S02 Drawings - Boise VAMC Biomed HVAC - CD Set.pdf

PDF 3 MB Posted

Attached to
Y1DA--531-24-107 | Install New HVAC System Biomed Boise VAMC
Solicitation number
36C26025R0066
Issued by

About this file

These are architectural and engineering drawings for a mechanical systems upgrade project at the Boise Veterans Affairs Medical Center (VAMC) Biomedical Building, specifically detailing HVAC system renovations. The comprehensive drawing set (designated 531-24-107) includes multiple sheets covering mechanical demolition plans, new mechanical system layouts, energy compliance calculations, mechanical schedules, control schematics, and electrical power and distribution plans for Building 27. Key technical elements include installing new multi-port heat pump systems with indoor and outdoor units, an energy recovery unit, and associated ductwork, electrical infrastructure, and control systems. The drawings are dated 05 MAR 2025 and prepared at 100% Construction Document (CD) stage, indicating the project is in final design preparation prior to construction bidding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- El ec C en tra l.r vt

3/ 5/

2:

:3

PM

CS001

COVER SHEET Boise VAMC BIOMED

05 MAR 2025 WNF PMS

100% CD

SHEET INDEX

SHEET NUMBER SHEET NAME

CS001 COVER SHEET

M001 MECHANICAL COVER SHEET

M002 ENERGY COMPLIANCE & MECHANICAL LOAD CALCS

M100 MECHANICAL DEMOLITION PLAN

M101 MECHANICAL NEW PLAN

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 MECHANICAL CONTROLS

EE001 ELECTRICAL COVER SHEET

EE701 TYPICAL MOUNTING DETAILS

EE702 TYPICAL LABELING DETAILS

ED101 LEVEL 1 ELECTRICAL DEMOLITION PLAN

EP100 OVERALL POWER PLAN - FOR REFERENCE ONLY

EP101 LEVEL 1 POWER PLAN

EP601 ONE-LINE DIAGRAM & ELECTRICAL SCHEDULES

DIRECTOR

ASSOCIATE DIRECTOR / ADMINISTRATIVE OPERATIONS

CHIEF OF STAFF

ASSOCIATE DIRECTOR / PATIENT SERVICES

ASSOCIATE DIRECTOR / CLINICAL OPERATIONS

FINANCIAL MANAGEMENT SERVICE

Boise VAMC BIOMEDBoise VAMC BIOMED 531-24-107531-24-107

DEPARTMENT OF VETERANS AFFAIRS BOISE VAMC

500 W FORT ST

BOISE, ID 84702

100% CD

05 MAR 2025

SCALE: NTS

SITE PLAN1

NORTH

Revisions: Date:

03/05/2025

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M001

MECHANICAL COVER SHEET Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

ABBREVIATIONS

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

(E) EXISTING

(F) FUTURE

AC AIR CONDITION(-ING,-ED)

APD AIR PRESSURE DROP

BD BALANCING DAMPER

BHP BRAKE HORSE POWER

BTU BRITISH THERMAL UNIT

BTUH BTU/HOUR

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CV CONTROL VALVE

DB DRY BULB TEMPERATURE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RECIRC

DP DEPTH, DEEP, OR DROP IN PRESSURE

EA EXHAUST AIR

EER ENERGY EFFICIENCY RATIO

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

ENT ENTERING

EVAP EVAPORAT(-E, -ING, -ED, -OR)

EWT ENTERING WATER TEMPERATURE

EXT EXTERNAL

FD FIRE DAMPER

FLA FULL LOAD AMPS

FPI FINS PER INCH

FPM FEET PER MINUTE

FPS FEET PER SECOND

FSD FIRE SMOKE DAMPER

GE GREASE EXHAUST

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HD HEAD

HG MERCURY

HP HORSEPOWER

HR HOUR

HTG HEATING

HZ HERTZ (FREQUENCY)

IN INCH

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LH LATENT HEAT

LRA LOCKED ROTOR AMPS

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MBH THOUSAND BTU PER HOUR

MCA MINIMUM CIRCUIT AMPS

MFR MANUFACTUR(-ER, -ED)

NC NORMALLY CLOSED OR NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

OZ OUNCE

PD PRESSURE DROP OR DIFFERENCE

PG PROPOLENE GLYCOL

PH PHASE

PPM PARTS PER MILLION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSIA PSI ABSOLUTE

PSIG PSI GAUGE

RA RETURN AIR

RECIRC RECIRCULATE (-ER, -ED, -ING)

REFR REFRIGERATION

REQD REQUIRED

RLA RATED LOAD AMPS

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SCFM STANDARD CUBIC FEET PER MINUTE

SCW SOFT COLD WATER

SH SENSIBLE HEAT

SP STATIC PRESSURE

SPEC(S) SPECIFICATION(S)

SQ SQUARE

SS SANITARY SEWER, SOIL, WASTE

STD STANDARD

TA TRANSFER AIR

TD TEMP. DROP OR DIFF.

TEMP TEMPERATURE

TOT TOTAL

TSTAT THERMOSTAT

TYP TYPICAL

V VOLT, VOLTAGE OR VENT

VAC VACUUM

VAV VARIABLE AIR VOLUME

VEL VELOCITY

VENT VENT, VENTILATION

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VTR VENT THROUGH ROOF

WB WET BULB TEMP

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DROP

WTR WATER

SHUT OFF VALVE

SYMBOL LEGEND - PIPING

DESCRIPTIONSYMBOL

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

GATE VALVE

CHECK VALVE

AUTOMATIC 2-WAY VALVE

AUTOMATIC 3-WAY VALVE

GLOBE VALVE

BALL VALVE

RELIEF VALVE

PRESSURE REDUCING VALVE

BUTTERFLY VALVE

SOLENOID VALVE

ANGLE VALVE

S

VENTURI VALVE

BALANCING OR PLUG COCK

FLOW SETTER

EXPANSION VALVE

GAS COCK

MAV MANUAL AIR VENT

STRAINER

GAUGE COCK

FLEXIBLE CONNECTION

PRESSURE GAUGE

THERMOMETER

PIPE REDUCER

REFRIGERANT SITE GLASS

REFRIGERANT STRAINER

90 DEGREE ELBOW UP

90 DEGREE ELBOW DOWN

90 DEGREE TEE UP

90 DEGREE TEE DOWN

PIPE UNION

PIPE CAP

PIPE ANCHOR

FLOAT AND THERMOSTATIC TRAP

REFRIGERANT FILTER DRIER

SYMBOL LEGEND - DUCTWORK

DESCRIPTION

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

RECTANGULAR SUPPLY DUCT UP

RECTANGULAR SUPPLY DUCT DOWN

RECTANGULAR RETURN DUCT UP

RECTANGULAR RETURN DUCT DOWN

RECTANGULAR EXHAUST DUCT UP

RECTANGULAR EXHAUST DUCT DOWN

ROUND SUPPLY DUCT UP

ROUND SUPPLY DUCT DOWN

ROUND RETURN DUCT UP

ROUND RETURN DUCT DOWN

ROUND EXHAUST DUCT UP

ROUND EXHAUST DUCT DOWN

OVAL SUPPLY DUCT UP

OVAL SUPPLY DUCT DOWN

OVAL RETURN DUCT UP

OVAL RETURN DUCT DOWN

OVAL EXHAUST DUCT UP

OVAL EXHAUST DUCT DOWN

SPIRAL OVAL DUCT

SPIRAL ROUND DUCT

DUCT INSULATION

DUCT LINING

90° RECTANGULAR ELBOW

WITH TURNING VANES

90° ROUND RADIUS ELBOW

GORED OVAL RADIUS ELBOW

DUCT SIZE OR SHAPE TRANSITION

SYMBOL

PIPING LEGEND

DESCRIPTIONABBREVIATION

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

FIRE PROTECTION

HEATING HOT WATER SUPPLY

HEATING HOT WATER RETURN

NITROUS OXIDE

REFRIGERANT LIQUID

REFRIGERANT GAS

SNOW MELT RETURN

SNOW MELT SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMPRESSED AIR

CONDENSATE DRAIN

GLYCOL SUPPLY

GLYCOL RETURN

MEDICAL AIR

LIQUID PROPANE GAS

NATURAL GAS

OXYGEN

VACUUM

CHWR

CHWS

CA

CD

CWR

CWS

FP

GR

GS

HHWR

HHWS

LPG

MA

NG

NO

O

RL

RG

SMR

SMS

VAC

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FOR

FOS

FOV

MEDIUM PRESSURE CONDENSATE

HIGH PRESSURE CONDENSATEHPC

MPC

HIGH PRESSURE STEAM

LOW PRESSURE CONDENSATELPC

HPS

LOW PRESSURE STEAM

MEDIUM PRESSURE STEAMMPS

LPS

PUMPED CONDENSATEPC

SYMBOL LEGEND - MISC

DESCRIPTIONSYMBOL

VIEW OR DETAIL INDICATOR: # INDICATES DETAIL NUMBER,

SHEET INDICATES DRAWING SHEET WHERE VIEW OR DETAIL

IS SHOWN.

REFERENCE LINES AND SYMBOLS

ELEVATION OR SECTION INDICATOR: # INDICATES VIEW

NUMBER, SHEET INDICATES DRAWING SHEET WHERE VIEW IS

SHOWN.

NAME

### ROOM / SPACE INDICATOR

# KEYNOTE INDICATOR

# REVISION INDICATOR

XX-##

XX-##

TAG

CFM

PLUMBING FIXTURE INDICATOR

EQUIPMENT INDICATOR

REGISTER, GRILLE, OR DIFFUSER INDICATOR

BREAKLINE

MATCHLINE INDICATOR

CONTRACT LIMIT LINE: DASHDOT, WIDE LINE

NEW CONNECTION TO EXISTING

POINT OF DEMOLITION

OR

MATCH LINE

SEE XX/XXX

SQUARE OR RECTANGULAR

SUPPLY DIFFUSER

SYMBOL LEGEND - MECH

DESCRIPTIONSYMBOL

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

DUCT HIGH EFFICIENCY TAKE OFF

WITH BALANCING DAMPER

SQUARE OR RECTANGULAR

RETURN DIFFUSER

SQUARE OR RECTANGULAR

EXHAUST DIFFUSER

ROUND DIFFUSER

SIDEWALL GRILLE OR REGISTER

BALANCING DAMPER

FIRE DAMPER

FIRE / SMOKE COMBINATION

DAMPER

LINEAR SLOT GRILLE OR DIFFUSER

FLEXIBLE DUCT

C02 CARBON DIOXIDE

T S H THERMOSTAT - SENSOR - HUMIDISTAT

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

THE MECHANICAL DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENT,

& EXTENT OF THE MECHANICAL SYSTEM. BECAUSE OF THE SMALL SCALE OF

THE DRAWINGS, THESE DRAWINGS DO NOT SHOW ALL OFFSETS, BENDS, OR

ELBOWS NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE

PROVIDED. CONTRACTOR SHALL MAKE ALTERATIONS AS MAY BE

NECESSARY TO MAKE THE SYSTEM COMPLETE & OPERATIONAL IN

ACCORDANCE WITH THE DESIGN INTENT.

MAJOR DEVIATIONS SUCH AS CHANGES IN SIZES, WEIGHTS, QUANTITIES, OR

MATERIAL REQUIRE PRIOR APPROVAL BY THE DESIGN ENGINEER.

THE DRAWINGS & SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT

EACH OTHER & SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE

ITEMS SHOWN ON ONE & NOT THE OTHER BEING FURNISHED & INSTALLED

AS THOUGH SHOWN AND CALLED OUT IN BOTH DOCUMENTS.

THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO THE

REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODES,

MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, & ALL OTHER

APPLICABLE CITY, COUNTY, STATE, & FEDERAL CODES & REGULATIONS IN

EFFECT.

THE ENTIRE MECHANICAL INSTALLATION SHALL CONFORM TO ALL CODES,

RULES, REGULATIONS, & REQUIREMENTS OF THE BUILDING OWNER.

ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED TO

CONFORM WITH ANY APPLICABLE LOCAL SEISMIC REQUIREMENTS.

PRIOR TO FABRICATION & INSTALLATION OF ANY MECHANICAL COMPONENT

THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL

MECHANICAL WORK WITH ALL OTHER BUILDING TRADES, INCLUDING

BUILDING TRADES HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS

MAY OCCUR, THEY SHALL BE RESOLVED PRIOR TO INSTALLATION.

VERIFY ALL REQUIRED SERVICE CONNECTIONS, INCLUDING ELECTRICAL

CHARACTERISTICS, FOR ALL EQUIPMENT PRIOR TO ORDERING OR

FABRICATING MECHANICAL EQUIPMENT AND COMPONENTS.

THE SPACE ABOVE CEILINGS IS LIMITED. CAREFUL COORDINATION IS

REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS

ORDERED &/OR INSTALLED. ANY CONFLICTS &/OR CHANGES FOUND DURING

INSTALLATION THAT RESULTS FROM THE LACK OF COORDINATION BY THE

CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE

RESPONSIBILITY OF THE CONTRACTOR.

ALL MECHANICAL INFORMATION IS NOT SHOWN ON THE MECHANICAL

DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION

OF ALL INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS.

THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW & USE, WHERE

APPROPRIATE, ALL THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS.

DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH

SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO

INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

ALL EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM

STRUCTURAL MEMBERS. STRUCTURAL ELEMENTS SHOWN IN DETAILS MAY

OR MAY NOT PERTAIN TO ANY PORTION OF THE BUILDING. COORDINATE ALL

MOUNTING REQUIREMENTS WITH ARCHITECTURAL & STRUCTURAL

DRAWINGS AND SPECIFICATIONS.

ALL MECHANICAL COMPONENTS AND EQUIPMENT SHALL BE INSTALLED IN

ACCORDANCE WITH ALL MANUFACTURER RECOMMENDATIONS.

ALL SIMILAR EQUIPMENT SHALL BE OF THE SAME MANUFACTURER. AIR

INLETS & OUTLETS OF SIMILAR TYPES SHALL BE OF THE SAME

MANUFACTURER.

ANY PART OF THE MECHANICAL INSTALLATION THAT FAILS, IS DEEMED

UNFIT, OR BECOMES DAMAGED DURING CONSTRUCTION SHALL BE

REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO

THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EQUIPMENT

CHECK-IN, SAFEKEEPING, & DAMAGE.

COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT

LOCATION OF ALL CEILING DIFFUSERS & GRILLES.

CONTRACTOR SHALL OPERATE INSTALLED &/OR MODIFIED SYSTEMS &

DEMONSTRATE ALL ASPECTS OF THE SYSTEM TO THE ENGINEER &/OR

OWNER TO PROVE ALL ASSOCIATED SYSTEMS ARE OPERATIONAL.

DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN A SET OF AS-

BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES

OR DEVIATIONS IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, &

ACCESSORIES SHALL BE RECORDED. THESE REDLINED DRAWINGS SHALL

BE GIVEN TO THE ARCHITECT / ENGINEER AFTER THE FINAL INSPECTION IN

ACCORDANCE WITH PROJECT SPECIFICATIONS.

ALL DUCT ELBOWS SHALL BE LONG RADIUS, UNLESS NOTED OTHERWISE.

VA WILL SHUT DOWN EXISTING UTILITY SYSTEM AS NECESSARY FOR

CONTRACTOR TO PERFORM REQUIRED WORK. CONTRACTOR IS

RESPONSIBLE FOR DRAINING EXISTING WET SYSTEMS, SUCH AS WATER,

CHILLED WATER, HEATING WATER ETC. AS REQUIRED TO ACCOMPLISH NEW

WORK. CONTRACTOR IS ALSO RESPONSIBLE FOR RE-FILLING SYSTEMS

INCLUDING ADDING CHEMICAL AS REQUIRED. IT IS ACCEPTABLE TO

SALVAGE EXISTING TREATED WATER IN CLEAN STORAGE CONTAINERS

APPROVED BY THE VA, AND RE-INJECT IT INTO THE SYSTEM UPON

COMPLETION OF WORK. ANY TREATED WATER NOT RE-INJECTED IS TO BE

PROPERLY DISPOSED OF.

MECHANICAL GENERAL NOTES

DUCT TO BE DEMOLISHED

Revisions: Date:

MECHANICAL SHEET INDEX

M001 MECHANICAL COVER SHEET

M002 ENERGY COMPLIANCE & MECHANICAL LOAD CALCS

M100 MECHANICAL DEMOLITION PLAN

M101 MECHANICAL NEW PLAN

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 MECHANICAL CONTROLS

DEFINITIONS

NOTE: ALL DEFINITIONS MAY NOT BE USED.

INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,

NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR

SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE

CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",

"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE

THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.

DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",

"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY

THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.

APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE

ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND

REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS

STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.

FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO

THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,

INSTALLATION, AND SIMILAR OPERATIONS."

INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT

SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,

PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING,

PROTECTING, CLEANING, AND SIMILAR OPERATIONS."

PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE

AND READY FOR THE INTENDED USE."

INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY

THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-

SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION

ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR

OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE

OPERATIONS THEY ARE ENGAGED TO PERFORM.

2025.03.04

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M002

ENERGY COMPLIANCE &

MECHANICAL LOAD CALCS

Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

G07

4 4 4

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M100

MECHANICAL DEMOLITION PLAN Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

SCALE: 1/2" = 1'-0"1 MECHANICAL DEMOLITION PLAN

SHEET KEYNOTES

1 DEMOLISH AND DISPOSE OF EXISTING FAN COIL UNIT. DEMOLISH HYDRONIC

PIPING BACK TO MAIN AND CAP. DEMOLISH ALL EXISTING CONTROL WIRING AND

ASSOCIATED ACCESSORIES.

2 DEMOLISH AND DISPOSE EXISTING FAN.

3 DEMOLISH AND DISPOSE EXISTING PTAC UNIT. PROVIDE NEW WINDOW MATCHING

EXISTING.

4 DEMOLISH EXISTING RADIANT PANEL AND ASSOCIATED HYDRONIC PIPING BACK

TO MAIN AND CAP. RETURN RADIANT PANEL AND ASSOCIATED VALVES(S),

CONTROLS/CONTROL WIRING, AND ACCESSORIES BACK TO OWNER.

NORTH

Revisions: Date:

MECHANICAL GENERAL NOTES

1. ALL EQUIPMENT TO BE SELECTED BASED OFF OF SITE INFORMATION, INCLUDING

CURBS EQUAL TO OR GREATER THAN DESIGN SNOW DEPTH. ELEVATION: SDB:

SWB: WDB:

2. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING

WITH ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.

3. ALL LOW PRESSURE RECTANGULAR DUCTWORK TO BE LINED WITH INSULATION

WITH AN R-VALUE OF R-6. ALL LOW PRESSURE ROUND DUCTWORK TO BE WRAPPED

WITH INSULATION WITH AN R-VALUE OF R-6. NO DUCT LINER IN OUTSIDE AIR

DUCTWORK OR DUCTWORK WITH IN DUCT HUMIDIFIERS.

4. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

5. GRILLES AND DUCTWORK ARE SIZED INDEPENDENTLY. THE NECK SIZE OF GRILLES

MAY NOT MATCH THE ASSOCIATED DUCT SIZE. PROVIDE TRANSITION TO GRILLES

AS NECESSARY.

6. PROVIDE BALANCING DAMPER WITH LOCKING QUADRANT IN EACH DUCT BRANCH

OF SUPPLY AND EXHAUST DUCTWORK.

7. COORDINATE EXACT THERMOSTAT LOCATIONS WITH FURNITURE AND OWNER.

FAILURE TO DO SO MAY REQUIRE MOVING THERMOSTATS AT CONTRACTORS COST.

8. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE

RESPONSIBILITY OF THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM

TO THE FOLLOWING ELECTRICAL SPECIFICATIONS; HANGERS AND SUPPORTS FOR

ELECTRICAL SYSTEMS, RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS AND

SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.

9. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO

ORDERING OR FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR

CONTRACTOR'S FAILURE TO BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.

10. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING

STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR

COMMUNICATION TO BMS.

11. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF

CERTIFICATE OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO

ENGINEER FOR REVIEW. O&M'S SHALL INCLUDE DOCUMENTATION OF ALL

WARRANTIES, REPORTS AND TESTS, RECORD DRAWINGS, CONTROLS SEQUENCE

OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT INFORMATION. EQUIPMENT

INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING, STARTUP, SHUTDOWN,

TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL COMMISSIONING REPORT

AND MAINTENANCE PROCEDURES.

S

ERU-2

VRF-3

12"x6" OA

12"x6" RA

12"x6" SA 12"x6" EA

G07

L-1

L-1

D-1

CAS-17

CAS-16

CAS-18

3/4"ø CD DN

3/4"ø CD DN

1 1/2"ø V DN

1 1/2"ø V

HD

3/4"ø CD 3/4"ø CD

3/4"ø CD

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M101

MECHANICAL NEW PLAN Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

SCALE: 1/2" = 1'-0"1 MECHANICAL NEW PLAN

NORTH

SHEET KEYNOTES

1 ALL CHILLER OR CONDENSING UNIT COILS ARE TO BE COMPLETELY PROTECTED

USING AIR INTAKE FILTRATION SCREENS SPECIFICALLY DESIGNED FOR

COTTONWOOD FILTRATION. THE SCREENS SHALL BE EASILY REMOVABLE WITH

QUARTER TURN CONNECTIONS. THE SCREEN SHALL NOT VOID THE WARRANTY

OF THE ORIGINAL EQUIPMENT MANUFACTURER. THE SCREENS SHALL HAVE A

STATIC PRESSURE DROP LESS THAN 0.1 INCHES OF WATER GAGE, BE UV

RESISTANT, FLAME RESISTANT, NON-ELECTRO STATIC, AND MOLD AND MILDEW

RESISTANT. THE FILTERS SHALL BE IN ACCORDANCE WITH THE NATIONAL AIR

FILTRATION ASSOCIATION FOR COTTONWOOD FILTERS.

2 PROVIDE 8" X 18" OPENING ON TOP OF RETURN DUCT. COVER OPENING WITH

EXPANDED METAL MESH. WITH MINIMUM 45% FREE AREA.

3 EXISTING SANITARY SEWER LINE TO REMAIN AS IS.

4 CENTRAL CONTROL PANEL.

Revisions: Date:

MECHANICAL GENERAL NOTES

1. ALL EQUIPMENT TO BE SELECTED BASED OFF OF SITE INFORMATION, INCLUDING

CURBS EQUAL TO OR GREATER THAN DESIGN SNOW DEPTH. ELEVATION: SDB:

SWB: WDB:

2. THIS CONTRACTOR SHALL CLOSELY COORDINATE MECHANICAL AND PLUMBING

WITH ELECTRICAL, ARCHITECTURAL, AND BUILDING STRUCTURE.

3. ALL LOW PRESSURE RECTANGULAR DUCTWORK TO BE LINED WITH INSULATION

WITH AN R-VALUE OF R-6. ALL LOW PRESSURE ROUND DUCTWORK TO BE WRAPPED

WITH INSULATION WITH AN R-VALUE OF R-6. NO DUCT LINER IN OUTSIDE AIR

DUCTWORK OR DUCTWORK WITH IN DUCT HUMIDIFIERS.

4. ALL DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

5. GRILLES AND DUCTWORK ARE SIZED INDEPENDENTLY. THE NECK SIZE OF GRILLES

MAY NOT MATCH THE ASSOCIATED DUCT SIZE. PROVIDE TRANSITION TO GRILLES

AS NECESSARY.

6. PROVIDE BALANCING DAMPER WITH LOCKING QUADRANT IN EACH DUCT BRANCH

OF SUPPLY AND EXHAUST DUCTWORK.

7. COORDINATE EXACT THERMOSTAT LOCATIONS WITH FURNITURE AND OWNER.

FAILURE TO DO SO MAY REQUIRE MOVING THERMOSTATS AT CONTRACTORS COST.

8. ALL CONTROLS WIRING SHALL BE INSTALLED IN RACEWAYS AND BE THE

RESPONSIBILITY OF THE CONTROLS CONTRACTOR. RACEWAYS SHALL CONFORM

TO THE FOLLOWING ELECTRICAL SPECIFICATIONS; HANGERS AND SUPPORTS FOR

ELECTRICAL SYSTEMS, RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS AND

SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS.

9. CONTRACTOR SHALL FIELD VERIFY EXISTING FIELD CONDITIONS PRIOR TO

ORDERING OR FABRICATING. ADDITIONAL COST WILL NOT BE ALLOWED FOR

CONTRACTOR'S FAILURE TO BECOME FAMILIAR WITH EXISTING SITE CONDITIONS.

10. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT INCLUDING

STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR

COMMUNICATION TO BMS.

11. PROVIDE OPERATION AND MAINTENANCE MANUALS (O&M) WITHIN 30 DAYS OF

CERTIFICATE OF OCCUPANCY FOR ALL EQUIPMENT IN DIGITAL FORMAT TO

ENGINEER FOR REVIEW. O&M'S SHALL INCLUDE DOCUMENTATION OF ALL

WARRANTIES, REPORTS AND TESTS, RECORD DRAWINGS, CONTROLS SEQUENCE

OF OPERATIONS WITH DIAGRAMS, & EQUIPMENT INFORMATION. EQUIPMENT

INFORMATION INCLUDES MAKE & MODEL, WIRING, PIPING, STARTUP, SHUTDOWN,

TROUBLE SHOOTING SYSTEM BALANCING REPORT, FINAL COMMISSIONING REPORT

AND MAINTENANCE PROCEDURES.

12) THE CONTROL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND

INSTALLING ALL LOW VOLTAGE CONTROL CONDUITS AND WIRING. THE

CONTROLS CONTRACTOR IS ALSO RESPONSIBLE FOR COORDINATING ALL 120

VOLT POWER REQUIREMENTS FOR ALL CONTROLS WITH THE ELECTRICAL

CONTRACTOR WHO WILL INSTALL THE 120 VOLT POWER AND CONDUITS FOR

THE MECHANICAL CONTROLS.

THE CONTROLS CONTRACTOR IS RESONSIBLE FOR DETERMINING THE EXACT

POINT OF CONNECTION OF ALL CONTROL WIRING INTO THE EXISTING ENERGY

MANAGEMENT SYSTEM. IF AN ADDITIONAL GATEWAY IS REQUIRED, THE

CONTROLS CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND INSTALLING.

THE CONTROLS CONTRACTOR SHALL COORDINATE WITH OWNER FOR ALL WORK

TO MERGE INTO VA CAMPUS BUILDING MANAGEMENT SYSTEM.

13) SINCE WORK WILL TAKE PLACE IN A HOSPITAL, THERE IS THE POSSIBILITY OF

THE CONTRACTOR COMING IN CONTACT WITH BLOOD AND BODY FLUIDS

WHENEVER WORKING ON THE SANITARY SEWER SYSTEM. CONTRACTOR IS

REQUIRED TO PROVIDE AND USE APPROPRIATE PERSONAL PROTECTIVE

EQUIPMENT WHENEVER WORKING ON THE SANITARY SEWER SYSTEM TO

PREVENT EXPOSURE TO THEIR EMPLOYEES.

2" WIDE X10 GAUGE GI STRAP

THREADED BOTTOM 9" ABOVE

SINGLE TOP NUT WITH DOUBLE

NUT BELOW

3/8"∅ STEEL ROD ANCHORED TO

STRUCTURE WITH BEAM CLAMPS

OR EXPANSION BOLTS

R

1/6 W

1/3 W

1/2 W

VANE

RADIUS "R"

SHALL BE EQUAL

TO OR GREATER

THAN 1/6 W

VANE

RADIUS "R"

SHALL BE EQUAL

TO OR GREATER

THAN 1/3 W

R RADIUS "R"

SHALL BE EQUAL

TO OR GREATER

THAN W

LONG RADIUS ELBOWSHORT RADIUS ELBOW WITH ONE VANE SHORT RADIUS ELBOW WITH TWO VANES

1.

2.

NOTES:

ALL ELBOWS ARE LONG RADIUS UNLESS OTHERWISE NOTED ON PLANS. THE INTERIOR SURFACE OF

ALL RADIUS ELBOWS SHALL BE MADE ROUND.

ALL LONG RADIUS ELBOWS SHOWN ON PLANS MAY BE MADE SHORT RADIUS ELBOWS. ALL SHORT

RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED

AS DIRECTED BY SMACNA HVAC DUCT CONSTRUCTION STANDARDS.

R

W

W W

2/3 W

1/3 W

DISTRIBUTOR

FILTER DRYER

COMBINATION SIGHT GLASS AND

MOISTURE INDICATOR

LIQUID LINE SOLENOID VALVE

THERMAL BULB

EXPANSION VALVE

HP-1

PUMPED CONDENSATE

ROUTE PUMPED CONDENSATE TO

FUNNEL DRAIN ENSURE 1" AIR GAP

CAS-17 AIR HANDLER

DISTRIBUTOR

FILTER DRYER

COMBINATION SIGHT GLASS AND

MOISTURE INDICATOR

LIQUID LINE SOLENOID VALVE

THERMAL BULB

EXPANSION VALVE

CAS-18 AIR HANDLER

DISTRIBUTOR

FILTER DRYER

COMBINATION SIGHT GLASS AND

MOISTURE INDICATOR

LIQUID LINE SOLENOID VALVE

THERMAL BULB

EXPANSION VALVE

CAS-16 AIR HANDLER

ROUTE PUMPED CONDENSATE TO

FUNNEL DRAIN ENSURE 1" AIR GAP

PUMPED CONDENSATE

FLEXIBLE CONNECTION

SHUT OFF VALVE WITH GAUGE PORT (TYP)

LIQUID LINE

SUCTION LINE

LIQUID LINE

SUCTION LINE

LIQUID LINE

SUCTION LINE

TURNING VANES

NOTES:

1. ALL TURNING VANES SHALL BE SINGLE VANE TYPE REGARDLESS OF DIMENSION.

2. ALL SINGLE VANES SHALL HAVE A 2 INCH RADIUS, 1 INCH MAXIMUM SPACE

BETWEEN VANES AND A 3/4 INCH TRAILING EDGE.

W

W1

1.

2.

3.

NOTES:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES

SHOWN SHALL APPLY

INSTALL PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS

WHEN TRANSITIONING DUCT HEIGHT AS WELL AS WIDTH, THE

LONGER LENGTH SHALL APPLY.

ECCENTRIC TRANSITION:

MAX 30° ANGLE

WHEN TRANSITIONING FROM ROUND TO FLAT OVAL,

A MAX ANGLE OF 45° IS PERMITTED

L (MIN) = (W2 - W1)/ 0.58 FOR 30°

L (MIN) = (H2 - H1)/ 0.58 FOR 30°

L (MIN) = W2 - W1 FOR 45°

L (MIN) = H2 - H1 FOR 45°

FOR ROUND DUCTWORK W=Ø

L SHALL BE GREATER OF W AND H CALCULATIONS

CONVERGING CONCENTRIC TRANSITION:

X° = 60° MAX

L (MIN) = (W2 - W1)/ 1.15

L (MIN) = (H2 - H1)/ 1.15

FOR ROUND DUCTWORK W=Ø

L SHALL BE GREATER OF W AND H CALCULATIONS

DIVERGING CONCENTRIC TRANSITION:

X° = 45° MAX

L (MIN) = (W2 - W1) / 2

L (MIN) = (H2 - H1) / 2

FOR ROUND DUCTWORK W=Ø

L SHALL BE GREATER OF W AND H CALCULATIONS

L

L

W

2AIR

FLOW

W

2AIR

FLOW W

30° X°

L

W

2 AIR

FLOWW

X°

SECURE DIFFUSER TO

DUCT WITH MINIMUM OF

8 SHEET METAL SCREWS

(2 PER SIDE)

ROUND BRANCH DUCT.

SEE PLAN FOR DUCT

SIZE

SUPPLY AIR DUCT

AS REQUIRED

NOTE:

1. CEILING DIFFUSERS IN SALES AREA

SHALL BE INSTALLED AT SAME

HEIGHT AS AREA LIGHT FIXTURES

OPPOSED BLADE

DAMPER

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M500

MECHANICAL DETAILS Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

SCALE: NTS1 DUCT HANGER DETAIL - ROUND

SCALE: NTS2 DUCT ELBOW - ROUND DETAIL

SCALE: NTS5 MULTIPORT SPLIT SYSTEM SCHEMATIC

Revisions: Date:

SCALE: NTS6 DUCT ELBOW - SQUARE DETAIL

SCALE: NTS4 DUCT TRANSITIONS DETAIL

SCALE: NTS3 CEILING DIFFUSER (ROUND)

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M600

MECHANICAL SCHEDULES Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

MITSUBISHI

CARRIER

(1) PROVIDE WITH MERV 8 FILTERS.

(2) PROVIDE WITH INTEGRAL CONDENSATE PUMP. ROUTE COPPER CONDENSATE PIPING TO FUNNEL DRAIN IN PLUMBING CHASE. PROVIDE FUNNEL DRAIN AS PART OF THIS PROJECT.

(3) PROVIDE SUCTION LINE FILTER WITH BYPASS ON LARGEST CAPACITY FAN COIL. AFTER

A WEEK OF USE CHECK FILTER. IF DIRTY REPLACE AND REPEAT. IF CLEAN REMOVE FILTER AND LEAVE IN BYPASS MODE.

(4) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING AND/OR COMMUNICATION TO BMS.

(5) PROVIDE WITH SHOP PIPING AND WIRING DRAWINGS. ANY DEVIATIONS FROM SHOP DRAWING MUST BE DOCUMENTED AND PROVIDED TO ENGINEER.

(6) PROVIDE 10 YEAR WARRANTY. MUST INCLUDE COPY OF FINALIZED WARRANTY TO ENGINEER AT PROJECT CLOSEOUT.

(7) COORDINATE REFRIGERANT CHARGE AND PIPING SIZES WITH EQUIVALENT LINE LENGTH TO MINIMIZE PRESSURE DROP AND CAPACITY LOSS.

(8) PRESSURE TEST ALL REFRIGERANT PIPING. PROVIDE REPORT OF PRESSURE TESTING TO ENGINEER. PRESSURE TEST MUST BE WITNESSED BY MANUFACTURER'S REP.

PLUMB = DIVISION 22

MECH = DIVISION 23

ELEC = DIVISION 26

MNFR = MANUFACTURER

ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY:

MULTI-PORT HEAT PUMP - INDOOR UNIT SCHEDULE

LABEL TYPE

AIRFLOW

(CFM)

COOLING CAPACITY HEATING CAPACITY ELECTRICAL DISCONNECT

PROVIDED BY

(MECH/ ELEC)

SOUND

RATING

WEIGHT

(LBS) MANUFACTURER MODEL REMARKS

NOMINAL

(BTUH)

DESIGN

(BTUH)

NOMINAL

(BTUH)

DESIGN

(BTUH) VOLTS PHASE Hz MCA MOCP

EMERG

POWER

CAS-16 4-WAY CASSETTE 550 18,000 12,800 20,000 16,500 208 1 60 3 15 NO ELEC 35 36 CARRIER 45MBCAQ18XA3 ALL CAS-17 4-WAY CASSETTE 550 18,000 12,800 20,000 16,500 208 1 60 3 15 NO ELEC 35 36 CARRIER 45MBCAQ18XA3 ALL CAS-18 1-WAY CASSETTE 470 7,500 5,800 8,500 6,500 208 1 60 3 15 NO ELEC 32.5 63 CARRIER 45MCCAQ06XA3 ALL

MITSUBISHI

CARRIER

(1) PROVIDE WITH SHOP PIPING AND WIRING DRAWINGS. ANY DEVIATIONS FROM SHOP DRAWING MUST BE DOCUMENTED AND PROVIDED TO

ENGINEER.

(2) PROVIDE 10 YEAR WARRANTY. MUST INCLUDE COPY OF FINALIZED WARRANTY TO ENGINEER AT PROJECT CLOSEOUT.

(3) COORDINATE REFRIGERANT CHARGE AND PIPING SIZES WITH EQUIVALENT LINE LENGTH TO MINIMIZE PRESSURE DROP AND CAPACITY LOSS.

(4) PRESSURE TEST ALL REFRIGERANT PIPING. PROVIDE REPORT OF PRESSURE TESTING TO ENGINEER. PRESSURE TEST MUST BE WITNESSED BY

MANUFACTURER'S REP.

(5) PROVIDE WITH NEOPRENE PADS AT ALL CONNECTION POINTS.

(6) PROVIDE WITH MIRO INDUSTRIES STANCHIONED HD SUPPORT.

(7) PROVIDE BASE PAN HEATERS.

(8) PROVIDE FACTORY AUTHORIZED STARTUP OF EQUIPMENT INCLUDING STARTUP OF ANY FACTORY CONTROLS TO ENSURE PROPER SEQUENCING

AND/OR COMMUNICATION TO BMS. ENSURE DEFROST CYCLE IS ENABLED.

(9) PROVIDE WITH DIAMOND CONTROLS.

(10) ENABLE HIGH HEATING PERFORMANCE.

(11) VERIFY ALL REFRIG. PIPING SIZES AND LENGTHS W/ SITE CONDITIONS IN MANUFACTURERS SELECTIONS SOFTWARE. LENGTH SHOWN ON PLANS DO NOT

ABSOLVE CONTRACTOR FROM DOING TAKE OFFS AND COORDINATING W/ OTHER DISCIPLINES.

(12) PROVIDE WITH CENTRAL CONTROL PANEL AND REMOTE WIRELESS SENSORS. REMOTE SENSORS SHALL BE PERMANENTLY MOUNTED IN THE SPACES AS INDICATED ON THE PLANS. INSTALL CENTRAL CONTROL PANEL IN MECHANICAL ROOM, COORDINATE EXACT LOCATION WITH FMS ENGINEER.

(13) CONDENSING UNIT COILS ARE TO BE COMPLETELY PROTECTED USING AIR INTAKE FILTRATION SCREENS SPECIFICALLY DESIGNED FOR COTTONWOOD FILTRATION. THE SCREENS SHALL BE EASILY REMOVABLE WITH QUARTER TURN CONNECTIONS. THE SCREENS SHALL NOT VOID THE WARRANTY OF THE ORIGINAL EQUIPMENT MANUFACTURER. THE SCREENS SHALL HAVE A STATIC PRESSURE DROP LESS THAN 0.1 INCHES OF WATER GAGE, BE UV RESISTANT, FLAME RESISTANT, NON-ELECTRO STATIC, AND MOLD AND MILDEW RESISTANT. THE FILTER SHALL BE IN ACCORDANCE WITH THE NATIONAL AIR FILTRATION

ASSOCIATION FOR COTTONWOOD FILTERS.

PLUMB = DIVISION 22

MECH = DIVISION 23

ELEC = DIVISION 26

MNFR = MANUFACTURER

ACCEPTABLE MANUFACTURERS: REMARKS: SCHEDULE KEY

HEAT PUMP - OUTDOOR UNIT SCHEDULE

LABEL SERVES RATIO

COOLING CAPACITY HEATING CAPACITY

REFRIGERANT

TYPE

NO. OF

CONNECTIONS

ELECTRICAL DISCONNECT

PROVIDED BY

(MECH/ ELEC)

SOUND

RATING

WEIGHT

(LBS) MANUFACTURER MODEL REMARKS

NOMINAL

(BTUH)

CONNECTED

(BTUH) SEER2

NOMINAL

(BTUH)

CONNECTED

(BTUH) HSPF2 VOLTS PHASE Hz MCA MOCP

EMERG

POWER

VRF-3 BIOMED 115% 36,000 42,000 23.1 36,000 42,000 10.7 R-454B 1 208 1 60 37 40 NO ELEC 65 212 CARRIER 37MGHAQ36EA3 ALL

KRUEGER

TUTTLE & BAILEY

TITUS

PRICE

(1) PROVIDE TRANSITION AS NECESSARY.

(2) COORDINATE EXACT COLOR SELECTION WITH OWNER AND ARCHITECT.

ACCEPTABLE MANUFACTURERS: REMARKS:

REGISTER - GRILLE- DIFFUSER SCHEDULE

LABEL TYPE

MAX AIRFLOW

(CFM)

FACE

SIZE

NECK

SIZE BLOW PATTERN

PD

(IN-WC)

THROW(S)

(FT)

MAX

NC MANUFACTURER MODEL REMARKS

D-1 ROUND 3-CONE DIFFUSER 425 18" 10" ROUND 360 DEGREES 0.060 4-6-10 25 PRICE INDUSTRIES RCD ALL

RENEWAIRE

VENMAR

COOK

TRANE

ALDES

(1) PROVIDE WITH SINGLE POINT ELECTRICAL CONNECTION.

(2) PROVIDE WITH MERV 8 FILTERS, AND ECM MOTORS.

(3) PROVIDE WITH 7-DAY PROGRAMMABLE THERMOSTAT WITH REMOTE WALL MOUNTED SENSOR AND OVERRIDE SWITCH.

(4) PROVIDE WITH MANUFACTURER'S GRAVITY BACKDRAFT DAMPERS, VIBRATION ISOLATION HANGERS, AND FLEX INLET / OUTLET CONNECTIONS.

ACCEPTABLE MANUFACTURERS: REMARKS:

ENERGY RECOVERY UNIT SCHEDULE

LABEL

SUPPLY FAN EXHAUST FAN

WEIGHT

SOUND RATING

(SONES) HP VOLTAGE PHASE Hz MOCP

EMERGENCY

POWER

DISCONNECT

MANUFACTURER MODEL REMARKSCFM EXT. S.P. CFM EXT. S.P.

FURN BY

ELEC

FURN BY

MECH

ERU-2 300 0.38 300 0.38 325 3 0.5 (X2) 120 1 60 15 A NO YES NO RenewAire LLC HE1XINV ALL

CEILING

CASSETTE

UNIT

TS

AI

PROGRAMMABLE THERMOSTAT

OUTDOOR

HEAT PUMP

1. GENERAL:

THE SPACE TEMPERATURE SENSOR SHALL SIGNAL DDC CONTROLLER THE SPACE

TEMPERATURE. THE DDC SYSTEM SHALL ONLY MONITOR SPACE TEMPERATURE. A STAND

ALONE PROGRAMMABLE THERMOSTAT SHALL DETERMINE SET POINTS AND MONITOR

SPACE TEMPERATURE FOR OPERATION OF THE SYSTEM.

2. OCCUPIED MODE:

DURING THE OCCUPIED MODE THE FAN SHALL BE SET TO AUTOMATIC.

AS THE ROOM TEMPERATURE INCREASES TO THE COOLING SETPOINT THE

PROGRAMMABLE THERMOSTAT SHALL SIGNAL ON MECHANICAL COOLING.

AS THE ROOM TEMPERATURE DECREASES TO THE HEATING SETPOINT, THE

PROGRAMMABLE THERMOSTAT SHALL SIGNAL ON HEATING.

IF THE DDC ROOM TEMPERATURE SENSORS DETECTS TEMPERATURES IN EXCESS OF 80°F

(ADJUSTABLE) OR BELOW 60°F (ADJUSTABLE), THE CONTROL SYSTEM SHALL GENERATE

AN ALARM AT THE OPERATOR WORKSTATION.

3. UNOCCUPIED MODE:

DURING THE UNOCCUPIED MODE THE FAN SHALL BE STOPPED.

IF THE ROOM TEMPERATURE INCREASES TO THE SETBACK COOLING SETPOINT OF 85°F

(ADJUSTABLE), THE PROGRAMMABLE THERMOSTAT SHALL SIGNAL ON MECHANICAL

COOLING.

IF THE ROOM TEMPERATURE DECREASES TO THE SETBACK HEATING SETPOINT OF 50°F

(ADJUSTABLE), THE PROGRAMMABLE THERMOSTAT SHALL SIGNAL ON HEATING.

4. SAFETIES:

THE CONDENSATE OVERFLOW SWITCH SHALL SHUT DOWN THE UNIT WHEN CONDENSATE

BUILDS UP IN THE DRAIN PAN. THE DDC SYSTEM SHALL MONITOR THE SWITCH.

DI

TE

M

PE

R

AT

U

R E

C O

N D

EN

SA

TE

O

VE

R

FL

O

W S

EN

SO

R

HEAT

EXCHANGER

ERU

CONTROLLER

OUTSIDE AIR

EXHAUST AIR

EXHAUST AIR

SUPPLY AIR

T

AI

DP

AI

PR

ES

SU

R

E

TE

M

PE

R

AT

U

R E

AI

TE

M

PE

R

AT

U

R E

T

AI

PR

ES

SU

R

E

DP

T

AI AI

T

TE

M

PE

R

AT

U

R E

TE

M

PE

R

AT

U

R E

MOTOR

MOTOR

DI

CURRENT

SENSING

RELAY

START/STOP

CONTROL

RELAY

CURRENT

SENSING

RELAY

START/STOP

CONTROL

RELAY

DI

ST

AT

U S

ST

AT

U S

AL

AR

M S

DI

EN

AB

LE

DO

EC

O

N O

M

IZ

ER

M

O D

E

DI

1. GENERAL:

THE DDC CONTROLLER SHALL ENABLE THE ENERGY RECOVERY UNIT, CONTROL AND MONITOR THE INTAKE AND DISCHARGE DAMPERS, MONITOR FAN STATUS, FILTER DIFFERENTIAL PRESSURE, AND MONITOR THE SUPPLY AIR TEMPERATURE. THE FOLLOWING INTERNAL CONTROLS SHALL BE MONITORED REMOTELY: ALARMS AND ECONOMIZER MODE. ALL ALARMS SHALL BE

SENT TO THE OPERATOR WORKSTATION.

INTERNAL CONTROLS SHALL PROVIDE THE FROST ELIMINATION CONTROL ACROSS THE HEAT EXCHANGER.

INTERNAL CONTROLS SHALL PROVIDE ECONOMIZER CONTROL WHENEVER THE RESPECTIVE ENERGY RECOVERY UNIT GOES

INTO THE ECONOMIZER STAGE.

2. OCCUPIED MODE:

THE SUPPLY AND EXHAUST FANS SHALL START, AND THE ECONOMIZER DAMPER SHALL CYCLE PER THE INTERNAL CONTROL

REQUIREMENTS. SEE ABOVE FOR FROST AND ECONOMIZER CONTROL.

3. UNOCCUPIED MODE:

IN THE UNOCCUPIED MODE THE SUPPLY AND EXHAUST FANS SHALL STOP.

4. ALARM MODE

IF FAN MOTOR CURRENT RELAY FAILS TO SENSE CURRENT AFTER DELIVERY OF ENABLE SIGNAL, ALARM SHALL BE SENT

OPERATOR WORKSTATION.

IF FILTER DIFFERENTIAL PRESSURE EXCEEDS 0.25 IN W.C., A "DIRTY FILTER" ALARM SHALL BE SENT TO THE OPERATOR

WORKSTATION.

324 S. State St., Suite 400 Salt Lake City, UT 84111

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- M ec h

C en tra l.r vt 3/

5/

2:

:3

PM

M700

MECHANICAL CONTROLS Boise VAMC BIOMED

05 MAR 2025 CLD DDL

100% CD

Revisions: Date:

SCALE: NTS1 DUCTLESS SPLIT SYSTEM FAN COIL CONTROL SHEMATIC

SCALE: NTS2 ENERGY RECOVERY UNIT (GRAVITY BACKDRAFT DAMPER) CONTROL SCHEMATIC

800-678-7077 801-328-5151 fax: 801-328-5155 www.spectrum-engineers.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

SHEET TO BE VIEWED AND PRINTED IN COLOR

BUILDING 27

531-24-107

BOISE, ID 83702

Au to de sk

D oc s:

//2

- B oi se

V

AM

C B

IO

M

ED

/2

4- El ec C en tra l.r vt

3/ 5/

2:

:3

PM

EE001

ELECTRICAL COVER SHEET Boise VAMC BIOMED

05 MAR 2025 WNF PMS

100% CD

GENERAL ELECTRICAL NOTES

1. CLARIFICATION METHODS: AT THE TIME OF BIDDING, BIDDERS SHALL FAMILIARIZE

THEMSELVES WITH THE DRAWINGS AND SPECIFICATIONS. ANY QUESTIONS,

MISUNDERSTANDINGS, CONFLICTS, DELETIONS, DISCONTINUED PRODUCTS,

CATALOG NUMBER DISCREPANCIES, DISCREPANCIES BETWEEN THE EQUIPMENT

SUPPLIED AND THE INTENT OR FUNCTION OF THE EQUIPMENT, ETC, SHALL BE

SUBMITTED TO THE ARCHITECT/ENGINEER IN WRITING FOR CLARIFICATION PRIOR

TO ISSUANCE OF THE FINAL ADDENDUM AND BIDDING OF THE PROJECT. WHERE

DISCREPANCIES OR MULTIPLE INTERPRETATIONS OCCUR, THE MOST STRINGENT

(WHICH IS GENERALLY RECOGNIZED AS THE MOST COSTLY) THAT MEETS THE

INTENT OF THE DOCUMENTS SHALL BE ENFORCED.

2. OWNER FURNISHED ITEMS: THE OWNER WILL FURNISH MATERIAL AND

EQUIPMENT AS INDICATED IN THE CONTRACT DOCUMENTS TO BE INCORPORATED

INTO THE WORK. THESE ITEMS ARE ASSIGNED TO THE INSTALLER AND COSTS

FOR RECEIVING, HANDLING, STORAGE, IF REQUIRED, AND INSTALLATION ARE

INCLUDED IN THE CONTRACT SUM.

A. THE INSTALLER'S RESPONSIBILITIES ARE THE SAME AS IF THE INSTALLER

FURNISHED THE MATERIALS OR EQUIPMENT.

B. THE OWNER WILL ARRANGE AND PAY FOR DELIVERY OF OWNER

FURNISHED ITEMS FREIGHT ON BOARD JOB SITE AND THE INSTALLER WILL

INSPECT DELIVERIES FOR DAMAGE. IF OWNER FURNISHED ITEMS ARE

DAMAGED, DEFECTIVE OR MISSING, DOCUMENT DAMAGED ITEMS WITH

THE TRANSPORT COMPANY AND THE OWNER WILL ARRANGE

FOR REPLACEMENT. THE OWNER WILL ALSO ARRANGE FOR

MANUFACTURER'S FIELD SERVICES, AND THE DELIVERY OF

MANUFACTURER'S WARRANTIES AND BONDS TO THE INSTALLER.

C. THE INSTALLER IS RESPONSIBLE FOR DESIGNATING THE DELIVERY DATES

OF OWNER FURNISHED ITEMS AND FOR RECEIVING, UNLOADING AND

HANDLING OWNER FURNISHED ITEMS AT THE SITE.THE INSTALLER IS

RESPONSIBLE FOR PROTECTING OWNER FURNISHED ITEMS FROM

DAMAGE, INCLUDING DAMAGE FROM EXPOSURE TO THE ELEMENTS, AND

TO REPAIR OR REPLACE ITEMS DAMAGED AS A RESULT OF HIS

OPERATIONS.

DEFINITIONS

NOTE: ALL DEFINITIONS MAY NOT BE USED.

INDICATED: THE TERM "INDICATED" REFERS TO GRAPHIC REPRESENTATIONS,

NOTES, OR SCHEDULES ON THE DRAWINGS, OTHER PARAGRAPHS OR

SCHEDULES IN THE SPECIFICATIONS, AND SIMILAR REQUIREMENTS IN THE

CONTRACT DOCUMENTS. WHERE TERMS SUCH AS "SHOWN", "NOTED",

"SCHEDULED", AND "SPECIFIED" ARE USED, IT IS TO HELP THE READER LOCATE

THE REFERENCE, NO LIMITATION ON LOCATION IS INTENDED.

DIRECTED: TERMS SUCH AS "DIRECTED", "REQUESTED", AUTHORIZED",

"SELECTED", "APPROVED", "REQUIRED", AND "PERMITTED" MEAN "DIRECTED BY

THE ENGINEER", "REQUESTED BY THE ENGINEER", AND SIMILAR PHRASES.

APPROVED: THE TERM "APPROVED", WHERE USED IN CONJUNCTION WITH THE

ENGINEER'S ACTION ON THE CONTRACTOR'S SUBMITTALS, APPLICATIONS, AND

REQUESTS, IS LIMITED TO THE ENGINEER'S DUTIES AND RESPONSIBILITIES AS

STATED IN GENERAL AND SUPPLEMENTARY CONDITIONS.

FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO

THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY,

INSTALLATION, AND SIMILAR OPERATIONS."

INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT PROJECT

SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION,

PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING,

CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS."

PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE

AND READY FOR THE INTENDED USE."

INSTALLER: AN "INSTALLER" IS THE CONTRACTOR OR AN ENTITY ENGAGED BY

THE CONTRACTOR, EITHER AS AN EMPLOYEE, SUBCONTRACTOR, OR SUB-

SUBCONTRACTOR, FOR PERFORMANCE OF A PARTICULAR CONSTRUCTION

ACTIVITY, INCLUDING INSTALLATION, ERECTION, APPLICATION, AND SIMILAR

OPERATIONS. INSTALLERS ARE REQUIRED TO BE EXPERIENCED IN THE

OPERATIONS THEY ARE ENGAGED TO PERFORM.

TECHNOLOGY SYSTEMS: THE TERM "TECHNOLOGY SYSTEMS" IS USED TO

DESCRIBE ALL LOW VOLTAGE SYSTEMS GENERALLY REFERRED TO AS

"SPECIAL SYSTEMS". THESE SYSTEMS INCLUDE BUT ARE NOT NECESSARILY

LIMITED TO ALL SYSTEMS WHICH UTILIZE VOLTAGES OF LESS THAN 71 VOLTS

SUCH AS SOUND SYSTEMS, VIDEO SYSTEMS, TV SYSTEMS, SECURITY

SYSTEMS, VOICE AND DATA CABLING SYSTEMS, ETC...

ABBREVIATIONS

NOTE: ALL ABBREVIATIONS MAY NOT BE USED.

1P SINGLE POLE

1PH SINGLE-PHASE

1WAY ONE-WAY

2/C TWO-CONDUCTOR

2WAY TWO-WAY

3/C THREE-CONDUCTOR

3WAY THREE-WAY

4OUT QUADRUPLE RECEPTACLE

OUTLET

4PDT FOUR-POLE DOUBLE THROW

4PST FOUR-POLE SINGLE THROW

4W FOUR-WIRE

4WAY FOUR-WAY

A ABOVE COUNTER

AC ARMORED CABLE

ACS ACCESS CONTROL SYSTEM

ADA AMERICANS WITH DISABILITIES

ACT

ADJ ADJACENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPERE INTERRUPTING

CAPACITY

ALUM ALUMINUM

AMP AMPERE

ANN ANNUNCIATOR

AP ACCESS POINT (WIRELESS

DATA)

AR AS REQUIRED

ASC AMPS SHORT CIRCUIT

ATS AUTOMATIC TRANSFER

SWITCH

AV AUDIO VISUAL

AWG AMERICAN WIRE GAGE

BB

XFMR

BUCK-BOOST TRANSFORMER

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

C CEILING MOUNTED

CAT CATEGORY

CATV COMMUNITY ANTENNA

TELEVISION

CB CIRCUIT BREAKER

CCBA CUSTOM COLOR AS SELECTED

BY ARCHITECT

CCTV CLOSED CIRCUIT TELEVISION

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/

OWNER INSTALLED

CFBA CUSTOM FINISH AS SELECTED

BY ARCHITECT

CI CONTACT INDICATOR

CKT CIRCUIT

CM CONSTRUCTION MANAGER

CND CONDUIT

CO CONVENIENCE OUTLET

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTROL PANEL

CR CARD READER

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

dBA UNIT OF SOUND LEVEL

DPDT DOUBLE POLE, DOUBLE

THROW

DS DISCONNECT SWITCH

E ENHANCED

EA EACH

EM EMERGENCY

EMT ELECTRICAL METALLIC TUBING

ENT ELECTRIC NONMETALLIC

TUBING

EPO EMERGENCY POWER OFF

EQUIP EQUIPMENT

ER EQUIPMENT ROOM

EX EXISTING

F FURNITURE MOUNTED

FA FIRE ALARM

FCP FIRE ALARM CONTROL PANEL

FLA FULL LOAD AMPS

FMC FLEXIBLE METAL CONDUIT

FOB FREIGHT ON BOARD

FPP FIBER PATCH PANEL

FVNR FULL VOLTAGE

NON-REVERSING

FVR FULL VOLTAGE REVERSING

GEN GENERATOR

GFCI GROUND FAULT INTERRUPTER

GFP GROUND FAULT PROTECTION

GIG GIGA HERTZ

GND GROUND

HD HEAVY DUTY

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSE POWER

HPF HIGH POWER FACTOR

HPS HIGH PRESSURE SODIUM

HV HIGH VOLTAGE

HWM HORIZONTAL WIRE

MANAGEMENT

HZ HERTZ

I/O INPUT/ OUTPUT

IG ISOLATED GROUND

IMC INTERMEDIATE METAL

CONDUIT

IN/IS INSULATED/ ISOLATED

IR INFRARED

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWh KILOWATT HOUR

LED LIGHT EMITTING DIODE

LFMC LIQUID TIGHT FLEXIBLE METAL

CONDUIT

LFNC LIQUID TIGHT FLEXIBLE

NONMETALLIC CONDUIT

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTG LIGHTING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MC METAL CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MCP MOTOR CIRCUIT PROTECTION

MDP MAIN DISTRIBUTION PANEL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MOCP MAXIMUM OVERCURRENT

PROTECTION

MTS MANUAL TRANSFER SWITCH

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS

ASSOCIATION

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OCP OVER CURRENT PROTECTION

OE OWNER ELECTRONICS

OF/CI OWNER FURNISHED/

CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED/ OWNER

INSTALLED

OFP OBTAIN FROM PLANS

OH DR OVERHEAD (COILING) DOOR

OL OVERLOAD

PB PUSHBUTTON

PF POWER FACTOR

PH PHASE

PNL PANEL

PNM PLENUM

PR PAIR

PS POWER SUPPLY

PT POTENTIAL TRANSFORMER

PTZ PAN/TILT/ZOOM

PV PHOTO VOLTAIC

QTY QUANTITY

R REMOVE

RCP REFLECTED CEILING PLAN

RMC RIGID METAL CONDUIT

RNC RIGID NONMETAL CONDUIT

RO REMOTE DOOR OPEN

RPM REVOLUTIONS PER MINUTE

RPP RISER PATCH PANEL

RR REMOVE AND RELOCATE

S/S START/STOP

SCA SHORT CIRCUIT AMPS

SCBA STANDARD COLOR AS

SELECTED BY ARCHITECT

SEC SECURITY

SF SQUARE FOOT (FEET)

SFBA STANDARD FINISH AS

SELECTED BY ARCHITECT

SPD SURGE PROTECTIVE DEVICE

SPDT SINGLE POLE, DOUBLE THROW

SPEC SPECIFICATION

SPP STATION PATCH PANEL

SPST SINGLE POLE, SINGLE THROW

ST SINGLE THROW

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TL TWIST LOCK

TP TELEPHONE POLE

TP TWISTED PAIR

TR TELECOMMMUNICATIONS

ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TVSS TRANSIENT VOLTAGE SURGE

SUPPRESSER

TYP TYPICAL

UF UNDERFLOOR

UGND UNDERGROUND

UPS UNINTERRUPTIBLE POWER

SUPPLY

V VOLTS

VA VOLT AMPERE

VFC/VF

D

VARIABLE FREQUENCY MOTOR

CONTROLLER

VIC VIDEO INTERCOM SYSTEM

VSS VIDEO SURVEILLANCE SYSTEM

VWM VERTICAL WIRE MANAGEMENT

W/ WITH

W/O WITHOUT

WP WEATHERPROOF

WPP WIRELESS PATCH PANEL

XFMR TRANSFORMER

WIRING METHODS

WIRING.

WIRING TURNED UP OR TOWARDS OBSERVER.

WIRING TURNED DOWN OR AWAY FROM OBSERVER.

BRANCH CIRCUIT HOME RUN TO PANELBOARD: NUMBER OF

ARROWS INDICATES NUMBER OF CIRCUITS. LETTER AND

NUMBER NOTATIONS IDENTIFY PANEL AND CIRCUIT NUMBERS.A-1,3,5

BRANCH CIRCUIT HOME RUN TO PANELBOARD: NUMBER OF

ARROWS INDICATES NUMBER OF CIRCUITS. LETTER AND

NUMBER NOTATIONS IDENTIFY PANEL AND CIRCUIT NUMBERS.

NUMBER IN BOX REFERS TO THE CONDUCTOR AND CONDUIT

SCHEDULE.

A-1,3,5

LOW VOLTAGE WIRING: DIVIDE, MEDIUM LINE.

CONDUIT STUB. DIMENSION RECORD DRAWINGS AND MARK.

CONDUCTOR & CONDUIT ("CC") SCHEDULE INDICATOR. REFER

TO ONE-LINE DIAGRAM.1

SYMBOL DESCRIPTION

SYMBOLS LEGEND

SYMBOL DESCRIPTION

SYMBOLS LEGEND

SINGLE BRANCH CIRCUIT HOME RUN TO PANELBOARD WITH

DEDICATED NEUTRAL CONDUCTOR. LETTER AND NUMBER

NOTATION IDENTIFY PANEL AND CIRCUIT NUMBER.A-1

3. EXPOSED STRUCTURE AREAS (EXCLUDING MECHANICAL, ELECTRICAL, AND

COMMUNICATION SPACES): INSTALL RACEWAYS BETWEEN DECK AND

STRUCTURE WHEREVER POSSIBLE IN EXPOSED STRUCTURE CEILING AREAS.

ROUTE RACEWAYS IN CONCEALED AREAS WHEREVER POSSIBLE. REFER ALL

CONDITIONS WHERE RACEWAYS MUST BE INSTALLED WHICH CANNOT COMPLY

WITH THESE REQUIREMENTS TO THE ARCHITECT.

4. SUBMITTALS: PROVIDE ORIGINAL ELECTRONIC PDF FORMAT, BOUND,

BOOKMARKED (EACH SECTION AND PRODUCT), AND HIGHLIGHTED. JOB NAME

AND SUBCONTRACTOR SHALL BE ON THE FRONT COVER. PREPARE INDEX OF

EQUIPMENT SUBMITTED IN EACH TAB.

5. REFLECTED CEILING PLANS: COORDINATE THE LOCATION OF LIGHT FIXTURES

WITH THE ARCHITECTURAL REFLECTED CEILING PLANS. REFER ALL

DISCREPANCIES TO THE ARCHITECT AND ENGINEER.

6. ALL WORK SHALL BE DONE ACCORDING TO THE CURRENT NATIONAL ELECTRIC

CODE (NEC), IBC, NFPA, AND IFC. COMPLIANCE AND FINAL APPROVAL IS SUBJECT

TO THE ON SITE FIELD INSPECTION OF THE AHJ.

REFERENCE AND LINE SYMBOLS

DETAIL INDICATOR: A5 INDICATES DETAIL NUMBER, E-501

INDICATES DRAWING SHEET WHERE DETAIL IS SHOWN.

A5 E-501

ELEVATION OR SECTION INDICATOR, EXTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5 E-201

ELEVATION OR SECTION INDICATOR, INTERIOR: A5 INDICATES

ELEVATION OR SECTION NUMBER, E-201 INDICATES DRAWING

SHEET WHERE ELEVATION OR SECTION IS SHOWN.

A5 E-201

ROOM IDENTIFIER WITH ROOM NAME AND NUMBER.

ROOM NAME

KEYNOTE INDICATOR.1

REVISION INDICATOR.1

CU-1 EQUIPMENT INDICATOR.

BREAK, STRAIGHT: TO BREAK PARTS OF DRAWING

BREAK, ROUND

MATCH LINE INDICATOR: CENTER, EXTRA WIDE LINE.MATCH LINE

SEE XX/X-XXX

NEW LINE: MEDIUM LINE.

HIDDEN FEATURES LINE: HIDDEN, THIN LINE

EXISTING TO REMAIN LINE: THIN LINE.

DEMOLITION LINE: DASHED, MEDIUM LINE

PROPERTY LINE: DASHED, WIDE LINE.

CONTRACT LIMIT LINE: DASHDOT, WIDE LINE.

MECHANICAL EQUIPMENT INDICATOR. "X-X" INDICATES

EQUIPMENT MARK SHOWN ON EQUIPMENT SCHEDULE. "XMDP"

IDENTIFIES PANEL EQUIPMENT IS CIRCUITED TO. REFER TO

EQUIPMENT SCHEDULE FOR ADDITIONAL INFORMATION.

XMDP

X-X

ELECTRICAL POWER AND DISTRIBUTION

CIRCUIT BREAKER (ONE-LINE DIAGRAM).

MOTOR.

TRANSFORMER (ONE-LINE DIAGRAM).

PANELBOARD (ONE-LINE DIAGRAM)."1H"

PANELBOARD WITH MAIN LUGS ONLY. BUS SIZE AND PHASE AS

SHOWN (ONE-LINE DIAGRAM).

225/3

"1H"

PANELBOARD WITH MAIN CIRCUIT BREAKER. SIZE AND PHASE AS

SHOWN (ONE-LINE DIAGRAM).

225/3

"1H"

DISTRIBUTION PANELBOARD, MOTOR CONTROL CENTER,

PLUG-IN BUSWAY, MEDIUM VOLTAGE SWITCHBOARD

(ONE-LINE DIAGRAM).

"1DPHA"

PANELBOARD WITH MAIN AND SUB FEED CIRCUIT BREAKER

(ONE-LINE DIAGRAM).

60/3

225/3

"1H"

DISCONNECT SWITCH, FUSED.

PANELBOARD CABINET, FLUSH MOUNTED.

PANELBOARD CABINET, SURFACE MOUNTED, 1 SECTION.

PANELBOARD CABINET, SURFACE MOUNTED, 2 SECTION.

DP#__

DISTRIBUTION PANEL OR SWITCHBOARD.

SWITCH, TOGGLE MOTOR STARTER WITH OVERLOAD

PROTECTION.ST

TRANSFORMER (SEE ONE-LINE FOR SIZE)

METER.M

DUPLEX

RECEPTACLE

DUPLEX RECEPTACLE

WALL PHONE PAY PHONE

FINISHED FLOOR

WALL BRACKET TVGENERAL USE:

NO SPECIAL

REQUIREMENTS

DEDICATED

RECEPTACLE

FOR SPECIAL

EQUIPMENT

ABOVE

COUNTER - TYPICAL

RECEPTACLES ABOVE OR BELOW COUNTER

WINDOW

OR

COMMUNICATIONS

RECEPTACLE

COMMUNICATIONS

RECEPTACLE COUNTER TOP

GROMMET

COMMUNICATIONS

RECEPTACLE

" M

AX C

O

O R

D

IN

AT

E

W

IT

H E

Q U

IP

M

EN

T

C O

O R

D

IN

AT

E

H

EI

G H

T W

IT

H

EQ

U

IP

M

EN

T

" M

AX ±4

6"

M

AX

(V

ER

IF

Y

H

EI

G H

T O

F

BA

C

KS

PL

AS

H

2' -0

16" MIN

REFER TO ARCHITECTURAL ELEVATIONS

FOR PLACEMENT OF OUTLETS

" M

IN

BOXES ON OPPOSITE SIDES OF WALL

STUD IN

BETWEEN

24"

MIN

FOR LESS THAN 24"

SEPARATION, PROVIDE LISTED

SOUND AND FIRE PUTTY PADS

GENERAL

USE: ADA

STANDARD DOOR

FINISHED FLOOR

DOOR WITH SIDELIGHT

LESS THAN 2'

DOOR WITH SIDELIGHT

GREATER THAN 2'

CABINETS

DOOR WITH NO

PLACE FOR SWITCH

AT LATCH SIDE

COMBINATION 48" MAX

PLATE FOR SWITCH AND

RECEPTACLE IN

RESIDENTIAL BATHROOM

LIGHTING

CONTROL STATION

SWITCH

LOCATION

SIDELIGHT

LESS THAN 2'

SIDELIGHT

GREATER

THAN 2'

SWITCH

LOCATION

METAL

FRAME

" M

AX

" M

AX

" M

AX

METAL

FRAME

SWITCH

LOCATION

SWITCH

LOCATION

COMMUNICATIONS

RECEPTACLE

COMMUNICATIONS

RECEPTACLE

TILE WALLSWALL BRACKET TV

DEDICATED

RECEPTACLE

FOR SPECIAL

EQUIPMENT

MIRROR

FINISHED FLOOR

NO SPECIAL REQUIREMENTS

GENERAL USE:

DUPLEX

RECEPTACLE

CENTER

IN TILE

DO NOT LOCATE

ABOVE SINK

WALLWALL

COORDINATE LOCATION

OF QUAD/ DUPLEX

OUTLET WITH EQUIPMENT

SUPPLIER

MOUNT QUAD/

DUPLEX OUTLET

BEHIND WATER

COOLER

REGULAR ADA

DRINKING FOUNTAIN - SIDE ELEVATIONSRECEPTACLES BELOW COUNTER

WINDOW

COUNTER TOP

GROMMET

DUPLEX RECEPTACLE

DUPLEX

RECEPTACLE

RECEPTACLES ABOVE COUNTER

WITH BACKSPLASHWITHOUT BACKSPLASH

COUNTER TOP

BACKSPLASH

2' -0

C O

O R

D

IN

AT

E

H

EI

G H

T W

IT

H

EQ

U

IP

M

EN

T

M

AX

M

AX

6" M

AX

6" M

AX

" M

IN

" M

IN

EQEQ

EQEQ

EQ

KING STUD/

FRAMING

(TYP)

FIRE ALARM

HORN/ STROBE

(TYP)

WALL SWITCH

(TYP)

VOLUME

CONTROL

(TYP)

ENVIRONMENTAL

CONTROLS

(THERMOSTAT)

DUPLEX

RECEPTACLE

(TYP)

DATA

RECEPTACLE

(TYP)

CARD READER

FIRE ALARM

PULL STATION

AL

IG

N (T

YP

SIGNAGE

(SEE ARCHITECTURAL

PLANS AND DETAILS

FOR LOCATIONS AND

MOUNTING HEIGHTS)

DOOR

(TYP)

AL

IG

N (T

YP

AL

IG

N (T

YP

FINISHED

FLOOR

FINISHED

FLOOR

ALIGN

(TYP) AL

IG

N

(T

YP

AL

IG

N (T

YP

SCALE: NTSE7 COMMUNICATIONS MOUNTING DETAILS

SCALE: NTS

BOX MOUNTING DETAILSF4

SCALE: NTSE3 SWITCH MOUNTING DETAILS

SCALE: NTSB3 RECEPTACLE MOUNTING DETAILS

GENERAL SHEET NOTES

SCALE: NTSF6 TYPICAL WALL MOUNTED DEVICES ALIGNMENT DETAIL

1 MOUNTING HEIGHTS OF ELECTRICAL AND ELECTRONIC EQUIPMENT IN THE

FOLLOWING ORDER OF PRIORITY:

A - ELEVATIONS (ARCHITECTURAL, ELECTRICAL, MECHANICAL, ETC).

B - EQUIPMENT SHOP DRAWINGS.

C - FIELD INSTRUCTIONS.

2 LOCATE RECEPTACLES SERVING THE SAME TYPE OF USE AT A UNIFORM HEIGHT

UNLESS DIRECTED OTHERWISE.

3 MECHANICAL, ELECTRICAL, AND COMMUNICATION ROOMS:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .