36C26118Q9529-0002001.pdf
PDF 23 KB Posted
- Solicitation number
- 36C26118Q9529
About this file
36C26118Q9529 0002 36C26118Q9529-043 RFI Form answers.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26118Q9529-0004002.pdf | ||
| 36C26118Q9529-0004001.pdf | ||
| 36C26118Q9529-0004000.docx | DOCX document | |
| 36C26118Q9529-0004003.pdf | ||
| 36C26118Q9529-0003000.docx | DOCX document | |
| 36C26118Q9529-0003001.pdf | ||
| 36C26118Q9529-0002000.docx | DOCX document | |
| 36C26118Q9529-0001001.pdf | ||
| 36C26118Q9529-0001000.docx | DOCX document | |
| 36C26118Q9529-046.pdf | ||
| 36C26118Q9529-043.docx | DOCX document | |
| 36C26118Q9529-048.doc | DOC document | |
| 36C26118Q9529-042.docx | DOCX document | |
| 36C26118Q9529-044.pdf | ||
| 36C26118Q9529-047.docx | DOCX document | |
| 36C26118Q9529-045.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI FORM
Contractor Name: Acierto LLC Address: 2053 N. 2000 W. Farr West, Ut. 84404 Phone/eMail: 801 917 0070 Joe@acierto.us Send to: Pastaveia.st.john@va.gov AND Karen.smith3@va.gov
RFI
(REQUEST FOR INFORMATION)
RFQ#:
36C261-18-Q-9529 CONTRACTOR
RFI NO.:
PROJECT NAME:
Specialty Clinic Painting _ Electrical Wiring
DATE
REQUESTED:
08/23/2018
ACQUISITION
NO.:
VA261-18-AP-5325 REFERENCE:
DRAWING:
N/A
SPECIFICATION
SECTION:
N/A
DESCRIPTION OF PROBLEM OR INFORMATION BEING
REQUESTED
1. What is the level of finish 1-5 for sheet rock repairs? Level 5
2. Can you provide a count of wood doors and the number of steel doors?
• Module 1 – (1) wood, (11) steel
• Module 2 – (26) wood
• Module 3 – (8) wood, (5) steel
3. Mod space 3 has new wooden doors with an already approved finish. Do you still want these doors removed and lacquered? No, not reflected in answer 2.
4. Some of the walls have what looks to be a wall covering of some sort. We would like to see if the requirement to remove wall covering can be deleted from the scope?
Removing wall covering will be very time consuming and cause damage to existing sheet rock beyond just a skim coat. Will require removal and new sheet rock installed.
No need to remove wallcovering if you can still achieve a level 5 finish.
5. Scope indicates that the number of days to accomplish each phase is Friday and Saturdays. Can that be changed to read to include Saturday and Sunday for a total of 4 working days per phase instead of two days. Based on the comments we will expand the hours of work as follows:
• 3 – 11 p.m. Thursday and Friday, 6 a.m. – 12 p.m. Saturday
• 6 a.m. – 3 p.m. Friday – No odor and dust producing work.
mailto:Pastaveia.st.john@va.gov mailto:Karen.smith3@va.gov
• VA PROJECT MANAGER’S RESPONSE
VA TRACKING # FOR ALL RFI’S: AMENDMENT NO.:
VA PROJECT ENGINEER/MANAGER: Susan Ives DATE: 8/27/2018