36C26122R0025.docx

DOCX document 28 KB Posted

Attached to
Purchase and Install Transformer Federal contract opportunity
Solicitation number
36C26122R0025
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

View the file

Other files for this federal contract opportunity

Other files attached to Purchase and Install Transformer, newest first.
File Type Posted
EPODUTR006.pdf PDF
Sources Sought Form Transformer.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW COMMUNITY

SUBJECT*
Emergency Temp Transformer BLDG 1 36C261-22-AP-2019

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
89502-2597
SOLICITATION NUMBER*
36C26122R0025
RESPONSE DATE/TIME/ZONE
01-04-2022 10:00
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
N061
NAICS CODE*
334416
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Health Care System 975 Kirman Avenue Reno NV 89502-2597

POINT OF CONTACT*

Charee Harris charee.harris@va.gov 775-788-5511

PLACE OF PERFORMANCE

ADDRESS
VA Sierra Nevada Healthcare System

975 Kirman Avenue

Reno Nevada

POSTAL CODE
89502
COUNTRY
U.S.A

ADDITIONAL INFORMATION

AGENCY’S URL
https://sam.gov
URL DESCRIPTION
Purchase and Install mobile Transformer
AGENCY CONTACT’S EMAIL ADDRESS
charee.harris@va.gov
EMAIL DESCRIPTION
Purchase and Install mobile transformer

Sources Sought Notice Sources Sought Notice

DESCRIPTION

*= Required Field
Sources Sought Notice

Sources Sought Notice

This is a sources sought for an emergency purchase and install of a mobile transformer, which will serve as a redundancy/backup capacity. The Prime firm shall have available inventory for immediate installation in accordance with the statement of work below.

Interested parties are advised that in keeping with the Veterans First Contracting program under 38 U.S.C. 8127-8128, as implemented under VA Acquisition Regulation (VAAR) subpart 819.70 and VA Procurement Policy Memorandum 2016-05 – Implementation of the Veterans First Contracting Program, if the Contracting Officer has a reasonable expectation that two or more small business concerns owned and controlled by Service-disabled veteran-owned small business (SDVOSB) concerns will submit responses to the solicitation and that award can be made at a fair and reasonable price that offers the best value to the United States, the requirement will be set-aside for SDVOSB concerns. If an SDVOSB set-aside is not appropriate, the requirement will be evaluated to determine whether a Veteran Owned Small Business (VOSB) set-aside is appropriate. The term SDVOSB / VOSB under the Veterans First Contracting program has the same meaning as defined in FAR subpart 2.101, except for acquisitions authorized by 38 U.S.C. 8127 and 8128 for the Veterans First Contracting Program SDVOSB and VOSB concerns must be listed as verified in the Vendor Information Pages (VIP) database at https://www.vip.vetbiz.gov in addition to meeting the NAICS code small business size standard to be eligible for award under Veterans First Contracting Program set-asides.

Interested parties are encouraged to provide capability information to the Contracting Officer, Charee Harris, on the attached form, via email charee.harris@va.gov by 1:00 P.M. Pacific Standard Time on January 4, 2022.

STATEMENT OF WORK

GENERAL

Provide professional construction services to deliver and place temporary 500kVA pad-mounted transformer (24.9kV to 208V) to address emergency situation at the VA Reno hospital facility. Primary and secondary cables are to be provided and installed.

The work will include all equipment and labor to have a fully functioning system.

The Contractor shall furnish all services, materials, testing, equipment, and supervision as required in connection with this Statement of Work.

SCOPE

The general scope of this work is to include all material, labor and oversight in order to install a functioning complete system.

3. ADMINISTRATIVE

3.1. Schedule. It is the intent of the Reno VA that this work be accomplished as soon as possible. Work hours to be scheduled with VA Reno. Facility interruptions shall not last longer the 8 hours. All outages affecting hospital operations must be accomplished after normal work hours (normal work hours are Monday-Friday, 7:00 AM - 7:00 PM) or on a Saturday from 6am to 3pm.

3.2. Proposal. The Contractor shall thoroughly review the scope. The proposal shall be prepared to reflect all work required to provide a complete system. The contractor’s proposal will list the breakdown of all materials and labor and time required to complete the above-mentioned work.

See attached document: Sources Sought Form Transformer.

See attached document: EPODUTR006.

Page 1 of

File details come from the government source that posted it. Updated .