36C26119Q1305-006.xlsx
XLSX spreadsheet Posted
- Attached to
- H141--TESTING, ADJUSTING, AND BALANCING CONTROLLED PRESSURE ROOMS Federal contract opportunity
- Solicitation number
- 36C26119Q1305
About this file
36C26119Q1305 654-20-1-6093-0002 Attachment A Annual TB Testing Room List.xlsx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26119Q1305-003.pdf | ||
| 36C26119Q1305-004.pdf | ||
| 36C26119Q1305-007.pdf | ||
| 36C26119Q1305-002.docx | DOCX document | |
| 36C26119Q1305-005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ISO Rooms
| Room # | Room Name | Minimum Total ACH | Tested CFM | Tested ACH | Room Volume (ft³) | Room Air Balance Requirement | Testing Requirement Frequency | |
| BUILDING B (12) | ||||||||
| 1st Floor Primary Care | ||||||||
| B1110 | ISO Room | 12 ACH, (6-91) | 189 | 856 ft³ | (-) | Annually | ||
| B1137 | ISO Room | 12 ACH, (6-91) | 207 | 864 ft³ | (-) | Annually | ||
| B1162 | ISO Room | 12 ACH, (6-91) | 198 | 858 ft³ | (-) | Annually | ||
| B1193 | ISO Room | 12 ACH, (6-91) | 157 | 918 ft³ | (-) | Annually | ||
| 3rd Floor ICU (Under Construction) | ||||||||
| B3629 | ISO Room | 12 ACH, (6-91) | Annually | |||||
| B3629 | Ante Room | 10 ACH, (6-91) | Annually | |||||
| B3639 | ISO Room | 12 ACH, (6-91) | Annually | |||||
| B3639 | Ante Room | 10 ACH, (6-91) | Annually | |||||
| 4th Floor Med Surg | ||||||||
| B4131 | Ultrasound | 6 ACH, (6-44) | 396 | 1677 ft³ | (+) | Annually | ||
| B4135 | Ultrasound | 6 ACH, (6-44) | 503 | 1676 ft³ | (+) | Annually | ||
| B4188 | ISO Room | 12 ACH, (6-91) | 450 | 1623 ft³ | Corridor to Ante | (-) | Annually | |
| B4188A | Ante Room | 10 ACH, (6-91) | 87 | 448 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B4192 | ISO Room | 12 ACH, (6-91) | 523 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B4192A | Ante Room | 10 ACH, (6-91) | 56 | 441 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| 5th Floor | ||||||||
| B5131 | ISO Room | 12 ACH, (6-91) | 405 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B5131A | Ante Room | 10 ACH, (6-91) | 83 | 448 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5135 | ISO Room | 12 ACH, (6-91) | 426 | 1676 ft³ | Corridor to Ante | (-) | Annually | |
| B5135A | Ante Room | 10 ACH, (6-91) | 78 | 433 ft³ | Corridor to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5188 | ISO Room | 12 ACH, (6-91) | 414 | 1676 ft³ | Corridor to Ante | (-) | Annually | |
| B5188A | Ante Room | 10 ACH, (6-91) | 52 | 433 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B5192 | ISO Room | 12 ACH, (6-91) | 527 | 1662 ft³ | Corridor to Ante | (-) | Annually | |
| B5192A | Ante Room | 10 ACH, (6-91) | 97 | 448 ft³ | Ante to Isolation | (-) Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| 6th Floor Inpatient Mental Health | ||||||||
| B6134 | ISO Room | 12 ACH, (6-91) | 263 | 888 ft³ | Corridor to Ante | (-) | Annually | |
| B3164A | Ante Room | 10 ACH, (6-91) | 103 | 667 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| B6193 | ISO Room | 12 ACH, (6-91) | 222 | 920 ft³ | Corridor to Ante | (-) | Annually | |
| B6193A | Ante Room | 10 ACH, (6-91) | 70 | 736 ft³ | Ante to Isolation | Note(1) | Annually | |
| Corridor to Isolation | (-) | Annually | ||||||
| BUILDING G (1D) | ||||||||
| 1st Floor | ||||||||
| SPS | SPS Decon | 6 ACH, (6-76) | 1193 | 4521 ft³ | Decon to Corridor | (--) | Quarterly | |
| Decon to Corridor | (-) | Quarterly | ||||||
| Decon to Sterile Prep | (-) | Quarterly | ||||||
| SPS | Cart Wash / Storage | 10 ACH, (6-76) | 450 | 3688 ft³ | Cart wash to Decon | (-) | Quarterly | |
| Cart Wash to Clean Storage | (-) | Quarterly | ||||||
| Decon | Hall Restrooms | 10 ACH, (6-76) | 475 | 1916 ft³ | Decon Hall to Main Corridor | (-) | Quarterly | |
| Decon Hall to Decon | (-) | Quarterly | ||||||
| SPS | Sterile Prep | 4 ACH (6-74) | 1050 | 6346 ft³ | Sterile Prep to Clean Storage | (+) | Quarterly | |
| Sterile Prep to Decon | (+) | Quarterly | ||||||
| SPS | Clean Storage | 4 ACH (6-74) | 1113 | 5.58 | 12090 ft³ | Clean Storage to Office Area | (+) | Quarterly |
| Clean Storage to Cart Wash | (-) | Quarterly | ||||||
| Clean Storage to Sterile Storage | (+) | Quarterly | ||||||
| SPS | Sterile Storage | 4 ACH, (6-75) | 609 | 6978 ft³ | Sterile Storage to Sterile Prep | (-) | Quarterly | |
| Sterile Storage to Clean Storage | (+) | Quarterly | ||||||
| 2nd Floor | ||||||||
| G2538 | Bronchoscopy | 15 (6-43) | 719 | 18.4 | 2681.3 | (-) | Annually | |
| G2559 | Cardiac Cath Lab | 15 (6-43) | 1459 | 11.1 | 7876.26 | Room to Hallway | (-) | Annually |
| Room to Control Room | (-) | Annually | ||||||
| G2589 | IR Special Procedure | 15 (6-43) | 6007 ft³ | (+) | Annually | |||
| G2642 | Chemo | 30 (6-57) | 493 | 914 ft³ | Chemo To Ante Room | (-) | Annually | |
| G2642 | IV | 30 (6-56) | 909 | 1362 ft³ | IV To Ante Room | (-) | Annually | |
| G2642 | Ante | 30 (6-56) | 801 | 1444 ft³ | Ante to Pharmacy | (+) | Annually | |
| Ante to Chemo | (-) | Annually | ||||||
| Ante to IV | (+) | Annually | ||||||
| 3rd Floor | ||||||||
| G3566 | OR #1 | 20 (6-84) | 877 | 3479 ft³ | OR 1 to Center Core | (+) | ||
| OR 1 to Corridor | (+) | Annually | ||||||
| G3568 | OR #2 | 20 (6-84) | 957 | 3750 ft³ | OR 2 to Center Core | (+) | Annually | |
| OR 2 to Corridor | (+) | Annually | ||||||
| G3578 | OR #3 | 20 (6-84) | 1331 | 5116 ft³ | OR 3 to Center Core | (+) | Annually | |
| OR 3 to Corridor | (+) | Annually | ||||||
| G3607 | OR #4 | 20 (6-84) | 1260 | 3747 ft³ | OR 4 to Center Core | (+) | Annually | |
| OR 4 to Corridor | (+) | Annually | ||||||
| OR 4 to Storage | (+) | Annually | ||||||
| G3603 | Cysto 1 | 20 (6-83) | 964 | 3681 ft³ | To Corridor | (+) | Annually | |
| To Corridor | (+) | Annually | ||||||
| To Center Storage | (+) | Annually | ||||||
| G3601 | Cysto 2 | 20 (6-83 | 674 | 2641 ft³ | To Corridor West | (+) | Annually | |
| To Corridor East | (+) | Annually | ||||||
| To Center Storage | (+) | Annually | ||||||
| To Bathroom | (+) | Annually | ||||||
| G4550 | IR Special Procedure | 15 (6-43) | 1335 | 4349 ft³ | To Corridor | (+) | Annually | |
| To Control Room | (+) | Annually | ||||||
| Building H (MRI) | ||||||||
| H3680 | Endoscopy: EDG Procedure | 15 ACH, (6-93) | 748 | 2856 ft³ | Endo to Corridor | (+) | ||
| Endo to Center Core | (+) | Annually | ||||||
| H3686 | Endoscopy: EDG Procedure | 15 ACH, (6-93) | 729 | 2515 ft³ | Endo to Corridor | (+) | Annually | |
| Endo to Center Office | (+) | Annually | ||||||
| H3672 | Endoscopy: Gastro Procedure | 15 ACH, (6-93) | 843 | 3076 ft³ | Endo to Corridor | (+) | Annually | |
| Endo to Center Office | (+) | Annually | ||||||
| Building J (Emergency Department) | ||||||||
| J1416 | ISO Room ED | 12 | 154 | 1470.7 ft³ | (-) | Annually | ||
| J1721 | ISO Room ED | 12 | (-) | Annually |
NOTES:
(1) Ante room is required to be at 0.01 in wc negative air pressure. Air shall transfer from the corridor into the Ante room and then into the Isolation Room. The Ante Room is positive (+) in respect to the Isolation Room and negative (-) with respect to the corridor.
(2) OR and CYSTO Rooms are grandfathered in to have 15 ACH as an acceptable ACH as long as they are positve (+).
654-20-1-6093-0002 ATTACHMENT A &"-,Bold"&12Indoor Air Quality &16ISO and Critical Environment Room Minimum Air Change and Pressure Requirements&12 &"-,Regular"&8in accordance with&"-,Bold"&12 VA HVAC Design Manual 2011 5-6-19
4/3/2019 image1.jpg
File details come from the government source that posted it. Updated .