36C26120Q0391-001.docx

DOCX document Posted

Attached to
H246--Legionella Testing of Potable Water and Cooling Towers Testing
Solicitation number
36C26120Q0391
Issued by

About this file

This performance work statement outlines requirements for Legionella testing services of potable water and cooling towers at three Veteran's Affairs medical campuses in California. The contractor shall collect quarterly water samples from specified buildings and locations at the Palo Alto, Menlo Park, and Livermore campuses, conducting on-site field testing and shipping samples to an accredited laboratory for analysis. Laboratory testing must be performed by a CDC Elite certified lab with experience in environmental testing. The contractor must submit chain of custody records, laboratory results, and quarterly and annual summary reports within five days of completion. Starting in option year one, monthly Legionella testing is also required of all cooling towers at the three campuses. The period of performance is from May 2020 through April 2021 with four optional yearly extensions.

36C26120Q0391 P09 - SOW.docx

View the file

Other files

File Type Posted
36C26120Q0391-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement Veteran’s Affairs Palo Alto Health Care System Legionella Testing of Potable Water and Cooling Towers

1.0 GENERAL INFORMATION

1.1 This Performance Work Statement (PWS) is to obtain Veteran’s Health Administration (VHA) Directive 1061 Legionella Disease and Scald Injury Prevention compliant sampling and testing services, at the Veteran’s Affairs Palo Alto Health Care System (VAPAHCS). *Base year shall be limited to domestic water systems, option years 1 through 4 shall also include all cooling towers in the VAPAHCS inventory.

1.2 The Contractor shall provide management, supervision, labor, parts, materials, tools, incidental engineering services, and transportation necessary to perform the services within this PWS. Modifications to perform deviations require written consent of the Government’s Contracting Officers Representative (COR) or COR designee.

1.3 Period of Performance: The Contract anticipated start date is May 1, 2020 through April 30, 2021 with 4 optional years based on performance. Option year 1 – 4 shall have additional scope requirements added to included Cooling tower water and lab testing services.

1.4 Schedule/Work Hours: Due to the time sensitive nature of water sample analysis, work is required to be conducted during business hours (M-TH 8am-5:00pm, excluding federal holidays). Recognized Holidays: Contractor is not required to perform services on holidays listed below.

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1.5 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

2.0 CONTRACTOR RESPONSIBILITIES:

Disclaimer: Work outside the scope of the contract shall not be performed unless authorized by the Contracting Officer (CO). The contractor shall communicate to the COR, immediately, the occurrence of any event that may require a contract modification. The contractor shall submit a written request for modification to the Contracting Officer and COR no more than 10 days from initial notification. No contract modification will be effective until the Contracting Officer has approved the modification, in writing, and the modification has been signed by both parties.

2.1 Quarterly Water Sampling and Field Testing

2.1.1 Contractor shall be responsible for procurement of collection containers that meet VHA 1061 directive requirements for Legionella sampling and testing.

2.1.2 Collect 383 Water samples (three decorative fountains included) with allowance 25 retests per quarter. Sampling quantities are listed below:

3801 Miranda Ave, Palo Alto, CA- 162 Tests
795 Willow Road, Menlo Park, CA- 201 Tests
4951 Arroyo Road, Livermore, CA- 20 Tests

2.1.3 At the time each water sample is taken, test and document water temperature, level of residual biocide, and pH.

2.1.4 Sampling shall be performed in accordance with VHA Directive 1061 and conducted in the months of February, May, August, and November.

2.1.5 Locations are listed in the SOW Addendums below under “Quarterly Water Sampling Locations”.

2.1.6-The Government reserves the right to add or subtract testing locations and not limited to the locations listed in addendum A.

2.1.7 The Government can negotiate an addition or subtraction of total sampling/testing with the Contractor based on the needs of the VAPAHCS system only executable by the authorization of the CO or CO designated party.

2.2 Shipping Samples to Laboratory and Lab Testing

2.21 Lab Testing shall be performed at a CDC Elite certified analytical laboratory with at least 5 years’ experience in environmental testing as stated in the VHA Directive 1061 requirements. (i.e. A2LA, NELAP accreditation).

2.2.2 The Contractor shall ensure that samples collected for laboratory analysis are maintained under positive control, have appropriate documented chain-of-custody, are packed in leak-proof containers, and are shipped overnight to the laboratory.

2.2.3 Samples shall arrive at the laboratory within two days of collection.

2.2.4 The contractor is responsible for any and all shipping/handling costs and materials.

2.3 Data Management and Reporting

2.3.1 Chain of Custody, Certified Laboratory Analysis, and Executive summary shall be type written and electronically submitted to the Engineering Compliance and other required recipients identified after award.

2.3.2 Chain of Custody shall provide all field obtained information, specific location information, and lab results. Only legible and type written reports will be accepted.

2.3.3 COR may make reasonable requests for hard copies as required and at no additional cost to the Government.

2.3.4 The contractor shall document all field test parameters, maintain sampling data electronically and in a format readily accessible.

2.3.5 If collection of samples and field testing occurs over more than one site visit per quarter, the contractor shall submit a quarterly summary report in addition to individual analysis reports.

2.3.6 The contractor shall submit an annual report summarizing the sample results over the previous four quarters of the fiscal year.

2.3.7 The contractor shall review the lab results and notify the VAPAHCS POCs immediately upon detectable legionella reported in the laboratory results by phone and email.

2.3.8 The contractor shall submit the reports within 5 days of lab testing completion.

2.4 Cooling Tower Legionella Testing

2.4.1 Monthly legionella testing will be performed at all cooling towers at Palo Alto, Livermore, and Menlo Park Divisions (see addendum B “Cooling Towers)

2.4.2 Testing results will be provided to the COR, COR alternatives, and Engineering Compliance Office.

2.4.3 Period of performance for this section of the contract will be begin in Option Year 1 (no later than May 1, 2021) through the remaining contract duration.

2.4.4 Contractor will notify individual HVAC supervisors at each station upon arrival for cooling tower sampling.

2.4.5 All sampling, field and lab testing, data management & reporting shall adhere to sections 2.1 through 2.3 requirements.

3.0 CONTRACTOR PERSONNEL REQUIREMENTS AND QUALIFICATIONS

3.1 The contractor must meet, at least, the minimal requirements for nationally-certified competency of microbial testing of potable and non-potable water sources in a hospital environment.

3.2 The contractor must be able to identify Legionella pneumophila and serotypes by standard microbiology methods.

3.3 The contractor shall have a minimum of 5 years in legionella sampling and testing in a hospital setting, testing staff shall have experience in microbial testing of potable water and are proficient at performing the culture of Legionella species from environmental samples. (NOTE: Rapid testing methods, such as polymerase chain reaction (PCR) and direct fluorescent antibody (DFA), are not recommended for the detection of Legionella in environmental water samples)

3.4 The contractor shall be accredited or certified in environmental testing (i.e. A2LA, NELAP accreditation) and CDC Elite.

4.0 IDENTIFICATION BADGES, PARKING, AND SMOKING POLICY

4.1 Contractor staff performing work in and around the hospital shall have easily identifiable uniforms and company logos. Contractors are required to obtain temporary badges from the VA Police desk prior to conducting sampling and testing.

4.2 Contractor staff shall adhere to all VA policies related to road, pedestrian, and smoking policies.

4.3 Contractor and Subcontractor personnel working on VAPAHCS facilities must consent to Background Checks or shall be denied access to the VAPAHCS facilities. Information required to conduct a Background Check includes: full name, driver’s license number and/or social security number, date of birth, and completion of a background check questionnaire.

4.4 Contractors shall ensure their employees and those of their Subcontractors have the proper credentials allowing them to work in the United States. The Contractor shall not be entitled to any compensation for delay or expenses associated with this requirement and are not excused from proceeding with the Contract.

4.5 Department of Veterans Affairs regulations requires Contractor employees to have a VAPAHCS issued Identification Badge and wear it at all times while at VAPAHCS facilities. ID badges shall be issued by the VAPAHCS security office under its rules for issuance. Contractor personnel shall present a neat appearance and be easily recognized as a Contractor employee by wearing distinctive clothing bearing the name of the company and a VAPAHCS issued ID badge. When an employee leaves the Contractor’s employment, or the Contract is terminated, the employee’s badge shall be returned to COR within 3 working days.

5.0 INJURY and ACCIDENT REPORTS

5.1 Contractor shall immediately report to the CO/COR in a manner and on the forms prescribed by the Government, accidents resulting in injury, trauma, death, hazardous exposures, and occupational disease occurred on the VAPAHCS campuses.

5.2 Written reports for incidents shall be provided within five (5) working days and include the cause, what, where, and when the incident occurred.

6.0 SAFETY

6.1 During contract performance, the Contractor shall follow Government’s safety policy and standards for safe work practices and take such safety precautions as the VAPAHCS Safety Officer or designee or the CO/COR may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contractor shall comply with VAPAHCS smoking policy.

6.2 Contractor shall adhere to OSHA, EPA, NFPA Life Safety Codes, and other regulatory requirements. Safety shall be the Contractor’s highest priority. The Contractor shall be solely responsible for compliance with (Federal) OSHA regulations.

ADDENDUM A: Quarterly Water Sampling Locations VA Palo Alto Medical Center, 3801 Miranda Avenue, Palo Alto, CA 94304

Building MB2 – Transitional Housing Unit
Building 7 – Spinal Cord Injury and Polytrauma (Decorative Fountain x1)
Building 8 – Fisher House 1
Building 9 – Defenders Lodge (Decorative Fountain x1)
Building 10 – Fisher House 2
Building 100 – Primary Hospital
Building 500 – Blind Rehabilitation Center
Building 520 – Psychiatric Ward

VA Menlo Park Medical Center, 795 Willow Road, Menlo Park CA, 94025.

Building 331 – Community Living Center Building 347 – Domiciliary Building 349 – Domiciliary Building 350 – Domiciliary Building 351 – Domiciliary Building 352 – Domiciliary Building 360 – Community Living Center Building 365 – Blind Center Rehabilitation Gilbert St. Housing Unit 18th Ave Housing Unit VA Livermore Medical Center, 4951 Arroyo Road, Livermore, CA 94550 Building 90 – Community Living Center ADDENDUM B: Monthly Water Sampling Locations VA Palo Alto Medical Center, 3801 Miranda Avenue, Palo Alto, CA 94304

BLDG 100 – Tower 1 and 2
BLDG 500 – Tower 1
BLDG 615 – Tower 1 and 2

VA Menlo Park Medical Center, 795 Willow Road, Menlo Park CA, 94025.

BLDG 331 – Tower 1
BLDG 334 – Tower 1 and 2

VA Livermore Medical Center, 4951 Arroyo Road, Livermore, CA 94550

BLDG 62 – Tower 1, 2, and 3
BLDG 90 – Tower 1

File details come from the government source that posted it. Updated .