Attachment 2 Improve lighting SOW.docx
DOCX document 241 KB Posted
- Attached to
- AE 692-21-101 Improve Site Lighting
- Solicitation number
- 36C26024Q0114
About this file
This scope of work document outlines requirements for an architectural and engineering design services contract to improve site lighting and lighting controls at a Department of Veterans Affairs medical center. The project involves replacing interior and exterior lighting fixtures with new LED fixtures and installing lighting controls. Key deliverables for the design firm include 25%, 75%, 95%, and 100% construction document submittals with cost estimates at each stage. The period of performance for design is 180 calendar days. Review times are allotted for each submittal. The related federal contract opportunity is a pre-solicitation notice for the design contract with solicitation number 36C26024Q0114 and is issued by the VA Veterans Health Administration VISN 20.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF330_Part_2.pdf | ||
| Attachment 1 - SF330-21_Part_1.pdf | ||
| 36C26024Q0114.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Improve Site Lighting and Lighting Controls for Energy Efficiency Project No: 692-21-101
SCOPE OF WORK
ONE: PROJECT DESCRIPTION
1) BUSINESS CASE
a) This project will include lighting and lighting controls for improved energy efficiency throughout the VA SORCC ( Southern Oregon Rehabilitation Center & Clinics).
b) This project is located at 8495 Crater Lake Avenue, VA SORCC in White City, Oregon.
2) DETAILED PROJECT DESCRIPTION
a) This project will replace interior and exterior lighting for the reduction of Energy usage, and productivity improvement. New lighting will include the utilization of lighting sensors as appropriate. Areas that have priority for new light fixtures include but not limited to: areas currently illuminated 24 hours, hallways, stairways, and areas without lighting controls. The project will require the design professionals to determine the need to replace lighting based on initial meetings with the VA, followed by subsequent development of drawings and specifications for construction of a complete stand-alone project. A/E Design team will determine existing conditions, performing field verifications as necessary.
b) All lighting fixtures for this project will be new LED lighting fixtures and will have lighting controls. Bi-Level Dimming provides 100% light level when the area is occupied, while unoccupied the light level will dim down to a preselected level thus saving energy. The same new lighting fixture with Bi-Level dimming can be utilized for all hallways this project concerns. The same lighting fixture with Bi-Level dimming can be utilized for all stairways this project concerns. For the hallways and the stairways, the new LED light fixture will have Bi-Level lighting controls individually for each light fixture.
c) Some exterior doors currently have inadequate lighting for egress and inadequate lighting controls, please see picture. Many of these subject exterior doors could use the same LED light fixture with dusk to dawn lighting controls. If offices are included in this project, new LED lighting fixtures with manual dimming and manual off controls should be included along with occupancy controls. Some of the flag poles at this facility may need improved lighting. The construction estimated cost for this project will only afford a limited number of light fixtures that can be replaced. Design should concentrate to maximize the energy usage and productivity improvement that will utilize this limited amount of lighting fixtures and controls and not concern other possible future lighting project areas.
(Existing example of subject Exterior Building Door)
d) Background: The VA SORCC, has already completed various projects throughout the site to replace lighting with Energy efficient lighting and provide appropriate lighting sensors as part of larger building replacement type projects. This project concerns Energy efficient lighting as the major component.
TWO: DESIGN REQUIREMENTS
1) GENERAL
a) The project requires the Architect Engineer (A/E), to survey, assess, inspect, and site verify the existing conditions and produce a design to accomplish the project. The project scope is to include architectural, structural, plumbing, mechanical, seismic, and electrical systems. The A/E shall prepare all plans and specifications necessary for the construction project. The A/E shall provide all labor, materials, and equipment for the design, and post construction services needed to complete the project.
b) Compliance to all known applicable codes will be reflected in the completed design and construction documents. Since this is a federal government project, the VA uses the most current ICC federal codes along with only applicable local jurisdiction codes. All VA specifications, design manuals, and other relevant information can be accessed at internet site http://www.cfm.va.gov. The VA SORCC applicable requirements shall also be utilized. (Such as Lock Out Tag Out procedures).
c) The A/E is responsible for providing records for all meeting minutes, issues, risks, and distributing them throughout the design team and VA project manager/COR. The A/E shall provide the COR the meeting minutes for each meeting during the design. The meeting minutes shall include every topic discussed, and a list of attendees. The records will include actionable items, person responsible, when needed and when completed. The meeting minutes will be emailed to the COR within five business days after the meeting.
d) The A/E design shall require the construction contractor to assure the continued operation of the facility including vehicle and pedestrian routing plans and temporary lighting.
e) When life safety may be impacted during construction, the A/E shall design interim life safety measures as part of the construction documents.
f) When infection control may be impacted during construction, the A/E shall design the appropriate controls to follow to minimize subject impact.
g) The A/E will enroll the project and coordinate with the Energy trust of Oregon concerning possible ETO rebates and ensure the appropriate documentation is available for subject rebates.
h) Lighting studies, if appropriate shall be tailored to the complexity of the project specific area.
2) SITE INVESTIGATION AND FIELD WORK
a) The A/E shall make an on-site inspection of all areas within the scope of the project to familiarize themselves with existing conditions. The A/E shall visit the site, as required, to obtain total details of the specifics required for the work, including, but not limited to, architectural, mechanical, electrical, etc., to fully complete the drawings and specifications without omission. Arrangements for visits shall be made to the COR with at least 96-hours advance notice.
b) The A/E is responsible for researching all data for this design. Pertinent data and as-built data may be located within the technical reference storage area in Building 227 for the A/E to review. Or in some cases electronically which must be requested from the VA FMS staff, the COR. This VA data will be made available to the A/E for reference only, and the A/E is responsible for checking the accuracy of all data used. The final drawings submitted by the A/E shall be originals produced by A/E and shall be the result of the field check.
c) The A/E design shall include a site survey as needed to determine the best location for appropriate Energy efficient lighting to occur after discussion with the VA design team.
d) The A/E shall accomplish a utility locate to clearly identify the locations and elevations of existing utilities, and to comply with Lockout/Tagout requirements; as pertains to all lighting to be removed, removed and replaced, or new installation locations. The results of the utility/electrical locate shall be incorporated into the drawings. This includes the specific electrical panel/breaker for the lighting.
3) PLANS, DOCUMENTS, AND MODEL PRODUCTION
a) The use of VA furnished drawings and specifications does not preclude A/E verification responsibility. The A/E firm needs to verify all typical drawings for re-use and is to take full responsibility. All final documents and drawings must be sealed and signed by a Registered Design Professional responsible for their work.
b) Reserved.
c) The A/E must provide the government with an accurate and clear design for construction meeting all requirements listed in the A/E Scope of Work and within the Contract Documents.
d) Drawings shall be done in plan view at a minimum scale of 1/8" = 1'-0", where necessary, and, generally, 1/4" = 1'-0" or larger. Details will be done in minimum scale of 1/4" = 1'-0" or larger. Drawings shall be prepared using AutoCAD. All drawings in project set shall be on same type and size sheets. The designer shall confer with the VA on specific title block requirements. The A/E will provide a minimum of two sets of 17” X 24” size drawings with each submittal, including pdf versions.
e) Specifications shall be based on the Department of Veterans Affairs Master Construction Specifications with A/E revisions, additions, deletions, etc., required to assure all phases and facets of work are specifically covered without omission. The A/E will be responsible for reviewing the section requested to revise, add, delete, etc., prior to his typing the finished specification package. The Department of Veterans Affairs Master Construction Specifications provided must be thoroughly reviewed to delete and update reference items and Federal Specifications cited in order to make everything concurrent with the work performed; unnecessary items shall be deleted in total. The primary specifications must be thoroughly reviewed and tailored to delete items from the specifications that do not apply to the work to be performed. The intent is to provide a package that is suitable for the project to enable the contractor to perform the work in the best possible manner without reviewing unnecessary details.
f) Where multiplicity is referenced in the provided specifications, the A/E shall identify and consult VA SORCC Facilities Management Service to eliminate such multiplicity. The contractor shall not be given alternatives or choices but must provide specific items as detailed in the specifications. The A/E, during his visit with SORCC Facilities Management Service, shall obtain the name and type of materials currently used and necessary for use on the contract for which he is responsible. In the specifications, the items shall be named specifically with an add-on statement such as: "or approved equal." The only variation wherein that may occur is when an item cannot be substituted due to maintenance requirements at the VA SORCC. If applicable, information on such items shall be provided to the A/E by the Department of Veterans Affairs.
g) If necessary, the A/E shall also prepare independent specifications section "SR - SPECIAL REQUIREMENTS," wherein detailed phasing of work to be accomplished will be described in sequential order. Section shall be prepared using standard format of other specification sections. The same format is defined as all having the same font, spacing, section breaks, headers, footers, numbering, highlighting, font size, underlining, etc. All required interruptions of space. Lighting, and utilities will be carefully designed with time frames and shown on the drawings and specifications.
4) DEMOLITION OF EXISTING
a) Provide demolition plans as applicable in and for all disciplines/trades, as appropriate for each different type of lighting fixture to be removed.
5) COMMISSIONING
a) The A/E will ensure that the construction contractor appropriately test the operation of all lighting fixtures and lighting controls during appropriate installation intervals.
b) Reserved.
6) COST ESTIMATING AND BUDGET
a) As part of the design proposal package, the A/E shall prepare a construction cost estimate. The estimate comprehensive enough to, identifying all areas of cost related to the construction per the Office of Facilities Management guidelines. http://www.cfm.va.gov . Prepare all detailed cost estimates using Microsoft Excel and submit/provide all detailed cost estimates in Excel and PDF format.
b) The AE shall design within the VA funding limit construction cost target, as provided by the Contracting officer.
7) CONSTRUCTION PERIOD SERVICES
a) The AE shall provide all necessary construction period services to include but not limited to construction contractor submittal review, periodic construction inspections and reports, telephone consultation, review of change order proposal, and design changes as necessary. Construction period services shall occur through the duration of the construction contract.
b) A/E representation at weekly project construction meetings is required ( Teleconference call -ins by the A/E will be allowed).
c) Construction Change Orders, the overall A/E response to these and RFI’s below will depend on the overall dollar value of the subject change order/RFI.
i) The AE shall review contractor change proposals and provide the contracting officer a technical analysis of each proposal.
ii) The AE shall develop appropriate cost estimates for all construction change order work. These estimates are to be used in the technical analysis of each proposal and shall be provided to the contracting officer as part of the analysis.
iii) Technical analysis shall include a comparison of the proposal and AE cost estimate with narrative explanation of where and why the two documents disagree.
d) Request for Information (RFI)
i) The AE shall respond to RFI’s submitted by the contractor within 7 calendar days.
ii) RFI responses shall be limited to answering the questions submitted. AE or AE consultant opinions on contract document clarity, legitimacy of change requests, etc. shall be submitted via email to the COR and Contracting Officer separately from the RFI response.
e) Quality Control
i) Planned A/E visits during the construction phase will include inspections of the construction progress.
THREE: WORK and DELIVERABLES
1) GENERAL
a) Deliverables referenced below refer to hard copies and electronic copies at each submittal unless noted.
b) VA SORCC may incorporate edits in both hard copy form and electronically.
2) DESIGN SUBMITTAL SUMMARY
a) After VA SORCC design kick-off meeting, at which time the A/E will meet with the VA Design team to understand (and guide) general needs of the design which may be by teleconference at A/E option, the following work/submittals is required.
i) Construction Documents - 25% Submittal (Considered “Part A” services)
ii) Construction Documents - 75% Submittal with initial cost Estimate
iii) Construction Documents – 95% Submittal, with final cost estimate
iv) Construction Documents – Final Bid Set
b) Beginning with the contract kickoff meeting. Each design stage will provide the subject submittal will be initiated with VA / A/E meeting before submittal via teleconference. Each submittal will be followed by a meeting with A/E via teleconference. A/E may incorporate their field verification site visits to coincide with the review meetings. All meetings require minutes be prepared by the A/E and delivered to VA within one week.
3) CONSTRUCTION DOCUMENTS – 25% SUBMITTAL
a) Submit 25% working drawings:
b) Architectural Cover Sheet, appropriate Construction drawings at 25% complete. MEP drawings should start to identify existing versus new. Submit rough Cost Estimate based on the proposed, to include as a minimum the estimated number of overall light fixtures and controls, and labor to install subject fixtures.
c) A/E review with VA.
4) CONSTRUCTION DOCUMENTS – 75% SUBMITTAL
a) Submit 75% working drawings and specifications for all disciplines, including demolition plans. Legend and detail sheets should be in progress. Provide detailed cost estimate for project construction.
b) A/E review with VA.
5) CONSTRUCTION DOCUMENTS – 95% SUBMITTAL
a) Submit 95% working drawings.
b) The intent of this submittal is that VA SORCC will comment on this package so the A/E can move to Final Bid Set. All plans shall be substantially complete. Submit specifications electronically, with editing in Word, using the track changes feature. Submit updated Cost Estimate.
c) VA SORCC review will be based in the idea that this submittal, following comment, can be taken to final. As such, submittals less than 95% percent or better are subject to rejection.
6) CONSTRUCTION DOCUMENTS – FINAL BID SET
a) Submit Final Construction Set drawings.
b) Submit complete, Design Professional sealed and signed documents. Submit Final Cost Estimate.
c) Submit sealed and SE signed Structural Calculations package, if appropriate.
FOUR: Design Schedule
1) The Period of Performance (POP) for design for this project is 180 Calendar days. The A/E shall provide a schedule within 11 calendar days of NTP. The schedule shall incorporate the following periods of time for VA SORCC review:
VA REVIEW TIME REQUIRED
| · 25% Construction Documents | 15 Calendar days | |
| · 75% Construction Documents | 15 Calendar days | |
| · 95% Construction Documents | 15 Calendar days | |
| · Final CD | 15 Calendar days |
FIVE: Required VA References
1) DESIGN MANUALS: VA TIL , DESIGN MANUALS (PG-18-10) - Office of Construction & Facilities Management (va.gov) , including but not limited to: VA Lighting Design Manual
VA SORCC, White City, OR 2 image1.png image2.jpeg
File details come from the government source that posted it. Updated .