36C26119Q0001-003.docx

DOCX document 17 KB Posted

Attached to
Histology Specimen Processing Federal contract opportunity
Solicitation number
36C26119Q0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

36C26119Q0001 S02 QASP Histotology Specimen Processing.docx

View the file

Other files for this federal contract opportunity

Other files attached to Histology Specimen Processing, newest first.
File Type Posted
36C26119Q0001-001.docx DOCX document
36C26119Q0001-002.docx DOCX document
36C26119Q0001-004.pdf PDF
36C26119Q0001-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

For: Pathology & Laboratory Service Contract Number: ________________ Contract Description: LABORATORY HISTOLOGY SPECIMEN PROCESSING Contractor’s name: Tracy Worrell

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

*Note. The QASP is not a part of the contract. Its sole use is to monitor contractor performance.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: _______________ Organization or Agency: _______________________________

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Danny Mejia

c. Other Key Government Personnel: Sang Gross, Laboratory Manager.

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager - Enter name, if any

b. Other Contractor Personnel - Enter name(s) of the providers.

4. PERFORMANCE MEASURES

Performance measures are comprised of performance indicators (some characteristic of a deliverable that can be measured) and performance measures (a mark, measure or benchmark that government personnel use as a point of comparison when evaluating contractor performance). The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these measures.

Task ID
PERFORMANCE

Indicator

MEASURES

Standard

Acceptable Quality Level
Method of Surveillance
Score

90, 95, or 100%

Sample acceptance
Samples collected from VA PAHCS M-F as requested in PWS.
100 % on time pick up/acceptance
100%
Documentation of receipt.
Delivery
Final product returned within 18 hours of sample receipt.
100 % product received within time frame.
100%
Documentation of receipt.
Quality
Supervisor satisfaction with end product. Product prepared as ordered.
100 % Preparation accuracy.
100%
VA PAHCS Histology supervisor satisfaction

5. INCENTIVES AND DISINCENTIVES

There are no incentives or disincentives. The Government shall use the scoring methods above for continuing contract performance.

6. METHODS OF QUALITY ASSURANCE SURVEILLANCE

Various methods exist to monitor performance. The COR may use any surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION: The COR can perform periodically or through 100% surveillance.

b. PERIODIC INSPECTION. The COR evaluates outcomes on a periodic basis. Inspections may be scheduled daily, weekly, monthly, quarterly, or annually or use unscheduled inspections.

c. USER SURVEY: This method combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. The COR may also generate inspections and sampling.

d. VALIDATED USER/CUSTOMER COMPLAINTS. This method relies on the patient to identify deficiencies. Complaints are then investigated and validated.

e.100% INSPECTION. The COR may evaluate all outcomes.

f. RANDOM SAMPLING. This is designed to evaluate performance by randomly selecting and inspecting a sample of cases.

g. Progress reports or status meetings. The COR will analyze contractor's progress reports. (Evaluate cost, schedule, etc.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral or negative outcome. The following ratings shall be used: 100% is positive, 95% is neutral, and 90% is negative.

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE (100% RATING) The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE (90% RATING) When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor and a copy to the Contracting Officer.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the Contracting Officer.

File details come from the government source that posted it.