36C26123R0019_1.docx
DOCX document 39 KB Posted
- Solicitation number
- 36C26123R0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01 32 16 - Project Schedules.docx | DOCX document | |
| 01 35 26 - Safety Requirements.docx | DOCX document | |
| Manual VA Handbook 0730-4.pdf | ||
| 02 41 00 - Demolition.docx | DOCX document | |
| Physical Security Resiliency Design Manual.pdf | ||
| 01 45 00 - Quality Control Section.docx | DOCX document | |
| 01 00 00 - General Requirements.docx | DOCX document | |
| 01 42 19 - Reference Standards.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26123R0019 Attachments
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26123R0019 X 02-21-2023 640-23-911 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu
HI
96813 Department of Veterans Affairs
NETWORK CONTRACTING OFFICE (NCO21)
VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu
HI
96813 Craig Armstrong 808-835-9686
Provide all personnel, equipment, tools, materials, supervision, and other items and services necessary for the Whistle Stop Daycare window screen installation.
Place of Performance: 3801 Miranda Ave. Palo Alto, CA 94304
NAICS: 236220 (Commercial and Institutional Building Construction - $39.5M)
This procurement has been 100% set aside for SDVOSB under the VISN 21 MACC Group 1
Offers shall be valid for at least 30 days.
Site Visit Information: Monday February 27, 2023 at 3801 Miranda Ave Palo Alto, CA 94304 Building 6 POC for site visit is Mr. Anthony St. John 209-597-7008
X 52.211-10 X 10:00
PDT
03-20-2023 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 711 Kapiolani Blvd Suite 200 Honolulu
HI
96813 Department of Veterans Affairs FMS VA-9(101) Financial Services Center PO Box 149971 Austin
TX
78714-9971 866-372-1141 vafscenterprisesupport@va
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 4 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 7 |
| 2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 9 |
| 2.2 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN 2020) | 9 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
Whistle Stop Daycare Window Screen Install Project #640-23-911 Department of Veterans Affairs Palo Alto VAMC
Statement of Work (SOW)
1.0 General Intent
1.1 The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to install window screens at Whistle Stop Day Care located at 3801 Miranda Ave. Palo Alto, CA 94304.
1.2 The contractor must perform to the standards in this contract. This project shall take no longer than 30 calendar days (Period of Performance) from the notice to proceed to complete.
1.3 This project shall be coordinated with the appointed COR to insure minimal impact to resident’s day to day activities and minimal noise. Scheduling of work shall be at the convenience of the VAPAHCS.
2.0 General Information and Requirements
2.1 The objective of this project is to repair Whistle Stop windows located at 3801 Miranda Ave. Palo Alto, CA 94304.
2.2 The contractor shall provide operation and maintenance instructions, and manufacturer documentation at the completion of the project. Manufacturer documentation and maintenance schedule to be provided in close out documents.
2.3 The contractor shall provide a one-year full parts and labor warranty on the newly installed window screens in addition to the manufacturer’s warranty.
2.4 The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project as deemed by industry standards, this SOW, all related specifications, applicable code requirements, and site policy.
2.5 The contractor shall provide daily cleanup and securing of work site, including securing tools and equipment. Disposal of all waste and debris is at the contractor’s own expense.
2.6 The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.
2.7 All work shall be coordinated with the COR assigned to this project and only commence once approved.
2.8 Badges: Contractor will obtain required ID badges for all employees used on project at start of each workday; report the COR for escort to the station police service for sign in and badge issuance.
2.9 Security: The contractor and their personnel shall be subject to the same Federal laws, regulations, standards, and VA policies as VA personnel regarding information and information system security.
2.10 Schedule: Normal work hours will be 8:00 am – 4:30 pm PST Monday-Friday excluding Government holidays unless otherwise approved by the COR. It is the intent of the Palo Alto VA Medical Center that the work is to be completed within 30 calendar days from the issuance of the Notice to Proceed (NTP).
2.11 Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, Lock-out-Tag-out, Rules of Station, NFPA, and etcetera. If any code/standard is found to be contradictory; the authority having jurisdiction (COR) shall make the final determination and work shall proceed at no additional cost to the Government.
3.0 Specific Tasks
3.1 The contractor shall provide all supervision, administrative and technical support, labor, subcontractors, tools, transportation, materials, supplies and equipment. The contractor shall plan, schedule, and ensure effective completion of the Whistle Stop 30 window screen installations.
3.2 The contractors will install the following windows with required specification for stainless steel security mesh according to the Physical Security Resiliency Design Manual VA Handbook 0730/4.
Windows - Qty. 25 - Size 48x48
1. The contractor will clean and prep area around window outside.
2. The contractor will install #304 stainless steel woven mesh 0.7 mm (.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per linear inch).
3. The contractor will ensure the mesh is 12x12 per 25 mm (1 in.) with main and sub frames of 2.7 mm (12 gauges) carbon steel with baked enamel finish and internal key locking slide bolts.
Windows - Qty. 3 – Size 35 ¼ x 35 ¼
1. The contractor will clean and prep area around window outside.
2. The contractor will install #304 stainless steel woven mesh 0.7 mm (.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per linear inch).
3. The contractor will ensure the mesh is 12x12 per 25 mm (1 in.) with main and sub frames of 2.7 mm (12 gauges) carbon steel with baked enamel finish and internal key locking slide bolts.
Windows - Qty. 2 - Size 23 ¼ by 35 ¼
1. The contractor will clean and prep area around window outside.
2. The contractor will install #304 stainless steel woven mesh 0.7 mm (.028 in.) wire diameter, with tensile strength of 15 kg/mm (800 pounds per linear inch).
3. The contractor will ensure the mesh is 12x12 per 25 mm (1 in.) with main and sub frames of 2.7 mm (12 gauges) carbon steel with baked enamel finish and internal key locking slide bolts.
4.0 Technical Exhibits
4.1 – Specifications (see attached, listed below)
1. 01 00 00 GENERAL REQUIREMENTS
2. 01 32 16 PROJECT SCHEDULES
3. 01 42 19 REFERENCE STANDARDS
4. 01 45 00 QUALITY CONTROL SECTION
5. 01 35 26 SAFETY REQUIREMENTS
6. 02 41 00 DEMOLITION
7. MANUALVA HANDBOOK 0730-4
8. PHYSICAL SECURITY RESILIENCY DESIGN MANUAL
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
OFFER SUBMISSION:
The following documents are to be included in the solicitation submission:
1. One (1) Fully completed and signed SF 1442 Offer Page with amount entered in block 17 and
2. Acknowledgment of all amendments either by entering data in block 19 of the SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF 1442 Offer page.
OFFERS ARE TO BE SENT TO:
One (1) electronic copy via email of the price offer are to be sent to arrive on or before the due date/time at the following email address:
Offers have been authorized and are to be sent by email to Craig Armstrong at craig.armstrong2@va.gov.
Solicitation number and title must be in the title of the email. Faxed quotations are not permitted under any circumstances.
Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for quotation will result in a nonresponsive quotation.
REQUESTS FOR INFORMATION (RFI):
To obtain clarifications and/or additional information concerning the contract requirements or specifications, submit a written RFI sent via email to craig.armstrong2@va.gov.
RFI responses will be responded to as necessary in amendment format, which will posted/e-mailed to all concerned.
Deadline for submission of RFIs for this solicitation is Friday March 3, 2023 at 10:00 am PST. No questions will be answered after this date/time unless determined to be in the best interest of the Government as determined by the Contracting Officer. Telephone requests for information will not be accepted or returned.
OFFER DUE DATE SCHEDULE:
All offers with the electronic copy are due by the date and time set for the receipt of offers shown in Block 13 of the SF 1442.
INSTRUCTIONS TO OFFERORS:
Offers received after Monday March 20, 2023, at 10:00 am PST may be rejected.
Any exception to the terms and conditions of this solicitation will result in a nonresponsive offer.
Failure to provide a definitive price or conditioned price will result in a nonresponsive quotation. Receipt of an Offer must be in accordance with terms and conditions of this solicitation. Offerors must acknowledge (in writing only) amendments to this solicitation, otherwise an offer may be determined nonresponsive.
The apparent successful offeror must be determined as “responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.
2.1 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for— Monday February 27, 2023 at 10:00 AM PST
(c) Participants will meet at— 3801 Miranda Ave. Palo Alto, CA 94304 Building 6 (End of Provision)
2.2 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN 2020)
(a) Definitions. As used in this clause— "Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is valued at or below the threshold specified in Federal Acquisition Regulation 28.102–1(a) on the date of award of this contract, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection.
(i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the:
| U.S. Department of Treasury |
| Financial Management Service |
| Surety Bond Branch |
| 3700 East West Highway, Room 6F01 |
| Hyattsville, MD 20782. |
| Or via the internet at http://www.fms.treas.gov/c570/. |
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
(End of Clause)
TDM, VAPAHCS M&R
| FAR Number |
| Title |
| Date |
| 52.236-26 |
| PRECONSTRUCTION CONFERENCE |
| FEB 1995 |
See attached document: Manual VA Handbook 0730-4.
See attached document: 01 45 00 - Quality Control Section.
See attached document: 01 35 26 - Safety Requirements.
See attached document: 01 00 00 - General Requirements.
See attached document: Physical Security Resiliency Design Manual.
See attached document: 02 41 00 - Demolition.
See attached document: 01 42 19 - Reference Standards.
See attached document: 01 32 16 - Project Schedules.
File details come from the government source that posted it. Updated .