PARAPET,
EXISTING GUARDRAIL MEETS FALL
PROTECTION REQUIRMENTS
AD200
1 1
AE200
EXISTING PARAPET 9"
@ ROOF EDGE
GI100
GI100 5
GI100
GI100
(E) ROOF DRAIN
(E) VENT
? PHOTOGRAPH LOCATIONS
ROOF LEGEND:
(E) PV PANEL
(E) MECHANICAL UNIT/ DUCT WORK (SIZE AND SHAPE
VARIES)
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
GI100
BUILDING OPC ROOF REFERENCE
PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
KEY PLAN
N
1 1/2" = 1'-0"
Building OPC - Main Roof
OPC
1/8" = 1'-0"
Building OPC Roof (Existing)
45" PARAPET
9" PARAPET w/ BALLAST ROOFING OVER ASPHALT
UPPER ROOF ACCESS LADDER
1 1/2" = 1'-0"
Building OPC - Walkway
6" PARAPET WITH METAL COPING
MESH BIRD SCREEN
1 1/2" = 1'-0"
Building OPC - Penthouse 2
1 1/2" = 1'-0"
Building OPC - Penthouse 1
1 1/2" = 1'-0"
Building OPC - Penthouse 3 1 1/2" = 1'-0"
Building OPC - Penthouse 4
ROOF ACCESS
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
OPEN TO BELOW
104104
104104
F
R O
M B
E A
M
149 149
BUILDING 01
ROOF BELOW
BUILDING 01
THIRD
FLOOR
INTERIOR
BUILDING OPC
LOWER ROOF
(NO WORK)
N
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
AD200
BUILDING OPC ROOF DEMOLITION
PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
1/4" = 1'-0"
OPC - Penthouse Roof Plan (Demolition)
N
Key Notes
104 (E) BALLASTED BUILT-UP ASPHALT ROOFING OVER
CONCRETE METAL DECK.
106 (E) COPING TO REMAIN (PROTECT IN PLACE).
108 (E) ROOF DRAIN TO REMAIN (PROTECT IN PLACE).
113 (E) ROOF ACCESS LADDER TO REMAIN (PROTECT IN
PLACE).
135 (E) SOLAR COLLECTOR PANELS TO REMAIN (PROTECT IN
PLACE).
148 ROOF ACCESS THROUGH EXTERIOR WINDOW.
149 REMOVE (E) SECTION OF ROOFING AS NEEDED TO PREP
AREA FOR INSTALLATION OF NEW WORK (REFER TO
RENOVATION PLANS).
KEY PLAN
OPC
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
AE500 3
AE500
AE5004
AE500
OPEN TO BELOW
BUILDING OPC
LOWER ROOF
(NO WORK)
T Y
P
AE1000
BUILDING 01
THIRD
FLOOR
INTERIOR
BUILDING 01
ROOF BELOW
AE500
AE500
AE500
AE500
AE500
210206 206 206206
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
AE200
BUILDING OPC ROOF RENOVATION
PLAN
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
KEY PLAN
OPC
1/4" = 1'-0"
OPC - Penthouse Roof Plan (Renovation)
N
Key Notes 201 (N) 1-1/2" DIAMETER GALVANIZED PIPE RAIL w/ POSTS AT
6'-0" O.C.; CENTER SPACING ON WALL & PROVIDE (1) POST
WITHIN 24" OF EACH CORNER.
206 INSTALL 18" HIGH TIE-BACK ANCHOR w/ FIXED 'D' RING
(PROBEL: PBE73-00A4) TO BE ANCHORED THROUGH THE
EXISTING ROOF DECK (REFER TO STRUCTURAL). PATCH &
REPAIR EXISTING ROOFING TO MATCH MANUFACTURER'S
REQUIREMENTS AND INSTALL FLASHING.
210 PATCH & REPAIR ROOF MEMBRANE ASSEMBLY PER
MANUFACTURER'S REQUIREMENTS AT GUARDRAIL
ANCHORS, REPLACE PARAPET CANT STRIPS AS NEEDED /
APPLICABLE (REFER TO TYPICAL DETAILS).
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
AE500
T.O. ROOF
LEVEL 1
AE500
T.O. ROOF
LEVEL 1
TYP.
AE500
T.O. ROOF
LEVEL 1
T.O. ROOF
LEVEL 1
AE500
AE1001
F R
O M
T .O
R
O O
F
1’−2"
CL
REFER TO 2/S200 FOR
CORRESPONDING DETAIL
AE1001
F R
O M
T .O
R
O O
F
1’−2"
CL
REFER TO 3/S200 FOR
CORRESPONDING DETAIL
TERMINATION SEALANT @
PERIMETER
(E) ROOFING MEMBRANE
o/ RIGID INSULATION PER SCHEDULE o/ ROOF DECKING
REFER TO STRUCTURAL FOR
WELD CONNECTION
REQUIREMENTS
PRE-MANUFACTURED TIE
BACK ASSEMBLY
CLAMPED FLASHING
REFER TO 4/S200 FOR
CORRESPONDING DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
AA/RF
AE500
BUILDING OPC EXTERIOR ELEVATIONS
& WALL SECTIONS
570-21-109
SMc
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
N/A
22042
3/16" = 1'-0"
Building OPC - South Elevation
3/16" = 1'-0"
Building OPC - East Elevation
3/16" = 1'-0"
Building OPC - North Elevation
3/16" = 1'-0"
Building OPC - West Elevation
Building OPC
1 1/2" = 1'-0"
OPC Penthouse Guardrail @ Perpendicular Deck
Key Notes
113 (E) ROOF ACCESS LADDER TO REMAIN (PROTECT IN
PLACE).
201 (N) 1-1/2" DIAMETER GALVANIZED PIPE RAIL w/ POSTS AT
6'-0" O.C.; CENTER SPACING ON WALL & PROVIDE (1) POST
WITHIN 24" OF EACH CORNER.
603 STRUCTURAL BASE PLATE w/ RAIL POST (REFER TO
STRUCTURAL).
606 UNDER DECK STEEL SUPPORT (REFER TO STRUCTURAL).
609 1-1/2" DIA. GALVANIZED PIPE POST CONNECTED TO BASE
PLATE (REFER TO STRUCTURAL).
612 1-1/2" DIA. GALVANIZED PIPE RAIL CONNNECTED TO POST
(REFER TO STRUCTURAL).
620 (E) ROOF MEMBRANE.
1 1/2" = 1'-0"
OPC Penthouse Guardrail @ Parallel Deck
OPC
3" = 1'-0"
Tie-Back Anchor @ OPC Building
Rev. Date Description
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
Te kl a St ru ct ur es
STRUCTURAL PLAN & DETAILS
BUILDING OPC ROOF RENOVATION
S200
/2
1/
:2 4:
pm
OPC
Project Number
Building Number
Drawing Number
Project Title
Location:
PhaseDrawing Title
Approved:
Issue Date Checked Drawn
StampARCHITECT / ENGINEER OF RECORDCONSULTANT
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
Revisions:
MA Architects, Inc.
385 Van Ness Ave., Suite 110, Torrance, CA 90501 www.ma-architects.net
Planning - Architecture - Interiors
Project Number
INSTALL FALL PROTECTION
ATS
570-21-109
JMH
VA Central California Healthcare System 2615 E Clinton Ave, Fresno, CA 93703
N/A 22042
Rev. Date Description
KEY PLAN
Structural Engineers and Builders GPLA, Inc.
1450 Veterans Blvd, Suite 300 Redwood City, CA 94063
1215 E Fort Ave, Suite 22 Baltimore, MD 21230
408-654-0475 | www.gplainc.com
10.13.2022 35% Schematic Design
05.24.2023 65% Design Development
08.04.2023 95% Construction Documents
04.03.2024 100% Construction Documents
10.29.2024 95% Construction Documents (Pharmacy & Bldg 32 Mod)
11.22.2024 100% Construction Documents (Pharmacy & Bldg 32 Mod)
11/22/2024
100% CONSTRUCTION
DOCUMENTS (PHARMACY
& BLDG 32 MOD)
OPC - PENTHOUSE ROOF PLAN
SCALE = 1:641
OPC PH ROOF GUARDRAIL
CONN, DECK PERPENDICULAR
SCALE = 1:122
SECTION VIEW
SCALE = 1:122A
OPC CONNECTOR TIEBACK ANCHOR CONN
TO (E) BM W/ DECK PERPENDICULAR TO BM
SCALE = 1:124
OPC PH ROOF GUARDRAIL
CONN, DECK PARALLEL
SCALE = 1:123
D
54 6
E
C
B
A
7 8
O.H. CONFLICT W/ (E) FRAMING BELOW
N O
M
IN
AL
H
EI
G
H T
DETAILS.
CONNECTION DETAILS IF ROOF CONDITIONS ARE NOT COMPATIBLE WITH THE INTENDED CONNECTION BACKING PRIOR TO TIEBACK ANCHOR INSTALLATION. CONTACT THE COR FOR REVISED SPACING OR CENTERED BETWEEN EXISTING ROOF JOISTS. CONTRACTOR TO VERIFY JOIST LOCATIONS AND INSTALL LOCATIONS MAY BE ADJUSTED UP TO 12" IN ANY DIRECTION TO ENSURE TIEBACK CONNECTIONS ARE
7. WHERE TIEBACK ANCHORS SHOWN ATTACH TO EXISTING CFS ROOF CONSTRUCTION, TIEBACK
COMPATIBLE WITH THE INTENDED CONNECTION DETAILS.
CONTACT THE COR FOR REVISED SPACING OR CONNECTION DETAILS IF PARAPET CONDITIONS ARE NOT LOCATIONS AND WORKABLE PARAPET HEIGHT ABOVE EXISTING ROOF PRIOR TO STEEL FABRICATION.
CONNECTION PLATES ATTACH TO THE EXISTING METAL STUDS. CONTRACTOR TO VERIFY STUD
& POST CORNER DIMENSIONS MAY BE ADJUSTED UP TO 12" IN EITHER DIRECTION TO ENSURE
6. WHERE GUARDRAILS SHOWN ATTACH TO EXISTING CFS PARAPET CONDITIONS, GUARDRAIL OVERHANG
THE INTENDED CONNECTION DETAILS.
FOR REVISED SPACING OR CONNECTION DETAILS IF PARAPET CONDITIONS ARE NOT COMPATIBLE WITH WORKABLE PARAPET HEIGHT ABOVE EXISTING ROOF PRIOR TO STEEL FABRICATION. CONTACT THE COR CENTERED IN GROUTED CELLS OF EXISTING CMU. CONTRACTOR TO VERIFY PRECISE CMU LAYOUT AND DIMENSIONS MAY BE ADJUSTED UP TO 6" IN EITHER DIRECTION TO ENSURE ANCHORS ARE INSTALLED
5. WHERE GUARDRAILS SHOWN ATTACH TO EXISTING CMU, GUARDRAIL OVERHANG & POST CORNER
CONNECTION DETAILS.
SPACING OR CONNECTION DETAILS IF ROOF CONDITIONS ARE NOT COMPATIBLE WITH THE INTENDED PRIOR TO DEMOLITION OF ANY ROOFING OR WATERPROOFING ABOVE. CONTACT THE COR FOR REVISED PROPOSED CONNECTION LOCATIONS DO NOT CONFLICT WITH EXISTING FRAMING BELOW THE ROOF DECK
4. WHERE GUARDRAILS SHOWN REQUIRE ROOF PENETRATION, CONTRACTOR TO VERIFY THAT THE
3. FULL BUILDING EXTENTS NOT SHOWN. SEE ARCHITECTURAL SHEETS FOR AREAS OF WORK.
CONDITIONS DIFFER FROM THOSE SHOWN ON THIS PLAN AND ANY REFERENCED DETAILS.
2. ALL EXISTING CONDITIONS SHOWN MUST BE VERIFIED IN FIELD. NOTIFY THE COR WHERE FIELD
APPLICABILITY OF THE DESIGN INTENT SHOWN.
CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AS RELATED TO THIS SCOPE OF WORK TO VERIFY
1. EXISTING STRUCTURE AWAY FROM POINTS OF ATTACHMENT IS SHOWN SCHEMATICALLY ONLY.
NOTES:
1'-6"
CONTRACTOR TO VERIFY DESIRED POST SPACING WILL NOT INTERFERE W/ (E) BMS BELOW PRIOR TO STEEL FABRICATION
S200
ON PLAN PRIOR TO STEEL FABRICATION.
SHOWN TO INTERSECT (N) GUARDRAIL
PLACEMENT OF ALL BEAMS & GIRDERS
CONTRACTOR TO VERIFY PRECISE
(E) STL ROOF BEAMS & GIRDERS, TYP;
1' -6
1'-6"
(E) 10" CONC WALL
S200
G U
AR
D
R
AI
L
PO
ST
S
E
Q S
PA
C
IN
G
; 6 '-0
" M
IN
T O
0'
-0 " M
AX
1' -0
ON PLAN PRIOR TO STEEL FABRICATION.
SHOWN TO INTERSECT (N) GUARDRAIL
PLACEMENT OF ALL BEAMS & GIRDERS
CONTRACTOR TO VERIFY PRECISE
(E) STL ROOF BEAMS & GIRDERS, TYP;
PRIOR TO STEEL FABRICATION
TO VERIFY SIZE & LOCATION
(E) ROOF LADDER, CONTRACTOR
(E) ROOFTOP SOLAR PANELS NOT SHOWN
TYP
ROOF ALONG FULL PERIMETER
(N) GUARDRAIL AT PENTHOUSE
5'-2"±, V.I.F.
ANCHOR, TYP. (4) LOCATIONS
PRE-MANUFACTURED TIEBACK
(E) W18X35 V.I.F.
(E) W12X16 V.I.F.
S200
TYP
EA TIEBACK LOCATION
(N) BM BRACING, TYP
18'-0"±, V.I.F.
GUARDRAIL POSTS @ EQ SPACING; 6'-0" MIN TO 10'-0" MAX
S200
(E) W18X35 V.I.F.
1'-6"
1' -6
(E) W12X22 V.I.F.
(E) W18X35 V.I.F.
(E) W18X35 V.I.F. (E) W18X35 V.I.F.
(E )W
X2
V.
I.F
(E )W
X2
V.
I.F
(E )W
X1
V.
I.F
(E) W18X35 V.I.F.
(E )W
X2
V.
I.F
(E )W
X1
V.
I.F
(E) W8X15 V.I.F.
(E) W12X22 V.I.F.
U.N.O.
TYP
SIM
PRIOR TO STEEL FABRICATION.
CONTRACTOR TO VERIFY IN FIELD
OVER 112/ " 18 GA. METAL DECK;
112/ " LWC OVER 112/ " INSULATION
PRIOR TO STEEL FABRICATION.
CONTRACTOR TO VERIFY IN FIELD
OVER 112/ " 20 GA. METAL DECK;
112/ " LWC OVER 112/ " INSULATION
GUARDRAIL POSTS @ EQ SPACING; 6'-0" MIN TO 10'-0" MAX
C O
N
TR
AC
TO
R T
O V
ER
IF
Y D
ES
IR
ED
P
O
ST
S
PA
C
IN
G W
IL
L
N O
T
IN
TE
R
FE
R
E W
E)
B M
S
BE
LO
W
P R
IO
R
T O
S
TE
EL
F
AB
R
IC
AT
IO
N
19'-0"±, V.I.F.
INTERFERE W/ (E) BMS BELOW PRIOR TO STEEL FABRICATION
CONTRACTOR TO VERIFY DESIRED POST SPACING WILL NOT
NO POST AT CORNERS, TYP.
IN
TE
R
FE
R E
W
E) B
M S
BE
LO
W P
R
IO
R T
O S
TE
EL
F
AB
R
IC
AT
IO
N C
O N
TR
AC
TO
R
T O
V
ER
IF
Y
D
ES
IR
ED
P O
ST
S
PA
C
IN
G
W
IL
L N
O T
1'-6"
'-0
, V
.I.
F.
10"
'-0
, V
.I.
F.
'-0
, V
.I.
F.
'-0
, V
.I.
F.
26'-0"±, V.I.F.28'-0"±, V.I.F.
1' -6
G
U
AR
D R
AI
L
PO
ST
S
E Q
S
PA
C
IN
G ; 6
'-0 " M
IN
T
O
0' -0
" M
AX
1' -6
1'-6"(2) EQ SPACES, PROVIDED NO
9'-0"11'-0"
( 4 ) 12/ " A307
14/
1'-2"
PL38/ "X10" X 1'-2" BASE PLATE
2- L4X4X14/ X 1'-3"
SPREADER_ANGLE
(E) ROOF ASSEMBLY
(E) PERIMETER BEAM
112/ "
CORRESPONDING DETAIL.
REFER TO 6/AE500 FOR
SEE SHEET NOTE 5.
ASSEMBLY
PARAPET
(E) WALL &
2A S200
512/ "512/ "112/ "
112/ "
IS BEARING ON (3) FLUTES MINIMUM.
AND ADJUST PLACEMENT SO THAT THERE
PROVIDE LONG-SLOTTED HOLES IN L4X4
BEARING
5"5"
1" MIN
112/ "7"
TYP EA L4X4
L4X4X5 16/ FRONT SIDE OF STIFFENERS
L4X4X516/ BACK SIDE OF STIFFENERS
2" MIN OVERLAP
12/
TIEBACK ANCHOR
POST TO (E) STL BM
POST (ALL SHADED ELEMENTS)
PRE-MANUFACTURED TIEBACK
(E) BEAM PER PLAN
SEE NOTE 2
(E) BEAM PER PLAN
SEE NOTE 214/
TYP (3) SIDES
EA END EA L4X4
TO STIFFENER
516/
TYP (3) SIDES
EA STIFFENER
REFER TO 8/AE500 FOR CORRESPONDING DETAIL.
AT SIM: DECK SPANS OTHER WAY.
OF DEMOLITION AT EA TIEBACK ANCHOR LOCATION.
TO MINIMIZE AS MUCH AS POSSIBLE THE EXTENTS
TOP OF STEEL BM AS SHOWN HERE. CONTRACTOR
LOCALLY REMOVE (E) ROOF ASSEMBLY TO ACCESS
1' -3
" M
AX
( 4 ) 12/ " A307 W/ SPACING IN
OTHER DIRECTION PER DET 2A/S200
ASSEMBLY
PARAPET
(E) WALL &
CORRESPONDING DETAIL.
REFER TO 7/AE500 FOR
SEE SHEET NOTE 5.
112/ "
(E) ROOF ASSEMBLY
1'-0" MIN
14/
1" MIN
PL38/ "X10" X 1'-4" BASE PLATE
(E) PERIMETER BEAM
PL12/ "X10" X 2'-4" MIN LOWER PLATE
THERE IS BEARING ON (5) FLUTES MINIMUM.
PLATE & ADJUST PLACEMENT SO THAT
PROVIDE LONG-SLOTTED HOLES IN LOWER
BEARING
112/ "
1'-2"
612/ "612/ "
HR
FAN ROOM
RA02
ELEVATOR
MACHINE RM
RA01
ELEVATED PENTHOUSE
RB01
FAN ROOM
RB02
EXISTING PARAPET 18"
@ ROOF EDGE
GI101A
GI101D
GI101B
1 1
AD201B
AE201B
AD201A
AE201A
GI101C
1 1
AD201C
AE201C
AD201D
AE201D
(FOR REFERENCE ONLY; NO WORK REQUIRED; EXISTING
GUARDRAIL MEETS FALL PROTECTION REQUIREMENTS)
132132
This is the start of the file's text. The full file is on GovTribe.