36C26119B0005-0003000.docx
DOCX document 28 KB Posted
- Solicitation number
- 36C26119B0005
About this file
36C26119B0005 0003 36C26119B0005 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26119B0005-0003001.pdf | ||
| 36C26119B0005-0002000.docx | DOCX document | |
| 36C26119B0005-0002004.pdf | ||
| 36C26119B0005-0002001.pdf | ||
| 36C26119B0005-0002005.pdf | ||
| 36C26119B0005-0002002.pdf | ||
| 36C26119B0005-0002003.pdf | ||
| 36C26119B0005-0001011.docx | DOCX document | |
| 36C26119B0005-0001001.pdf | ||
| 36C26119B0005-0001007.pdf | ||
| 36C26119B0005-0001000.docx | DOCX document | |
| 36C26119B0005-0001003.pdf | ||
| 36C26119B0005-0001008.pdf | ||
| 36C26119B0005-0001006.pdf | ||
| 36C26119B0005-0001010.pdf | ||
| 36C26119B0005-0001005.pdf | ||
| 36C26119B0005-0001004.pdf | ||
| 36C26119B0005-0001009.pdf | ||
| 36C26119B0005-0001002.pdf | ||
| 36C26119B0005-003.pdf | ||
| 36C26119B0005-002.docx | DOCX document | |
| 36C26119B0005-004.pdf | ||
| 36C26119B0005-001.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 06-14-2019 459-19-2-893-001 459-16-103 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System Koapaka Street, Suite F250 Honolulu, HI 96819 Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Pacific Islands Health Care System 3375 Koapaka Street, Sui459 Patterson Rd Honolulu, HI 96819 To all Offerors/Bidders
36C26119B0005 04-05-2019
X X X
459-368/90162-897-854200-3223 23NRNR000
X one (1) Install Realtime Water Monitoring System Amendment 0003 is issued to:
Response to RFI questions and to add the attached Drawings.
The Bid Opening Due Time/Date of 3:00 p.m., local Hawaiin time, Friday, June 28, 2019 remains unchanged.
No other changes are made at this time; All other Terms andConditions remain unchanged.
Claude Humphrey Contracting Officer
PCOE16L2-3302
CONTINUATION PAGE
AMENDMENT 0003
RFO Response/Clarification:
The following questions have been submitted to the Contracting Officer regarding this solicitation. The questions and responses represent all questions submitted to the Contracting Officer prior to the deadline established in the Solicitation. The following clarification is hereby being provided regarding the solicitation for bidder’s information and use. No response will be furnished to questions submitted hereafter. Bidders are instructed to submit their bids in response to the solicitation “as-is”. Any remaining issues will be addressed with the successful bidder. Questions and responses are provided for bidder’s information and use.
RFI 1. Clarification is required on the following:
As reflected on construction drawings sheets A-101/102/103 there are approximately (91) points where existing electrical is to be reused. In previous RFI/ Responses, the electrical sheets provided only gave an overlay of where new work is needed without any reference to existing circuitry. Please provide information on existing electrical circuitry (where the power originates from) for the existing electrical to be reused. Please note that this information will substantially improve cost-effectiveness by reducing the time needed to perform the electrical work.
Response: All the sink has sensors. Electrical is located directly under the sinks.
RFI 2. Section 01 00 00, Paragraph 1.16 calls for a Phigenics WME-1175 PWA continuous monitoring system, but Section 22 40 00 Paragraph 2.8 calls for a Nalco Aquapath system. Please clarify which manufacturer and model monitoring system we are to provide.
Response: Go with the Phigenic WME-1175.
RFI 3. Please provide the following missing drawing sheet; E-103 – Wing “B” & “C” Electrical Plan.
Response: See attached E-103 Wing “B” and “C” Electrical Plan.
attached document: E-103 Wing “B” and “C” Electrical Plan.
All other solicitation requirements remain as is and unchanged.
END OF AMENDMENT 0003
File details come from the government source that posted it.