36C26119B0007-0003000.docx
DOCX document 21 KB Posted
- Attached to
- Underground Propane Gas Pipe Repair 459-19-004
- Solicitation number
- 36C26119B0007
About this file
36C26119B0007 0003 36C26119B0007 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26119B0007-0003003.pdf | ||
| 36C26119B0007-0003001.pdf | ||
| 36C26119B0007-0003002.pdf | ||
| 36C26119B0007_0002.docx | DOCX document | |
| 36C26119B0007_0001.docx | DOCX document | |
| Pre-Bid_Conference_Sign-In_Sheet.pdf | ||
| ACC_Propane_Gas_Line_Replacement_AS-Buit_r1_12062018.pdf | ||
| 36C26119B0007_1.docx | DOCX document | |
| 36C26119B0007_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 01-25-2019 459-19-1-622-0072 459-19-004 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 3375 Koapaka Street, Suite F250 Honolulu
HI
96819 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 3375 Koapaka Street, Suite F250 Honolulu
HI
96819 To all Offerors/Bidders
36C26119B0007 12-14-2018
X X X
459-3690162-622-855100-2580 010056190 X one (1) 459-19-004: Underground Propane Gas Pipe Repair Amendment A0003 is issued as follows:
Providing Clarifications/Answers to RFI questions;
No other changes are made at this time; All other Terms and Conditions remain unchanged.
Claude Humphrey Contracting Officer
PCOE16L2-3302
CONTINUATION PAGE
AMENDMENT 0003
Clarification:
The following questions have been submitted to the Contracting Officer regarding this solicitation. The questions and responses represent all questions submitted to the Contracting Officer prior to the deadline established in the Solicitation. The following clarification is hereby being provided regarding the solicitation for bidder’s information and use. No response will be furnished to questions submitted hereafter. Bidders are instructed to submit their bids in response to the solicitation “as-is”. Any remaining issues will be addressed with the successful bidder. Questions and responses are provided for bidder’s information and use.
RFI 1. What is the duration of the pressure test of 65 psi on the new gas line?
Response: 24 - hour period.
RFI 2. Is there an allowable pressure drop during the pressure test to allow for temperature changes?
Response: Yes, no more than 3 Psi for 24 - hour test period.
RFI 3. How thick is the sand bedding below the MDPE pipe?
Response: 4 inches
RFI 4. What is the compaction percentage for the under pavement backfill?
Response: 95%
RFI 5. The VA provided drawing does not show termination point or tie-in point. Please provide?
Response: See attached ACC P4.2; ACC P7.13; and ACC Site Utilities L1.6 drawings, which are submitted for informational purposes only.
RFI 6. What is Tripler’s loading dock hours of operation for vehicle access?
Response: The loading dock is accessible twenty-four (24) hours a day. Contractor is to minimize vehicle traffic during normal business hours (0700 – 1700).
RFI 7. Is the contractor to maintain access to the parking areas, and loading docks around and beyond the trenching operations, during work hours?
Response: Yes
RFI 8. Will the contractor be allowed to park construction equipment in the parking stalls next to trenching operations during non-work hours?
Response: No; the parking stalls are owned by Tripler Army Medical Center and not the VA.
RFI 9. Will parking be provided for construction personnel?
Response: Yes; FMES will request two (2) reserved stalls for construction activities during the contract period of performance.
RFI 10. What vehicle sizes will be allowed to enter and exit the work area, to determine work sequence?
Response: Normal construction vehicles of any size should be able to access the work area. Contractor to maintain access to the parking areas, and loading docks around and beyond the trenching operations, during work hours.
RFI 11. Can as-builts be provided for existing utility inverts and if they are concrete encased?
Response: No, not available, utilities are to be toned prior to excavation.
RFI 12. Will a laydown area be provided for stockpile of soils due to soil testing for PVT disposalor removal off a federal installation taking 3-4 weeks? Will temp utilities be provided?
Response: There is no available laydown area for soil. Temporary power, and water will be available from ACC Facility. It will be Contractor responsibility to temporarily connect to water and electrical, and to restore connection points to original condition when the project is completed.
RFI 13. Has there been any soil testing requirements for contaminants or reuse?
Response: Yes, for soil to be used for backfill.
RFI 14. Verify that the Contractor will be required to obtain Dig permit.
Response: Yes, the Contractor will be required to obtain a Dig Permit.
RFI 15. Verify that gas line to be run is ‘New’ vs ‘Repair”?
Response: Gas line piping shall be ‘New’.
RFI 16. Hawaii Gas Question – What is the BTU load of equipment inside for verification of piping size and commissioning?
Response: N/A, the VA is unable to respond to the question.
END OF AMENDMENT 0003
See attached document: ACC Site Utilities L1.6.
See attached document: ACC P4.2.
See attached document: ACC P7.13.