36C26119B0004-013.pdf
PDF 79 KB Posted
- Solicitation number
- 36C26119B0004
About this file
36C26119B0004 Attach 12 Resilient Base and Accesories.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26119C0089-000.docx | DOCX document | |
| 36C26119B0004-0006000.docx | DOCX document | |
| 36C26119B0004-0006001.pdf | ||
| 36C26119B0004-0005001.pdf | ||
| 36C26119B0004-0005000.docx | DOCX document | |
| 36C26119B0004-0004001.docx | DOCX document | |
| 36C26119B0004-0004000.docx | DOCX document | |
| 36C26119B0004-0003000.docx | DOCX document | |
| 36C26119B0004-0003001.pdf | ||
| 36C26119B0004-0002000.docx | DOCX document | |
| 36C26119B0004-0001012.docx | DOCX document | |
| 36C26119B0004-001.docx | DOCX document | |
| 36C26119B0004-014.pdf | ||
| 36C26119B0004-006.pdf | ||
| 36C26119B0004-002.pdf | ||
| 36C26119B0004-004.pdf | ||
| 36C26119B0004-012.pdf | ||
| 36C26119B0004-009.pdf | ||
| 36C26119B0004-007.txt | TXT text file | |
| 36C26119B0004-015.doc | DOC document | |
| 36C26119B0004-016.docx | DOCX document | |
| 36C26119B0004-005.pdf | ||
| 36C26119B0004-008.pdf | ||
| 36C26119B0004-010.pdf | ||
| 36C26119B0004-011.pdf | ||
| 36C26119B0004-003.pptx | PPTX presentation | |
| 36C26119B0004-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attach 12
09 65 13 - 1
SECTION 09 65 13
RESILIENT BASE AND ACCESSORIES
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies the installation of vinyl or rubber base and resilient stair tread tape.
1.2 RELATED WORK
A. Integral base with sheet flooring: Section 09 65 16, RESILIENT SHEET
FLOORING.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Base and stair material manufacturer's recommendations for adhesives.
3. Application and installation instructions.
C. Samples:
1. Base: 150 mm (6 inches) long, each type and color.
2. Adhesive: Literature indicating each type.
1.4 DELIVERY
A. Deliver materials to the site in original sealed packages or containers, clearly marked with the manufacturer's name or brand, type and color, production run number and date of manufacture.
B. Materials from containers which have been distorted, damaged or opened prior to installation will be rejected.
1.5 STORAGE
A. Store materials in weather tight and dry storage facility.
B. Protect material from damage by handling and construction operations before, during, and after installation.
1.6 APPLICABLE PUBLICATIONS
A. The publication listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
F1344-04................Rubber Floor Tile
F1859-04................Rubber Sheet Floor Covering without Backing
F1860-04................Rubber Sheet Floor Covering with Backing
F1861-02................Resilient Wall Base
09 65 13 - 2
PART 2 - PRODUCTS
2.1 GENERAL
Use only products by the same manufacturer and from the same production run.
2.2 RESILIENT BASE
A. ASTM F1861, 6 inches high, Type TP Rubber, Thermoplastics, Group 2-layered with molded top. Style B-cove.
B. Where carpet occurs, use Style A-straight.
C. Use only one type of base throughout.
2.3 RESILIENT STAIR TREAD TAPE
A. Visible tape shall be applied to stair nosing as specified on drawings.
Tape shall be Photo luminescent Glow-in-the-Dark or "High Visibility" yellow.
2.4 PRIMER (FOR CONCRETE FLOORS)
As recommended by the adhesive and tile manufacturer.
2.5 LEVELING COMPOUND (FOR CONCRETE FLOORS)
Provide products with latex or polyvinyl acetate resins in the mix.
2.6 ADHESIVES
A. Use products recommended by the material manufacturer for the conditions of use.
B. Use low-VOC adhesive during installation. Water based adhesive with low
VOC is preferred over solvent based adhesive.
PART 3 - EXECUTION
3.1 PROJECT CONDITIONS
A. Maintain temperature of materials above 21o C (70 °F), for 48 hours before installation.
B. Maintain temperature of rooms where work occurs, between 21o C and 27o C
(70oF and 80oF) for at least 48 hours, before, during, and after installation.
C. Do not install materials until building is permanently enclosed and wet construction is complete, dry, and cured.
3.2 INSTALLATION REQUIREMENTS
A. The respective manufacturer's instructions for application and installation will be considered for use when approved by the Resident
Engineer.
B. Submit proposed installation deviation from this specification to the
Resident Engineer indicating the differences in the method of installation.
09 65 13 - 3
C. The Resident Engineer reserves the right to have test portions of material installation removed to check for non-uniform adhesion and spotty adhesive coverage.
3.3 PREPARATION
A. Examine surfaces on which material is to be installed.
B. Fill cracks, pits, and dents with leveling compound.
C. Level to 3 mm (1/8 inch) maximum variations.
D. Do not use adhesive for leveling or filling.
E. Grind, sand, or cut away protrusions; grind high spots.
F. Clean substrate area of oil, grease, dust, paint, and deleterious substances.
G. Substrate area dry and cured. Perform manufacturer’s recommended bond and moisture test.
H. Preparation of existing installation:
1. Remove existing base and stair treads including adhesive.
2. Do not use solvents to remove adhesives.
3. Prepare substrate as specified.
3.4 BASE INSTALLATION
A. Location:
1. Unless otherwise specified or shown, where base is scheduled, install base over toe space of base of casework, lockers, laboratory, pharmacy furniture island cabinets and where other equipment occurs.
2. Extend base scheduled for room into adjacent closet, alcoves, and around columns.
B. Application:
1. Apply adhesive uniformly with no bare spots.
2. Set base with joints aligned and butted to touch for entire height.
3. Before starting installation, layout base material to provide the minimum number of joints with no strip less than 600 mm (24 inches) length.
a. Short pieces to save material will not be permitted.
b. Locate joints as remote from corners as the material lengths or the wall configuration will permit.
C. Form corners and end stops as follows:
1. Score back of outside corner.
2. Score face of inside corner and notch cove.
D. Roll base for complete adhesion.
3.5 STAIR TAPE INSTALLATION
A. Prepare surfaces to receive tape. Thoroughly clean all surfaces.
B. Application:
1. Apply adhesive uniformly with no bare spots.
09 65 13 - 4
2. Roll tape evenly into position to assure adhesion.
3.6 CLEANING AND PROTECTION
A. Clean all exposed surfaces of base and adjoining areas of adhesive spatter before it sets.
B. Keep traffic off resilient material for at least 72 hours after installation.
C. Clean and polish materials in the following order:
1. After two weeks, scrub resilient base with a minimum amount of water and a mild detergent. Leave surfaces clean and free of detergent residue. Polish resilient base to a gloss finish.
D. When construction traffic is anticipated, cover materials with reinforced kraft paper and plywood or hardboard properly secured and maintained until removal is directed by the Resident Engineer.
E. Where protective materials are removed and immediately prior to acceptance, replace damaged materials and re-clean resilient materials.
Damaged materials are defined as having cuts, gouges, scrapes or tears and not fully adhered.
- - - E N D - - -