This is an amendment to a solicitation seeking proposals for a temporary boiler at the VA Sierra Nevada Health Care System in Reno, Nevada. The Department of Veterans Affairs is soliciting proposals to furnish, install, and maintain a temporary boiler for one year to address urgent needs. Proposals are due by December 12, 2023 at 10:00 AM Pacific Time. Offerors should include the cost to remove the boiler at the end of the one year period in their price proposals. Proposals will be evaluated based on technical requirements, past performance, and price, with technical and past performance being more important than price. Three references and evidence of past performance from the last three years must be included.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26124R0015 Temporary Boiler
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
654-24-1-6090-0050
N/A 3C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597
36C261 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597 To all Offerors/Bidders
36C26124R0015 11-29-2023
X
X
December 12, 2023 at 10:00 AM Pacific
654-24-1-6090-0050
The purpose of this amendment is to provide responses to request for informatin (RFI) too add evaluation factors at page 2 and to extend the closing date to December 12, 2023 at 10:00 AM Pacific Time.
All other terms and conditions remain unchanged.
RFI NO. 1 Should we include in our prposal the cost to remove the boiler at the end of the one year period.
Response: Yes, please include removal costs.
CHaree Harris Contracting Officer NCO 21
Offers will be evaluated based on a comparative analysis as follows:
1. Factor 1 - Technical Requirements
a. Demonstrate how offeror will provide comprehensive specialized experience and technical competence in the type of work required, as specified in the Statement of Work and Specifications provided.
b. Demonstrate specific experience and professional qualifications of personnel proposed for assignment to this project.
c. Demonstrate capacity to accomplish the work in the required time. This requirement is urgent and should be installed in 30 days or less.
2. Factor 2 - Past Performance
a. Contractor shall provide three references of past performance of the same or similar type of service within the last 3 years from date of solicitation (references shall be submitted with proposal).
b. Past performance will be assessed through checks in CPARS and PPIRS as well as reviewing provided references. Lack of recent and relevant past performance that is similar in complexity and magnitude to this solicitation will be evaluated as neutral.
3. Factor 3 – Price
a. The price proposal will be evaluated using Price Schedule submitted by offerors. Price shall be evaluated for reasonableness.
Technical and Past Performance, when combined, are more important than price.