Sources Sought Notice 36C26027Q0105 Water System Maint..docx
DOCX document 49 KB Posted
- Attached to
- Water system Maintenance
- Solicitation number
- 36C26027Q0105
About this file
This is a Sources Sought Notice for a water system maintenance requirement issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20. The solicitation number is 36C26027Q0105, and this is a pre-solicitation notice designed to identify potential contractors and gather market research prior to formal solicitation release.
The notice seeks information from contractors capable of providing water system maintenance services. While specific technical requirements, performance metrics, and scope details are not provided in the limited information available, this pre-solicitation phase allows interested vendors to submit capability statements and relevant experience demonstrating their qualifications to perform water system maintenance work for VA facilities within VISN 20. Interested parties should monitor for the formal solicitation release, which will contain detailed requirements, evaluation criteria, contract terms, and response deadlines. No specific award date, pricing terms, or set-asides are indicated at this pre-solicitation stage.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice Sources Sought Notice
| SUBJECT* |
| Water Systems Maintenance Base Plus 4 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 98661 |
| SOLICITATION NUMBER* |
| 36C26027Q0105 |
| RESPONSE DATE/TIME/ZONE |
| 11-10-2026 10:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 20 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| J046 |
| NAICS CODE* |
| 221310 |
| CONTRACTING OFFICE ADDRESS |
| Network Contracting Office 20 |
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
POINT OF CONTACT*
Contracting Officer Robyn Akins robyn.akins@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| Jonathan M Wainwright Memorial VA Medical Center |
Walla Walla VA Medical Center
77 Wainwright Drive
Walla Walla WA
| POSTAL CODE |
| 99362 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
THIS IS A SOURCES SOUGHT NOTICE ONLY. The purpose of this Sources Sought Notice is to obtain information regarding the availability and capability of all qualified sources to perform a potential requirement, and to gain knowledge of potential qualified Service-Disabled Veteran Owned Small Business (SDVOSB), Veteran Owned Small Business (VOSB), Small Business Manufactures, other Small Businesses interested and capable of providing items requested, as well as any large business interested and capable. This REQUEST FOR INFORMATION/SOURCES SOUGHT NOTICE in support of the Jonathan M. Wainright VA Medical Center, is for market research purposes and planning purposes only and is not to be construed as a commitment by the Government. The Government will not pay for information solicited. Respondents will not be notified of the results of the evaluation. Results will be used to determine set-aside.
The intended contract is a firm-fixed price service purchase.
Potential contractors shall provide, at a minimum, the following:
1) Company name, address, point of contact, phone number, e-mail address, and SAM.gov UEI number.
2) Anticipated North American Industry Classification System (NAICS) code is 221310. The largest a firm can be and still qualify as a small business for Federal Government programs is no more than $41.0 million. Please indicate whether you are a Small Business, SDVOSB, VOSB, Small Business Manufacturer, Other Small Business, or Large Business, and whether you are the manufacturer of the items listed below.
3) The Government is not obligated to, nor will it pay for or reimburse, and costs associated with responding to this sources sought notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will in no way be bound to this information if any solicitation is issued. Notice to Potential Offers who provide goods or services to the United States Federal Government must be registered in the System Award Management (SAM located on the web at www.sam.gov) It is desirable that any Offeror to have completed their business Online Representations and Certifications Application in the System for Award Management (SAM).
4) Any Service-Disabled Veteran Owned Businesses or Veteran Owned Businesses who respond to a solicitation on this project must be registered with the Small Business Administration VetCert Registry located at https://veterans.certify.sba.gov.
5) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
It is the intent of the VA to use the information gathered for market research purposes only. If a formal solicitation is released it will be posted via Contracting Opportunities website located at SAM.gov of GSA eBuy.
DESCRIPTION OF THE REQUIREMENT:
The Department of Veterans Affairs is looking to obtain information on vendors who can provide the products as outlined below. This is an Unrestricted/Open Market request for Information/Sources Sought Notice.
Delivery Address:
Jonathan M Wainwright Memorial VA Medical Center 77 Wainwright Drive Walla Walla, WA 99362
Statement of Work Water System Inspection, Testing, and Maintenance Services Jonathan M. Wainwright Memorial VA Medical Center, Walla Walla, Washington A. Title Water System Inspection, Testing, and Maintenance Services for Jonathan M. Wainwright Memorial VA Medical Center, Walla Walla, Washington B. Background The Jonathan M. Wainwright Memorial VA Medical Center (WWVAMC), located in Walla Walla, WA, seeks the services of qualified contractors and technicians to perform annual inspection and as-needed maintenance/repair of the on-site water system, including the well head, pump control, water tower, and on-site hypochlorite generation equipment. This contract consolidates inspection, testing, and repair of these systems to maintain compliance with Washington State Department of Health (DOH), Washington State Department of Ecology, U.S. Environmental Protection Agency (EPA), and American Water Works Association (AWWA) requirements applicable to a Group A small public water system.
C. Site Information The WWVAMC operates a Washington State Group A small water system, system identification number 90542, currently managed by Valley Water Services. Potable water is sourced from an on-site well, with a backup connection to the City of Walla Walla available in the event of well service interruption. This backup connection allows for planned shutdowns of well and water tower equipment for inspection and maintenance without loss of water service to the facility.
The WWVAMC water system includes one well (well head pump, well water level control panel, well head flow meter), one on-site hypochlorite generation system (salt/solid sodium chloride storage and electrolytic generation unit), one 150,000-gallon water tower (water tower level control panel, water tower mixer pump), an overflow pump, and an associated pump control panel. These utilities serve WWVAMC-owned buildings and several properties leased to community partners, including residential housing, food production, childcare, and recreational functions. Monthly consumption for other than irrigation use is up to two (2) million gallons.
D. Scope of Equipment Contractor shall furnish all labor, travel, equipment, supplies, and materials required to perform a complete annual inspection and as needed, repair/maintenance of the following equipment:
· Pump Control Panel
· Well Water Level Control Panel
· Well Head Pump
· Well Head Flow Meter
· Chlorination System (on-site electrolytic sodium hypochlorite generation unit)
· Chlorine Tanks and Off-Gas Fans (salt/brine storage and hydrogen off-gas ventilation)
· Overflow Pump
· Water Tower Level Control Panel
· Water Tower Mixer Pump
· Water Tower Tank Structure
· Cathodic Protection System
E. General Requirements
· The Contractor must have prior experience successfully inspecting and maintaining water well, pump, water tower, cathodic protection, water storage, and on-site hypochlorite generation equipment of similar size and complexity to the WWVAMC water system, within the State of Washington.
· The Contractor shall follow best industry practices to ensure equipment is properly inspected and maintained, and that the integrity and continuous operability of the water system is protected during all work.
· The Contractor shall follow the applicable practices of the American Water Works Association (AWWA) in performing inspection, testing, and maintenance activities.
· Note that AWWA D101-53 is specific to the water tank, and D104-11 is specific to the cathodic protection system.
· Have and maintain the following licenses or certifications per WAC 173-360A-0940 and the Association of Diving Contractors International (ADCI) to perform the services required by this contract: Cathodic Protection Tester, Corrosion Expert, and Entry-level Tender/Diver, Air Diver, and Air-Diving Supervisor.
F. Coordination Requirements The Contractor shall check in with the Contracting Officer Representative (COR) prior to any work being performed at the place of performance. If any equipment listed in Section D must be shut down to perform inspection, testing, or maintenance/repair work, the Contractor shall notify the COR in advance of the planned shutdown, including the equipment affected and expected duration, so that the COR can coordinate use of the backup water connection as needed.
G. Work Hours Normal Work Hours are defined as Monday through Friday from 8 a.m. to 4:30 p.m., excluding federal holidays or as otherwise arranged with the COR. The COR will communicate with the Contractor if work, inspection, testing, or repair is required outside of normal work hours. The holidays observed by the Federal Government are New Year's Day, Martin Luther King Day, President's Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. Also, any other day declared by the President of the United States to be a national holiday.
H. Security Requirements Contractors are required to obtain security badges from VA Police prior to any work being performed, to visibly display to VA staff or patients at the facility. Check-in/check-out at VA Police is mandatory to obtain a temporary badge for each visit. Labor hours for the Maintenance Rider (Section M) are based on the time of check-in/check-out of each technician at the facility, which is mandatory.
I. Safety Requirements
· The Contractor shall have a confined space permit to present to safety personnel while on site, prior to entry into any confined space associated with this equipment. The permit shall be the Contractor's internal confined space entry permit, consistent with 29 CFR 1910.146 (Permit-Required Confined Spaces).
· Any diving that occurs under this contract shall follow the safety requirements of OSHA 29 CFR 1910 Subpart T.
J. Specific Tasks Administration and Scheduling
· The Contractor will provide the COR a schedule of proposed dates for the annual inspection within thirty (30) days of contract award (and within 30 days of each exercised option year).
· The Contractor shall provide all inspection documentation to the COR for provision to the current operator of the water system.
· The water tower and well system shall remain in service during inspection to the greatest extent possible. If any service cannot be performed while equipment is in service, the Contractor shall notify the COR of the required shutdown prior to the schedule being provided, consistent with Section F.
For each component, the Contractor shall perform the listed component checks, record the stated readings/observations on the inspection form, and evaluate the result against the stated acceptance criteria. Any component that fails to meet its acceptance criteria shall be documented as a deficiency, along with a recommended corrective action, consistent with the reporting format in Section N. Where a manufacturer's O&M materials for the system specify a more stringent or more specific procedure or tolerance than stated below, the manufacturer's procedure and tolerance shall govern.
J.1 — Base Year Annual Inspection Tasks The following list of tasks shall only be included for the base year of this contract. The following option years will have a reduced list of tasks due to the "one-time" inspection nature of some of the components within these systems.
J.1.1 Pump Control Panel Objective: Validate that the control panel correctly starts, stops, and protects the well head pump based on system demand and safety interlocks.
· Visually inspect enclosure for corrosion, moisture intrusion, rodent/insect intrusion, and door seal integrity.
· Inspect and torque-check all electrical terminations and lugs to manufacturer torque specification; check for discoloration or heat damage indicating loose connections.
· Verify motor starter/contactor operation through a manual start/stop cycle; check for contact pitting or chatter.
· Test overload/breaker protection settings against motor nameplate full-load amperage.
· Verify all indicator lights, alarms, and HOA (Hand-Off-Auto) switch functions operate as designed.
· Confirm interlock function with the Well Water Level Control Panel (i.e., panel correctly responds to a simulated low-level or high-level signal).
· Check panel grounding and bonding.
Acceptance Criteria: No exposed energized conductors; overload settings within manufacturer tolerance of nameplate Full Load Amperage (FLA); all indicator/alarm functions respond correctly during test; interlock signal produces correct pump response within manufacturer-specified response time; no evidence of thermal damage at terminations.
J.1.2 Well Water Level Control Panel Objective: Validate that well water level sensing and control logic accurately reflects actual well water level and correctly signals the Pump Control Panel.
· Visually inspect enclosure, wiring, and level sensor/transducer cable condition.
· Compare the panel's displayed/logged water level reading against a manual reference measurement (e.g., electronic sounder or calibrated tape) taken at the well head.
· Verify high-level and low-level setpoint alarms trigger at the programmed thresholds by simulating or bracketing the setpoint condition.
· Confirm setpoints are consistent with the well's safe operating range.
· Test communication/signal path to the Pump Control Panel (Section J.1.1) and Water Tower Level Control Panel (Section J.1.8), where applicable, to confirm coordinated system response.
Acceptance Criteria: Displayed level reading within manufacturer-stated accuracy tolerance (or ±5% of span if no manufacturer tolerance is specified) of the manual reference measurement; high/low alarm setpoints trigger within the programmed threshold; signal to Pump Control Panel confirmed functional.
J.1.3 Well Head Pump Objective: Validate that the well head pump delivers rated performance without excessive mechanical wear, and operates safely within its design envelope.
· Inspect motor housing, base, and mounting hardware for corrosion, cracking, or looseness.
· Measure and record vibration at motor bearing points; compare against baseline or ISO 10816 general guidance for the motor's mounting class.
· Listen for abnormal bearing noise, cavitation, or water hammer during a run cycle.
· Inspect all electrical connections, cable entry seals, and (if submersible) cable condition for insulation damage.
· Measure and record motor amperage draw during operation; compare to nameplate FLA.
· Measure discharge pressure and flow rate during a run cycle (using the Well Head Flow Meter, Section J.1.4) and compare to the pump's rated performance curve.
· Inspect check valve function (no backflow/water hammer on pump shutoff).
· Inspect mechanical seal or packing gland (if accessible) for leakage.
Acceptance Criteria: Vibration within acceptable range per ISO 10816 (or manufacturer guidance) for the equipment class; amperage draw within manufacturer tolerance of nameplate FLA; discharge pressure/flow within 10% of the pump's rated performance curve at the tested operating point, or as otherwise specified by manufacturer; no active leakage at seals/glands beyond manufacturer-allowed weepage; no abnormal noise or vibration indicating cavitation or bearing wear.
J.1.4 Well Head Flow Meter Objective: Validate flow measurement accuracy in accordance with AWWA Manual M6.
· Visually inspect meter body, register, and wiring/signal connections for damage or corrosion.
· Compare the meter's instantaneous or totalized reading against an independent reference measurement (e.g., calibrated portable flow meter, pump curve cross-check, or volumetric/time test where feasible) per AWWA Manual M6 guidance.
· Verify meter totalizer/data logging function (if equipped) is recording and retrievable.
· Check meter register visibility and confirm no evidence of tampering, fogging, or mechanical binding.
Acceptance Criteria: Measured accuracy within AWWA Manual M6-recommended tolerance for the meter type and size (typically ±1.5% for accuracy testing of positive displacement/turbine meters, per AWWA M6 — Contractor to confirm applicable tolerance for the specific meter type installed); totalizer/logging function confirmed operational; no physical damage affecting measurement integrity.
J.1.5 Chlorination System (On-Site Electrolytic Hypochlorite Generation Unit) Objective: Validate that the generation unit is producing sodium hypochlorite at the correct concentration and injecting it at the correct rate to maintain required disinfection residual, and that the unit is operating safely.
· Inspect brine tank/salt storage for structural integrity, corrosion, and proper salt saturation level per manufacturer specification.
· Inspect electrolytic cell(s) for scale buildup, electrode condition, and cell housing integrity; perform manufacturer-recommended cell cleaning/descaling.
· Verify generation unit output concentration (percent available chlorine) using a calibrated test method (e.g., titration) and compare to manufacturer's rated output.
· Verify injection pump/metering system delivers the calibrated dose rate; check for leaks, air-lock, or tubing degradation.
· Measure free and total chlorine residual at a representative point in the distribution system and compare against the system's target residual range and the EPA minimum residual requirement under 40 CFR Part 141, Subpart H.
· Inspect and test automatic controller/dosing logic (if equipped) for correct response to flow or residual feedback signals.
· Verify hydrogen off-gas fan interlock: confirm the generation unit is designed/programmed to alarm or shut down if off-gas ventilation fails (see Section J.1.6).
Acceptance Criteria: Output concentration within manufacturer-rated tolerance; injection/dosing rate produces distribution system residual within the target range and above the EPA minimum residual requirement; no active leaks; off-gas fan interlock/alarm confirmed functional.
J.1.6 Chlorine Tanks and Off-Gas Fans (Salt/Brine Storage and Hydrogen Ventilation) Objective: Validate that hydrogen byproduct gas is being safely vented to prevent accumulation to hazardous concentrations, and that salt/brine storage is structurally sound.
· Inspect brine/salt storage tank(s) for corrosion, cracking, leakage, and secondary containment integrity.
· Inspect off-gas fan(s) for correct operation, airflow direction, and unobstructed intake/exhaust pathways.
· If a hydrogen gas detector is installed, verify calibration and alarm setpoint function per manufacturer specification.
Acceptance Criteria: Off-gas fan(s) operate correctly with an unobstructed airflow path and no signs of ventilation restriction; no active leakage from brine/salt storage; hydrogen detector (if equipped) calibrated and alarms at correct setpoint.
J.1.7 Overflow Pump Objective: Validate that the overflow pump activates correctly to prevent uncontrolled water tower overflow and operates without excessive wear.
· Inspect motor, mounting, and electrical connections for corrosion or damage.
· Measure vibration and amperage draw during a test run cycle; compare to nameplate FLA and baseline/ISO 10816 guidance as in Section J.1.3.
· Verify activation setpoint triggers pump start at the correct level.
· Confirm discharge path is clear and directs overflow to the intended location without creating a cross-connection or backflow hazard.
· Inspect check valve (if equipped) for proper function.
Acceptance Criteria: Pump activates within the programmed high-level setpoint tolerance; amperage/vibration within nameplate/ISO 10816 tolerance; discharge path confirmed clear and free of cross-connection hazards.
J.1.8 Water Tower Level Control Panel Objective: Validate accurate water level sensing in the water tower and correct signaling to the Water Tower Mixer Pump, Overflow Pump, and well/pump control system.
· Visually inspect enclosure, wiring, and level sensor/transducer condition.
· Compare the panel's displayed/logged water level reading against a manual or independent reference measurement (e.g., pressure transducer cross-check or physical tank gauge, per AWWA Manual M42 guidance for steel water-storage tank instrumentation).
· Verify high-level, low-level, and overflow setpoint alarms trigger at programmed thresholds.
· Test signal/communication path to the Overflow Pump (Section J.1.7), Water Tower Mixer Pump (Section J.1.9), and well system controls (Section J.1.2) to confirm coordinated response.
· Ensure that panel contains the most up to date software that can be installed.
Acceptance Criteria: Displayed level reading within manufacturer-stated accuracy tolerance (or ±5% of span if unspecified) of the reference measurement; all setpoint alarms trigger within programmed threshold; confirmed signal continuity to all dependent equipment; panel software/firmware is at the most current version available from the manufacturer, or a documented reason is provided if an update cannot be applied.
J.1.9 Water Tower Mixer Pump Objective: Validate that the mixer pump adequately circulates water tower contents to prevent thermal stratification and disinfectant residual loss, per AWWA Manual M42 guidance, and operates without excessive mechanical wear.
· Inspect motor, propeller/impeller assembly, mounting, and electrical connections for corrosion, damage, or biofouling.
· Measure vibration and amperage draw during a test run cycle; compare to nameplate FLA and baseline/ISO 10816 guidance as in Section J.1.3.
· Verify mixer cycling logic/timer (if equipped) operates per the intended duty cycle.
· Verify or estimate mixing effectiveness through temperature stratification check at multiple tank elevations, or chlorine residual comparison between top and bottom sample points, consistent with AWWA M42 water quality guidance.
Acceptance Criteria: Amperage/vibration within nameplate/ISO 10816 tolerance; cycling logic operates per design; no significant temperature or residual stratification identified between sample points (variance beyond what is typical for the tank's size/turnover rate should be documented as a deficiency for further evaluation).
J.1.10 Water Tower Tank — Structural, Interior, and Exterior Inspection and Cleaning Objective: Validate the structural integrity, interior/exterior coating condition, and sanitary security of the 150,000-gallon water tower tank and restore interior cleanliness by removing sediment accumulation.
Tasks:
· Structural/Visual Inspection:
· Exterior coating condition (rust, corrosion, coating failure %)
· Structural integrity: Welds, bolts, ladders, handrails, anchor bolts
· Foundation condition (cracking, settling)
· Roof condition and vents (screened properly to prevent contamination/insect entry)
· Overflow pipe condition and screening
· Interior Inspection and Cleaning:
· Interior coating condition (failing interior coatings can leach contaminants or promote corrosion)
· Sediment accumulation on tank floor; removal/cleaning of accumulated sediment
· Structural condition of interior components (rafters, columns)
· Water Quality Testing of Tank (post-cleaning):
· Disinfectant residual
· Bacteriological samples for total coliform and E. coli
· Turbidity due to surface water disturbance
· Security & Vulnerability:
· Hatch/access point lock integrity
· Vent and overflow screening
· Service Continuity: The tank shall remain filled and in service during inspection to the greatest extent possible. If any task cannot be performed with the tank in service, or if draining is required for cleaning, the Contractor shall notify the COR prior to scheduling, consistent with Section F and Section O, and shall document the need for draining in the inspection report.
· Cathodic Protection Preservation: Inspection of the CP system itself is out of scope for this task (see J.3.1) and is being performed separately in 2027 under a different contract; however, the Contractor shall follow WAC 173-360A-0430 to ensure the CP system is not damaged or otherwise compromised during tank inspection and cleaning work.
· Diving Requirements: Where diving is used to perform interior inspection or cleaning, the Contractor shall follow potable water diving procedures and disinfection requirements prior to any diving occurring in the tank.
Acceptance Criteria: Structural deficiencies (corrosion, cracking, coating failure) beyond manufacturer/AWWA-acceptable thresholds, if present; interior free of sediment beyond a de minimis layer per AWWA guidance; post-cleaning disinfectant residual, bacteriological, and turbidity results meet EPA/DOH potable water standards; hatch, vent, and overflow screening intact and secure.
Documentation: The Contractor shall record on the inspection form the specific readings/observations taken, the acceptance criteria used for comparison, a pass/fail/deficiency determination, and the probable continuance of the current condition until the next tank inspection cycle, consistent with Section N. If the tank was drained for cleaning, the report shall state this explicitly along with the duration of the shutdown.
J.1.11 Documentation of Results For each component in Sections J.1.1–J.1.10, the Contractor shall record on the inspection form: the specific readings/measurements taken, the acceptance criteria used for comparison, a pass/fail/deficiency determination, and the probable continuance of the current condition until the next inspection, consistent with the deliverables described in Section N.
J.2 — Annual Inspection Tasks for future Option Years The following list of tasks shall be included for the option years of this contract.
J.2.1 Pump Control Panel Objective: Validate that the control panel correctly starts, stops, and protects the well head pump based on system demand and safety interlocks.
· Visually inspect enclosure for corrosion, moisture intrusion, rodent/insect intrusion, and door seal integrity.
· Verify motor starter/contactor operation through a manual start/stop cycle; check for contact pitting or chatter.
· Test overload/breaker protection settings against motor nameplate full-load amperage.
· Verify all indicator lights, alarms, and HOA (Hand-Off-Auto) switch functions operate as designed.
· Confirm interlock function with the Well Water Level Control Panel (i.e., panel correctly responds to a simulated low-level or high-level signal).
Acceptance Criteria: No exposed energized conductors; all indicator/alarm functions respond correctly during test; interlock signal produces correct pump response within manufacturer-specified response time; no evidence of thermal damage at terminations.
J.2.2 Well Water Level Control Panel Objective: Validate that well water level sensing and control logic accurately reflects actual well water level and correctly signals the Pump Control Panel.
· Visually inspect enclosure, wiring, and level sensor/transducer cable condition.
· Compare the panel's displayed/logged water level reading against a manual reference measurement (e.g., electronic sounder or calibrated tape) taken at the well head.
· Verify high-level and low-level setpoint alarms trigger at the programmed thresholds by simulating or bracketing the setpoint condition.
· Test communication/signal path to the Pump Control Panel (Section J.1.1) and Water Tower Level Control Panel (Section J.1.8), where applicable, to confirm coordinated system response.
Acceptance Criteria: Displayed level reading within manufacturer-stated accuracy tolerance (or ±5% of span if no manufacturer tolerance is specified) of the manual reference measurement; high/low alarm setpoints trigger within the programmed threshold; signal to Pump Control Panel confirmed functional.
J.2.3 Well Head Pump Objective: Validate that the well head pump delivers rated performance without excessive mechanical wear, and operates safely within its design envelope.
· Inspect motor housing, base, and mounting hardware for corrosion, cracking, or looseness.
· Measure and record vibration at motor bearing points; compare against baseline or ISO 10816 general guidance for the motor's mounting class.
· Listen for abnormal bearing noise, cavitation, or water hammer during a run cycle.
· Inspect all electrical connections, cable entry seals, and (if submersible) cable condition for insulation damage.
· Measure and record motor amperage draw during operation; compare to nameplate FLA.
· Measure discharge pressure and flow rate during a run cycle (using the Well Head Flow Meter, Section J.1.4) and compare to the pump's rated performance curve.
· Inspect check valve function (no backflow/water hammer on pump shutoff).
· Inspect mechanical seal or packing gland (if accessible) for leakage.
Acceptance Criteria: Vibration within acceptable range per ISO 10816 (or manufacturer guidance) for the equipment class; amperage draw within manufacturer tolerance of nameplate FLA; discharge pressure/flow within 10% of the pump's rated performance curve at the tested operating point, or as otherwise specified by manufacturer; no active leakage at seals/glands beyond manufacturer-allowed weepage; no abnormal noise or vibration indicating cavitation or bearing wear.
J.2.4 Well Head Flow Meter Objective: Validate flow measurement accuracy in accordance with AWWA Manual M6.
· Visually inspect meter body, register, and wiring/signal connections for damage or corrosion.
· Compare the meter's instantaneous or totalized reading against an independent reference measurement (e.g., calibrated portable flow meter, pump curve cross-check, or volumetric/time test where feasible) per AWWA Manual M6 guidance.
· Check meter register visibility and confirm no evidence of tampering, fogging, or mechanical binding.
Acceptance Criteria: Measured accuracy within AWWA Manual M6-recommended tolerance for the meter type and size (typically ±1.5% for accuracy testing of positive displacement/turbine meters, per AWWA M6 — Contractor to confirm applicable tolerance for the specific meter type installed); no physical damage affecting measurement integrity.
J.2.5 Chlorination System (On-Site Electrolytic Hypochlorite Generation Unit) Objective: Validate that the generation unit is producing sodium hypochlorite at the correct concentration and injecting it at the correct rate to maintain required disinfection residual, and that the unit is operating safely.
· Inspect brine tank/salt storage for structural integrity, corrosion, and proper salt saturation level per manufacturer specification.
· Inspect electrolytic cell(s) for scale buildup, electrode condition, and cell housing integrity; perform manufacturer-recommended cell cleaning/descaling.
· Verify generation unit output concentration (percent available chlorine) using a calibrated test method (e.g., titration) and compare to manufacturer's rated output.
· Verify injection pump/metering system delivers the calibrated dose rate; check for leaks, air-lock, or tubing degradation.
· Measure free and total chlorine residual at a representative point in the distribution system and compare against the system's target residual range and the EPA minimum residual requirement under 40 CFR Part 141, Subpart H.
· Inspect and test automatic controller/dosing logic (if equipped) for correct response to flow or residual feedback signals.
· Verify hydrogen off-gas fan interlock: confirm the generation unit is designed/programmed to alarm or shut down if off-gas ventilation fails (see Section J.1.6).
Acceptance Criteria: Output concentration within manufacturer-rated tolerance; injection/dosing rate produces distribution system residual within the target range and above the EPA minimum residual requirement; no active leaks; off-gas fan interlock/alarm confirmed functional.
J.2.6 Chlorine Tanks and Off-Gas Fans (Salt/Brine Storage and Hydrogen Ventilation) Objective: Validate that hydrogen byproduct gas is being safely vented to prevent accumulation to hazardous concentrations, and that salt/brine storage is structurally sound.
· Inspect brine/salt storage tank(s) for corrosion, cracking, leakage, and secondary containment integrity.
· Inspect off-gas fan(s) for correct operation, airflow direction, and unobstructed intake/exhaust pathways.
· If a hydrogen gas detector is installed, verify calibration and alarm setpoint function per manufacturer specification.
Acceptance Criteria: Off-gas fan(s) operate correctly with an unobstructed airflow path and no signs of ventilation restriction; no active leakage from brine/salt storage; hydrogen detector (if equipped) calibrated and alarms at correct setpoint.
J.2.7 Overflow Pump Objective: Validate that the overflow pump activates correctly to prevent uncontrolled water tower overflow and operates without excessive wear.
· Inspect motor, mounting, and electrical connections for corrosion or damage.
· Measure vibration and amperage draw during a test run cycle; compare to nameplate FLA and baseline/ISO 10816 guidance as in Section J.1.3.
· Verify activation setpoint triggers pump start at the correct level.
· Confirm discharge path is clear and directs overflow to the intended location without creating a cross-connection or backflow hazard.
· Inspect check valve (if equipped) for proper function.
Acceptance Criteria: Pump activates within the programmed high-level setpoint tolerance; amperage/vibration within nameplate/ISO 10816 tolerance; discharge path confirmed clear and free of cross-connection hazards.
J.2.8 Water Tower Level Control Panel Objective: Validate accurate water level sensing in the water tower and correct signaling to the Water Tower Mixer Pump, Overflow Pump, and well/pump control system.
· Visually inspect enclosure, wiring, and level sensor/transducer condition.
· Compare the panel's displayed/logged water level reading against a manual or independent reference measurement (e.g., pressure transducer cross-check or physical tank gauge, per AWWA Manual M42 guidance for steel water-storage tank instrumentation).
· Verify high-level, low-level, and overflow setpoint alarms trigger at programmed thresholds.
· Test signal/communication path to the Overflow Pump (Section J.1.7), Water Tower Mixer Pump (Section J.1.9), and well system controls (Section J.1.2) to confirm coordinated response.
· Ensure that panel contains the most up to date software that can be installed.
Acceptance Criteria: Displayed level reading within manufacturer-stated accuracy tolerance (or ±5% of span if unspecified) of the reference measurement; all setpoint alarms trigger within programmed threshold; confirmed signal continuity to all dependent equipment; panel software/firmware is at the most current version available from the manufacturer, or a documented reason is provided if an update cannot be applied.
J.2.9 Water Tower Mixer Pump Objective: Validate that the mixer pump adequately circulates water tower contents to prevent thermal stratification and disinfectant residual loss, per AWWA Manual M42 guidance, and operates without excessive mechanical wear.
· Inspect motor, propeller/impeller assembly, mounting, and electrical connections for corrosion, damage, or biofouling.
· Measure vibration and amperage draw during a test run cycle; compare to nameplate FLA and baseline/ISO 10816 guidance as in Section J.1.3.
· Verify mixer cycling logic/timer (if equipped) operates per the intended duty cycle.
· Verify or estimate mixing effectiveness through temperature stratification check at multiple tank elevations, or chlorine residual comparison between top and bottom sample points, consistent with AWWA M42 water quality guidance.
Acceptance Criteria: Amperage/vibration within nameplate/ISO 10816 tolerance; cycling logic operates per design; no significant temperature or residual stratification identified between sample points (variance beyond what is typical for the tank's size/turnover rate should be documented as a deficiency for further evaluation).
J.2.10 Documentation of Results For each component in Sections J.2.1–J.2.9, the Contractor shall record on the inspection form: the specific readings/measurements taken, the acceptance criteria used for comparison, a pass/fail/deficiency determination, and the probable continuance of the current condition until the next inspection, consistent with the deliverables described in Section N.
J.3.1 Cathodic Protection System Inspection (Option Year 3) Objective: Only during option year 3, validate that the water tower's cathodic protection system (galvanic and/or impressed current) provides adequate corrosion protection to the tank structure.
Tasks:
· System Type Identification:
· Sacrificial anode (galvanic) system, if present
· Impressed current system (ICCP), if present
· Anodes:
· Anode material and condition
· Percentage of anode consumed
· Anode attachment points
· Rectifier & Power Supply (ICCP only):
· Rectifier output voltage and current readings
· Rectifier housing condition
· Circuit breakers/fusing
· Timer or automatic controller function, if equipped
· Reference Electrodes / Test Stations:
· Permanent reference electrodes
· Structure-to-electrolyte potential readings at multiple points in the tank
· Test lead wires
· Wiring & Connections:
· Continuity of all CP wiring
· Wire insulation condition
· Junction box/terminal condition
· Cathodic isolation at dissimilar metal connections
· Performance Data / Readings to Document:
· Structure potential readings (mV) at time of inspection, compared against NACE/AMPP SP0388 criteria for adequate protection
· Current output (amps) for impressed systems
· Any "hot spots" or areas of inadequate protection identified
· Coating Interaction:
· Cross-reference coating breakdown/holidays with CP readings
· Service Continuity: The tank shall remain filled and in service during the CP inspection. If any task cannot be performed with water in the tank, the Contractor shall notify the COR prior to scheduling, consistent with Section F.
· Diving Requirements: Potable water diving procedures and disinfection requirements shall be followed prior to any diving in the tank. Water quality samples for coliforms and heterotrophic bacteria shall be taken after the inspection to confirm the water remains fit for system use.
Acceptance Criteria: Structure-to-electrolyte potential readings meet NACE/AMPP SP0388 criteria for adequate cathodic protection at all tested points; no "hot spots" or areas of inadequate protection identified without a documented corrective recommendation; rectifier (if present) operating within manufacturer-rated output; all wiring/connections continuous with no insulation damage.
J.3.2 Documentation of Results For the tasks in Section J.3.1, the Contractor shall record on the inspection form: the specific readings/observations taken, the acceptance criteria used for comparison, a pass/fail/deficiency determination, and the probable continuance of the current condition until the next CP inspection cycle, consistent with Section N.
K. Applicable Publications The publications listed below shall be followed when engaging in work required by this contract. Only the codes and standards relevant to this system are cited; the most current edition of each shall apply.
· Washington Administrative Code (WAC):
· WAC 246-290 — Public Water Supplies (Group A systems)
· WAC 246-292 — Certification of Water System Operators
· WAC 173-160 — Minimum Standards for Construction and Maintenance of Wells (Department of Ecology)
· WAC 173-360A-0430 — Operation and maintenance of corrosion protection
· WAC 173-360A-0940 — Responsibilities of Service Providers
· Revised Code of Washington (RCW):
· RCW 70A.100 — Public Water System Coordination Act
· RCW 18.104 — Water Well Construction Act
· U.S. Environmental Protection Agency (EPA):
· 40 CFR Part 141 — National Primary Drinking Water Regulations, including Subpart H (Filtration and Disinfection) as applicable to the on-site hypochlorite generation system's disinfection function
· Occupational Safety and Health Administration (OSHA):
· 29 CFR 1910.146 — Permit-Required Confined Spaces
· OSHA 29 CFR 1910 Subpart T — Commercial Diving Operations
· American Water Works Association (AWWA):
· AWWA C651 — Disinfecting Water Mains
· AWWA C652 — Disinfection of Water-Storage Facilities
· AWWA C654 — Disinfection of Wells
· AWWA Manual M6 — Water Meters
· AWWA Manual M20 — Water Chlorination/Chloramination Practices and Principles
· AWWA Manual M42 — Steel Water-Storage Tanks
· ANSI/AWWA D101-53(R86) — Inspecting and Repairing Steel Water Storage Tanks
· ANSI/AWWA D102 — Painting and Inspecting Steel Water Storage Tanks
· AWWA C652-92 — Disinfection of Water Storage Facilities
· ANSI/AWWA D130-97(M25) — Maintenance of Flexible Membrane Covers and Linings
· ASTM D3359-92a — Testing of Coating Adhesion to Metallic Substrates
· AWWA D104-11 / ANSI/AWWA D104-91(C) — Inspection of Impressed Current Cathodic Protection Systems
· National Institute for Occupational Safety and Health
· NIOSH 87-113 — Confined Air Space Regulations
· National Sanitation Foundation
· NSF 60/61 — Approved For Use in, or in contact with, Potable Water
· National Association of Corrosion Engineers for Corrosion Expert
· NACE/AMPP SP0388 — Impressed Current Cathodic Protection of Internal Submerged Surfaces of Carbon Steel Water Storage Tanks.
L. Period of Performance and Contract Structure This contract consists of a Base Year plus four (4) One-Year Option Periods (Base + 4). Each period of performance (base and each exercised option year) includes annual inspections and access to the Maintenance Rider described in Section M. The below table clarifies what services are expected during each option year.
| Period of Performance |
| Contract Year |
| Expanded Inspection Services - J.1 |
| Base Inspection Services - J.2 |
| Tank Inspection/Cleaning – J.10 |
| CP Inspection – J.3 |
| 2027 |
| Base Year |
| ✓ |
| ✓ |
| ✓ |
| — |
| 2028 |
| Option Year 1 |
| — |
| ✓ |
| — |
| — |
| 2029 |
| Option Year 2 |
| — |
| ✓ |
| — |
| — |
| 2030 |
| Option Year 3 |
| — |
| ✓ |
| — |
| ✓ |
| 2031 |
| Option Year 4 |
| — |
| ✓ |
| — |
| — |
M. Maintenance Rider — Urgent and Non-Urgent Repairs The requirement includes a Time-and-Material (T&M) line item, under a single CLIN per period of performance (see Section L) for both Urgent and Non-Urgent Repairs, for the water system equipment listed in Section D. This line item shall not be used for the annual inspection deliverable or any re-work/correction due to the Contractor's deficiencies on that scheduled item.
The labor rate shall be a flat, hourly rate to cover the entire effort and shall be burdened consistent with the direct/non-production labor structure below:
· Direct production labor hour functions only. Direct production is work performed by a qualified craftsman directly related to the alteration, modification, or repair of the identified equipment, including pump service technicians, water control systems technicians, chlorination systems technicians, and/or skilled or general laborers.
· Non-production labor hours shall be priced into the burdened rate for production labor, and include functions such as testing, quality assurance, engineering support, planning, estimating, material handling, set-up, general labor, cleaning, transportation, and supervision.
· This section also applies to any Subcontractor labor hours used. Markup material rates may not be used on subcontractor labor hours.
Urgent Repairs: Upon COR notification of an urgent repair, the Contractor shall respond within twenty-four (24) hours to resolve.
· No travel reimbursement is authorized. Labor hours are based on time of check-in/check-out of each technician at the facility, which is mandatory.
· For urgent repairs specifically, Not to Exceed (NTE) for labor hours is two (2) hours per event unless approved by the CO or COR in advance. If approval was not received in advance, the Contractor shall only charge two (2) hours on invoicing. There is no NTE for materials.
· These statements are not to be construed as the Contractor's approval to exceed the line item ceiling price.
Non-Urgent Repairs: Upon request and approval of the COR, the Contractor shall perform non-urgent repairs to the equipment listed in Section D, following applicable codes cited in Section K. The COR will provide an initial Condition Found Report (CFR), in Appendix A, with general details for the Contractor to complete.
· The COR will communicate whether normal and/or after-hours work is required for each request. See Section G for hours.
· If normal work hours are requested and the Contractor chooses to begin work before or after hours, only the normal work hour rate shall be invoiced. Advance COR approval is required to use the after-hours rate.
· No travel reimbursement is authorized. Labor hours are based on time of check-in/check-out of each technician at the facility, which is mandatory.
Upon receipt of a CFR, the Contractor shall submit the following to the COR before work is approved to begin:
· Contractor information, including Contractor POC and contact information.
· Location and equipment information for the deficiency.
· Information explaining the deficiency.
· Recommendation for repair, replacement, or no action.
· Detailed scope breakdown, including labor (direct production hours by category, straight time/overtime), materials (bill of materials with description, quantity, and source), and subcontractor involvement (individually identified, with a scope of work and confirmation that a quote has been obtained where applicable — no lump sums, including subcontractor lump sums). Pricing for labor, materials, and subcontractor costs shall be applied per the rates and terms established in the negotiated contract and is not required to be estimated in dollar terms within the CFR itself.
· Name and signature of the Contractor employee submitting the CFR to the Government.
CFR information provided directly to the Government from a subcontractor will not be considered and constitutes a contract discrepancy. After approval, the Contractor shall respond within 24 hours when parts are on hand to fix the found condition. If parts are not on hand, the Contractor shall respond within 48 hours unless otherwise approved by the COR. If actual work exceeds the CFR estimate by more than 5%, the Contractor shall notify and receive approval from the COR to continue.
Invoicing Procedures The Contractor shall submit documentation to the COR showing a completed CFR (non-urgent requirements only) and a complete invoice breakdown of work actually performed, including task description, location, day/time of hours worked, number of hours worked, normal/after-hours rate, itemized materials with markup, and subcontractor breakdown with markup as applicable. All material pricing must be supported with separate receipt copies. The Contractor is responsible for tracking and certifying that all labor hours are true and correct at submission.
The Government has the right to reject any incomplete, inaccurate, or lump-sum labor/material pricing breakdowns and to audit the Contractor's submission. The Contractor shall provide any necessary corrections within 10 business days and resubmit. In the event of a lack of consensus on documentation that cannot be resolved between the COR and Contractor, the Contracting Officer shall review all documentation and make the final decision.
The Contractor shall not exceed the ceiling price on this CLIN except at its own risk, and shall monitor T&M usage and report to the COR when additional funding may be required for future urgent and non-urgent repairs.
N. Deliverables
· Written condition assessment following each annual inspection, addressing each item in Section D.
· Photographs of the condition of each inspected system/component.
· List of corrective actions and recommendations following each inspection.
· All inspection and repair documentation provided to the COR for provision to the current water system operator (Valley Water Services).
O. Water System Operability The Contractor shall ensure the water system remains operable at all times except while being tested or repaired, consistent with the shutdown notification requirement in Section F. The Contractor shall coordinate with the COR to confirm the backup City of Walla Walla connection is available and adequate to cover the duration of any planned shutdown of well, pump, or water tower equipment.
P. Damage to Water System Any damage to the water system or associated equipment caused by the Contractor during inspection, testing, or repair shall be repaired by the Contractor at no additional cost to the Government. The Contractor shall be liable for all costs associated with such damage. At its discretion, the Government may have representatives present to witness any or all such work.
Q. Standards and Qualifications
· Certified Water Well Inspector. Contractor personnel performing well inspection work shall hold a current Washington State Well Driller/Operator license issued by the Department of Ecology under RCW 18.104 and WAC 173-160.
· Pump Service Technician. Contractor personnel performing pump service work shall hold a current Washington State Pump Installer license issued by the Department of Ecology under RCW 18.104 and WAC 173-160, or equivalent manufacturer certification for the specific pump equipment installed at WWVAMC.
· Water Control Systems Technician. Contractor personnel performing work on control panels (pump control, well water level control, water tower level control) shall hold a current Washington State Water Distribution Manager (WDM) certification issued by DOH under WAC 246-292, at the level appropriate to the WWVAMC system classification.
· Chlorination Systems Technician. Contractor personnel performing work on the on-site hypochlorite generation system shall hold a current Washington State Water Treatment Plant Operator (WTPO) certification issued by DOH under WAC 246-292, at the level appropriate to the WWVAMC…