This sources sought notice requests capability information from interested parties for a fiber optics replacement project at the Veterans Affairs Palo Alto Health Care System located in Menlo Park, California. The project involves installing approximately 1500 feet of 24-strand single mode fiber optic cable for the main run between buildings 334 and 331, as well as shorter runs between building 331 and buildings B, C, and D. Interested parties are requested to provide general experience and technical background, anticipated teaming arrangements, and details of similar past projects by November 8, 2023. The resulting task order will be awarded to one of the multiple award construction contract holders listed for a project magnitude between $25,000 and $100,000.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Fiber Optics Replacement

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
89086
SOLICITATION NUMBER*
36C26124R0013
RESPONSE DATE/TIME/ZONE
11-08-2023 15:00 PACIFIC TIME, LOS ANGELES, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J061
NAICS CODE*
236220
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 21 VA Southern Nevada Healthcare System 6900 N. Pecos Road, Building 6 North Las Vegas NV 89086

POINT OF CONTACT*

Contract Specialist Alex Hernandez Alex.Hernandez@va.gov

PLACE OF PERFORMANCE

ADDRESS
VA Palo Alto Health Care System

795 Willow Road, Bldg. 331 and 334

Menlo Park CA

POSTAL CODE
94025
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Description

NCO 21 MACC

GROUP 1

SOURCES SOUGHT

VA Palo Alto Health Care System : Fiber Optic Replacement

PLACE OF PERFORMANCE

VA Palo Alto Health Care System 795 Willow Road Building Bldg. 331 and 334 Menlo Park, CA 94025

NOTICE TO VETERANS INTGRATED SERVICE NETWORK 21 (VISN 21)

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) HOLDERS

DESCRIPTION

SOURCES SOUGHT NOTICE No Solicitation is currently available. This sources sought notice is for Market Research purposes only. All information contained herein is preliminary, and subject to changes and/or cancellation at the discretion of the Government. Interested vendors shall provide responses to this notice voluntarily, and at no cost to the Government. The information requested will be used solely within the Department of Veterans Affairs to facilitate decision making and will not be disclosed outside of the Government. Based upon information received in response to this Sources Sought Notice, the Government shall make a determination on a procurement strategy, which shall include the type of small business set-aside, if appropriate. The eventual procurement strategy and set-aside, if appropriate, is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) Code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $45.0M Project magnitude is anticipated less than $100,000. Potential Offerors must be registered in the System for Award Management (SAM) to be eligible for an award (See https://www.sam.gov/SAM/pages/public/index.jsf ). Potential Offerors must also have a current Online Representations and Certification Application on file with SAM. Service-Disabled Veteran-Owned Small Businesses and Veteran-Owned Small Businesses shall have their ownership and control verified by the Department of Veterans Affairs (VA) and be listed in the Vendor Information Pages (VIP) at https://vetbiz.va.gov/vip/. Description of Services is to install fiber optic utilities replacements located at Bldg. 331 and 334 for the Veterans Affairs Palo Alto Health Care System (VAPAHCS), 795 Willow Road; Menlo Park, CA 94025. The Government requests that interested parties review the Description of Services and provide the following capability information to the Contracting Specialist, Alex Hernandez at Alex.Hernandez@va.gov, by 3:00 PM PST on November 8, 2023. Include general information and technical background describing your firm's experience on contracts requiring similar efforts to meet the program objectives. Anticipated Teaming Arrangements (if any). List of Projects (Government and Commercial) that are similar is scope and size. The Government requests that interested party submissions in response to this source sought notice be no more than 10 single-sided, type-written pages using Times New Roman 12-point font or larger. Published literature may be any number of pages. The Government will use this information when determining its business type decision. This Sources Sought Notice is not to be construed as a commitment by the Government. No contract will be awarded as a direct result of this announcement.

Point of Contact: Alex Hernandez; Alex.Hernandez@va.gov

Project Title: VA Palo Alto Health Care System- Fiber Optic Replacement

Project specifications and all associated project documents shall be incorporated into the Task Order Offer Request which shall be posted electronically through https://sam.gov

Magnitude of Construction: Between $25,000 and $100,000.00

Please respond if you’re interested in this project no later than November 8, 2023 at 3:00 pm (PST)

Questions regarding this notice shall be submitted via e-mail to: Alex.Hernandez@va.gov.

The following firms are eligible for award of the resulting task order:

MACC GROUP 1

Acierto, LLC
Patriot Construction
2053 North 2000 West
4646 Qantas Lane
Farr West, UT 84404
Stockton, CA 95206
Anchor 41 Construction
Sentinel Builders, LLC
310 Murray Avenue
5945 Los Altos Parkway
Visalia, CA 93291
Sparks, NV 89436
Ayko Group, LLC
Sergent Mechanical
95-1238 Wikao
1617 Pacific Avenue
Mililani, HI 96789
Oxnard, CA 93033
Bexar Advanced Solutions Group
Strategic Industry
47 E. Crestwood Road
1440 Draper Street
Kaysville, UT 84037
Kingsburg, CA 93631
Centerpoint Services, Inc.
Talion Construction
351 Cypress Drive
819 Moowaa Street, Suite 209
Lake Havasu City, AZ 86406
Honolulu, HI 96817
Hawk Contracting Group LLC
West Point Contractors, Inc.
P.O. Box 490
2915 E. Weiding Road
Montrose, CO 81402
Tucson, AZ 85706

Sources Sought Notice **Any offers received from contractors not mentioned above will not be accepted.

*= Required Field
Sources Sought Notice

Sources Sought Notice

Fiber Optics Replacement

DESCRIPTION, SPECIFICATIONS AND WORK STATEMENT

640-24-1-5281-0003

1.0 General Intent

1.1 The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install fiber optic utilities replacements located at Bldg. 331 and 334 for the Veterans Affairs Palo Alto Health Care System (VAPAHCS), 795 Willow Road; Menlo Park, CA 94025.

1.2 The contractor must perform to the standards in this contract. This project shall take no longer than 30 calendar days from the notice to proceed to complete.

1.3 This project shall be coordinated with the appointed Contracting Officer Representative (COR) to insure minimal impact to resident’s day to day activities and minimal noise. Scheduling of work shall be at the convenience of the VAPAHCS.

2.0 General Information and Requirements

2.1 The objective of this project is to remove the damaged fiber optic cables from Bldg 331 Rm A104A to Bldg 334 Rm 106 and the subsequent IDF closets in each of the following wings, B, C, and D.

2.2 The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project as deemed by industry standards, this SOW, all related specifications, applicable code requirements, and site policy.

2.3 The contractor shall provide daily cleanup and securing of work site, including securing tools and equipment. Disposal of all waste and debris is at the contractor’s own expense.

2.4 The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.

2.5 All work shall be coordinated with the COR assigned to this project and only commence once approved.

2.6 Badges: Contractor will obtain required ID badges for all employees used on project at start of each workday; Report the COR for escort to the station police service for sign in and badge issuance.

2.7 Security: The contractor and their personnel shall be subject to the same Federal laws, regulations, standards, and VA policies as VA personnel regarding information and information system security.

2.8 Schedule: Normal work hours will be 8:00am – 4:30 pm Monday-Friday excluding Government holidays unless otherwise approved by the COR. It is the intent of the Palo Alto VA Medical Center that the work is to be completed within 30 calendar days from the issuance of the Notice to Proceed (NTP). Any request to utility shutdowns must be requested in writing at a minimum of 30 days prior to the requested day of shutdown.

2.9 Training: All employees of general contractor or subcontractors shall have the 10-hour or 30-hour OSHA Construction Safety course, confined space training, low voltage communication certification and other relevant competency training, as determined by RE/COR acting as the Construction Safety Officer with input from the facility Construction Safety Committee.

2.10 Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, Lock-out-Tag-out, Rules of Station, NFPA, and etcetera. In the event that any code/standard is found to be contradictory; the authority having jurisdiction (COR) shall make the final determination and work shall proceed at no additional cost to the Government.

3.0 Specific Tasks

3.1 The contractor shall provide all supervision, administrative and technical support, labor, subcontractors, tools, transportation, materials, supplies and equipment. The contractor shall plan, schedule, and ensure effective completion of the replacement of the fiber optic run for bldg.331 to bldg.334.

3.2 The contractor will coordinate work with onsite Engineering and OI&T personnel.

3.3 The contractor will construct a safety barrier around the demolition site

3.4 The contractor will Prep all areas for work including any protective equipment as necessary

3.5 The contractor will coordinate with the COR to obtain any required confined space permits for entry into any underground communication vaults.

3.6 The contractor will coordinate with the COR to schedule any road closures needed to access communication vaults.

3.7 The contractor will Source and supply Approximately 1500’ of 24 strands of Single mode (SM) OS2 Outside Plant (OSP Backbone) fiber Optic cable for the main run from Bldg 334 Rm 106 To Bldg 331 Rm A104A. All fiber optic strands will be terminated with LC connectors in new rack mounted fiber trays provided by the contractor.

3.8 The contractor will source and supply Approximately 320’ 12 strands each SM OS1 Fiber for run from Bldg 331 Rm A104A to Bldg 331 Rm B161. All fiber optic strands will be terminated with LC connectors in new rack mounted fiber trays provided by the contractor.

3.9 The contractor will source and supply Approximately 384’ 12 strands each SM OS1 Fiber for run from Bldg 331 Rm A104A to Bldg 331 Rm C161. All fiber optic strands will be terminated with LC connectors in new rack mounted fiber trays provided by the contractor.

3.10 The contractor will source and supply Approximately 272’ 12 strands each SM OS1 Fiber for run from Bldg 331 Rm A104A to Bldg 331 Rm D161. All fiber optic strands will be terminated with LC connectors in new rack mounted fiber trays provided by the contractor.

3.11 The contractor will conduct tests on each of the newly installed fiber optic strands to meet Performance Specifications, Laser Optimized 9/125 µm with effective modal bandwidth of at least 850 MHz∙km at 1310 nm

3.12 The contractor will provide a 10-foot service loop of excess fiber optic cable at each termination point.

3.13 The contractor will provide a 20-foot service loop in each underground communication vault.

3.14 The contractor shall fire caulk any and all penetrations through fire walls and seal conduits with NFPA rated/approved pipe and penetration sealant.

3.15 The contractor will provide Test results in writing before the VA accepts and signs off on the job.

3.16 The contractor will remove all building material from site and discard in a safe manner at the contractor’s expense.

3.17 The contractor will clean building site and remove all safety barriers at the end of this project.

3.18 The contractor will provide written reports on all work completed.

4.0 Technical Exhibits

4.3 – Specifications (see attached, listed below) Section 01 00 00 GENERAL REQUIREMENTS.

Section 01 35 26 SAFETY REQUIREMENTS.

Section 27 10 00 CONTROL, COMMUNICATION AND SIGNAL WIRING Section 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS Section 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS Section 27 05 33 RACEWAYS AND BOXES FOR COMMUICAITONS SYSTEMS Section 27 11 00 TELECOMMUNICATIONS ROOM FITTINGS

Page 1 of Page 1 of

Page 1 of Page 1 of

File details come from the government source that posted it. Updated .