This document is a presolicitation notice calling for SF 330 submissions for architect-engineering services to update the facility master plan at the Veterans Affairs Southern Nevada Healthcare System campus. The contractor will be required to perform master planning through community engagement, data gathering, and investigative services to assess approximately 1 million square feet of existing facilities and 1 million square feet of proposed new construction and renovations. The response deadline is May 5, 2023 at 2:00 pm Pacific time. The contract is set aside for SDVOSBC firms and has a NAICS code of 541330. The estimated date of award is by September 29, 2023. The notice requests relevant past project examples and clarifies that certain investigative tasks may require physical presence on site while other activities can be completed remotely.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 5-5-2023 -- 36C26123R0057_5th Revision.docx | DOCX document | |
| 4-24-23 - 36C26123R0057_4th Revised Call for 330s.docx | DOCX document | |
| 36C26123R0057_ Revised Call for SF 330s.docx | DOCX document | |
| 36C26123R0057.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presolicitation Notice Presolicitation Notice
| SUBJECT* |
| Call for SF 330s - A-E Master Planning - Update Facility Master Plan | 593-23-2-5927-0001 | 593-23-305 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 94304 |
| SOLICITATION NUMBER* |
| 36C26123R0057 |
| RESPONSE DATE/TIME/ZONE |
| 05-05-2023 2:00 pm PACIFIC TIME, LOS ANGELES, USA |
| ARCHIVE |
| 99 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| C1DA |
| NAICS CODE* |
| 541330 |
| PLACE OF PERFORMANCE |
| Veterans Affairs Southern Nevada Healthcare System |
6900 North Pecos Road
Las Vegas NV
| POSTAL CODE |
| 89086 |
COUNTRY
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
VA Sierra Pacific Network (VISN 21) Network Contracting Office 21 (NCO 21) 711 Kapiolani Blvd Suite 200 Fresno CA 93721
POINT OF CONTACT*
Contract Specialist Carla Groves carla.groves@va.gov
(808) 539-1310
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
RFI Response for Call for SF 330s. Please read the entire document.
RFI Responses for 36C26123R0057
1. What are the specific required positions for the personnel?
a. The contractor should refer to the SOW and provide the appropriate personnel that can perform the requirement to its entirety and successfully.
2. How many relevant projects should be presented?
a. Number of relevant projects will be based on findings from developing the Master Plan through charettes, reviews, investigative services, and data gatherings.
3. What is the approximate sq. ft. for the proposed masterplan?
a. Approximate Sq.Ft. is 1M for new constructions and renovated square footage will be dependent on master plan findings relative to service’s needs, relocation, space planning, etc.
4. What percentage constitutes existing bldgs. vs. new or proposed facilities?
a. Existing buildings total gross square footage is approximately 1,042,333 encompassing 10 total buildings and new proposed facilities is 1M.
5. Can this work be performed remotely for all disciplines?
a. Refer to Section IV – Review Requirements Time Frame for activities that are required to be completed via teleconference and In-Person. Additionally, for investigative services, data gatherings and necessary interviews with customers and stakeholders, the VA strongly prefers that contractor is physically present on site.
6. Should specific disciplines be located physically on-site, and if yes, please clarify exactly which ones?
a. If contractor finds it necessary for certain disciplines to be on site to facilitate planning efforts, VA will work to accommodate.
7. I was hoping to obtain the estimated construction cost of the project listed above. Is there a cost estimate, budget or ballpark figure for the [construction] project listed?
a. This project is to Update Facility Master Plan which is Architect-Engineering services not a construction service.
8. Is there an actual start date for the project?
a. Estimated Date of Award of the A-E Contract: By September 29, 2023
| *=Required Field |