This document is an amendment to a solicitation for network cabling services at the Mann-Grandstaff VA Medical Center in Spokane, Washington. The Department of Veterans Affairs is seeking a contractor to provide network cabling installation and maintenance for its Veterans Integrated Service Network 20 locations. Services include installing new network cabling and conduit as needed, with licensed electricians required for both low-voltage and high-voltage work. The period of performance begins September 1, 2023. The amendment provides answers to vendor questions, clarifying that service contract wage determinations apply, existing licenses are required for bidding, and emergency response times of 6-8 hours for the Wenatchee location are acceptable. No material markups will be allowed given most materials are government-furnished.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
12 July 2023
668-23-4-5057-0038
36C260
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
36C260
NCO 20 Network Contracting Office
ATTN: V4CONT
1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661
To all Offerors/Bidders 36C26023Q0609
07-12-2023 X
X X
668-3630162-5057-855100-2580 010055590
X 1
1. The purpose of this amendment is to provide Questions and Answers received in response to the solicitation. Reference Q&A below.
2. For any Q&A that updated PWS, see revisions to PWS included attached "S02 RFQ 36C26023Q0609 Network Cabling Spokane 12Jul23."
3. There are no other changes as a result of this amendment. All other terms and conditions remain unchanged.
CONTINUATION PAGE
Networking Cabling RFQ Q&A – 36C26023Q0609
Q1. Would the wage determination follow the Davis Bacon Act or are we to use the determinations provided with the solicitation? Not sure installing conduit and new dedicated circuits fall under Electrician / maintenance wage.
A1. The requirement is a service and not considered construction. Service Contract Wage Determination applies. See D.1-D.3.
Q2. We are licensed in Washington and are working on getting our license in Idaho. Can we still bid the project while trying to obtain the Idaho licensing?
A2. Due to period of performance starting 1 September 2023 and safety concerns, the contractor must have existing Washington and Idaho licenses at the time of quote submission. In progress licensing is not acceptable.
Q3. It states that the VA will reimburse for travel, would that include lodging for a longer work order as long as mileage?
A3. No. See 52.212-4(i)(ii)(D)(1).
Q4. Question on Permitting: Washington state requires plan review for permits on work in Hospitals and Health and person care facilities per WAC 296-46B-900 for some electrical work.
If the work order falls under the plan review requirements that could delay the permit process which will delay the work order.
A4. We accept the delay due to State permitting requirements. (PWS is updated)
Q5. Re: Item 3.14, Power Requirements on RFQ page 10 of 110, is there a licensed electrician requirement for high-voltage work, low-voltage work (i.e., 70 volts or less), or both? Also, how much high-voltage electrical outlet work would the VA anticipate under this RFQ?
A5. Yes, a licensed electrician requirement for both high-voltage work and low-voltage work is required. The requirement for high voltage electrical outlets is as needed.
Q6. Would the VA consider allowing vendors to add a fair and reasonable 5%, 10%, or 15% charge for material handling [per Section 4.4, bottom of page 10 of 110]? This would include the effort required to get the best pricing for the VA for necessary materials; generate the appropriate price quote; submit it for VA approval; order the item(s) in question; track the item(s) through the supply chain; and ensure the correct items are delivered to the VA facility.
A6. No. Most material is provided by the Government and minimal will be required by the Contractor to provide. To simplify administration of the contract, there will be no material mark-up allowed. Please reference 52.216-31 for how to price Time-and-Material contracts.
Q7. Would the VA allow vendors to have a more realistic 6- to 8-hour emergency response time for emergencies in Wenatchee, WA, due to the longer travel time to get to that facility from the greater Spokane metropolitan area? [Re: Section 5, Hours of Operations, RFQ page 11 of 110]
A7. Yes 6-8 hour emergency response to Wenatchee only is acceptable to the VA.
(PWS is updated)
Q8. Does the VA require vendors to submit Representations and Certifications information in their response [found mostly in RFQ pages 93 through 110 of 110]
A8. See E.12 52.212-3, 1st paragraph for instructions.
<End of Q&A>