5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) none
612MCP
Department of Veterans Affairs Network Contracting Office (NCO) 21 VA Northern California HealthCare System 5342 Dudley Blvd, Bldg 209 McClellan CA 95652-2609
612MCP
Department of Veterans Affairs Network Contracting Office (NCO)21 VA Northern California HealthCare System 3230 Peacekeeper Way, Bldg. 209 McClellan CA 95652-1012 To all Offerors/Bidders
36C26122Q0210 01-21-2022
X
N/A
THE PURPOSE OF THIS AMENDMENT IS TO REVISE THE STATEMENT OF WORK FOR THIS SOLICITATION.
ALL TERMS AND CONDITIONS REMAIN THE SAME FOR THIS SOLICITATION.
JOHN DA SILVA
Scope of Work
1.0 General Intent
1.1 The contractor must provide up to 15 personnel with, equipment, tools, materials, supervision, and other items and services necessary to provide (4) day AC&R/Boiler/Hot Water Heater Maintenance training located at Bldg. 6 located at 3801 Miranda Ave. Palo Alto, CA 94304.
1.2 The contractor must perform to the standards in this contract. This project shall take no longer than 15 calendar days from the notice to proceed to complete.
1.3 This project shall be coordinated with the appointed COR to insure minimal impact to resident’s day to day activities and minimal noise. Scheduling of work shall be at the convenience of the VAPAHCS.
2.0 General Information and Requirements
2.1 The objective of this project is to provide to provide (4) day AC&R/Boiler/Hot Water heater Maintenance training located at Bldg. 6 located at 3801 Miranda Ave. Palo Alto, CA 94304.
2.2 The contractor shall provide operation and maintenance instructions, and manufacturer documentation at the completion of the project. Manufacturer documentation and maintenance schedule to be provided in close out documents.
2.3 The contractor shall provide all tools, equipment, and personal protective equipment necessary to complete this project as deemed by industry standards, this SOW, all related specifications, applicable code requirements, and site policy.
2.4 The contractor shall provide daily cleanup and securing of work site, including securing tools and equipment. Disposal of all waste and debris is at the contractor’s own expense.
2.5 The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses.
2.6 All work shall be coordinated with the COR assigned to this project and only commence once approved.
2.7 Badges: Contractor will obtain required ID badges for all employees used on project at start of each workday; Report the COR for escort to the station police service for sign in and badge issuance.
2.8 Security: The contractor and their personnel shall be subject to the same Federal laws, regulations, standards, and VA policies as VA personnel regarding information and information system security.
2.9 Schedule: Normal work hours will be 8:00am – 4:30 pm Monday-Friday excluding Government holidays unless otherwise approved by the COR. It is the intent of the Palo Alto VA Medical Center that the work is to be completed within 15 calendar days from the issuance of the Notice to Proceed (NTP). Any request to utility shutdowns must be requested in writing at a minimum of 21 days prior to the requested day of shutdown.
2.10 Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, Lock-out-Tag-out, Rules of Station, NFPA, and etcetera. If any code/standard is found to be contradictory; the authority having jurisdiction (COR) shall make the final determination and work shall proceed at no additional cost to the Government.
3.0 Specific Tasks
3.1 The contractor shall provide all supervision, administrative and technical support, labor, subcontractors, tools, transportation, materials, supplies and equipment. The contractor shall plan, schedule, and ensure effective completion of (4) day course for Basic Electricity and Electrical Troubleshooting and Maintenance for up to 15 people.
3.2 The contractor will supply (2) training that will consist of the following:
Boiler/ Hot Water Heater Operation, Maintenance, & Safety
Course Description
This Boiler/ Hot Water Heater Operation, Maintenance, & Safety training seminar was designed to take the mystery out of wondering if your boiler is safe and operating efficiently, and provides maintenance technicians and others the confidence and comfort level needed for operating and maintaining their boilers. for the novice technician needing a well-rounded education and the experienced stationary engineer who needs a refresher course for continuing education, this training program provides a no-nonsense, practical and real world approach for boiler/ Hot water heaters.
operation, maintenance, and safety. Overall, this program is designed to extend boiler life, improve boiler efficiency, and save energy costs for the employer, while establishing a culture of safe work practices among the employees.
CEUs: 1.6 Length: 2-Days Workshop Option This course can be combined with our ‘Air Conditioning & Refrigeration’ for a complete 4-Day workshop.
Air Conditioning & Refrigeration
Course Description
Being able to understand, operate, maintain, and troubleshoot your own air conditioning system is what this HVAC course is all about. It was created to bring students up to speed in their skills and knowledge as quickly and safely as possible. Taught by instructors who have been in the technicians’ shoes, the practical, commonsense approach we take in presenting this course makes it perfect for novice technicians and experienced HVAC technicians alike. This air conditioning and refrigeration training course is designed for anyone who needs to understand basic operation, maintenance, and troubleshooting of air conditioning and refrigeration systems in order to improve efficiencies and uptime in commercial, industrial, or residential locations.
CEUs: 1.6 Length: 2-Days Workshop Option This course can be combined with our ‘Basic Electricity for the Non-Electrician’ for a complete 4-Day workshop.
See attached document: Wage Determination 2015-5641.
A.1 52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)
The Government will evaluate offers for award purposes by including only the price for the basic requirement; i.e., options will not be included in the evaluation for award purposes.
(End of Provision) A.2 52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988) Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.
(End of Provision)
A.3 52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
(End of Provision)