T9E T9N T10E T10N TCC.pdf

PDF 71 KB Posted

Attached to
H159--Tri Annual Electrical Testing Boise VAMC
Solicitation number
36C26023Q0055
Issued by

View the file

Other files

File Type Posted
Facility Transformer Schedule.xlsx XLSX spreadsheet
Triannual Test Summary 2020.pdf PDF
Boise VAMC One-Line.pdf PDF
36C26023Q0055 0001.docx DOCX document
Boise VAMC Protective Device List.xls XLS spreadsheet
sh5265 Final.pdf PDF
Triannual Elec. Test Site Walk Sign In.pdf PDF
36C26023Q0055.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

85-GD11_MCB

General Electric Entelliguard Sensor = 1600 (LSIG) Plug = 1600 Amps LT Pickup = 0.95 (1520 Amps) LT Band = 2 ST Pickup = 7 (10640 Amps) ST Band = 4 (I^x)t = OUT Inst. Pickup = 9 (14400 Amps)

85-GD11_CBL - P

MFR6 E1 - P

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 1.2 (0.5 - 2.4 xCT Sec) Time Dial = 0.3 3x = 3.71 s, 5x = 1.24 s, 8x = 0.471 s

T10E Inrush T10E

FUSE T10E

Cooper Bay-O-Net (High Ampere) Other 15.5 kV C04

REC 14E-5 - P

TCC

Cooper Tri-Phase

KF

Pickup = 140 (20 - 1290 Primary) Interrupting Time = 5 Cycles 3x = 0.702 s, 5x = 0.281 s, 8x = 0.121 s Clearing

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 GANG SWITCH 14E/E1 (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 GANG SWITCH 14E/E1 (Nom. kV=12.47, Plot Ref. kV=12.47) 2598K129.9 1K 10K 100K 1000K300 500 3K 5K 30K 300K

Amps T10E_SEC (Nom. kV=0.48, Plot Ref. kV=0.48)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T10E_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\0805

Date: 09-23-2011

SN: WOODHARBI2

Rev: Base Fault: Phase

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

oCT E1 200/5

T10E_SEC

0.48 kV

85-GD11

0.48 kV

REC 14E-5

0 kA

1.01 kV 0 A

85-GD11_MCB

65 kA

0.48 kV 1600 A

T10E

5.69 %Z 12.47/0.48 kV 1000 kVA

FUSE T10E

2.5 kA

15.5 kV 100 A

R MFR6 E1

51P/51N

85-GD11_CBL

0.039+j0.05 ohms/1000ft

12-1/C 350

CU

45 ft

MFR6 E1 - G

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 0.5 (0.1 - 1 xCT Sec) Time Dial = 0.26 3x = 3.22 s, 5x = 1.07 s, 8x = 0.409 s

REC 14E-5 - G

TCC

Cooper Tri-Phase

EF

Pickup = 50 (10 - 640 Primary) Interrupting Time = 5 Cycles 3x = 0.674 s, 5x = 0.271 s, 8x = 0.134 s Clearing

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47) 299.8K14.99 100 1K 10K 100K30 50 300 500 3K 5K 30K

Amps (Plot Ref. kV=4.16)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T10E_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\0805

Date: 09-23-2011

SN: WOODHARBI2

Rev: Base Fault: Ground

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

oCT E1 200/5

T10E_SEC

0.48 kV

85-GD11

0.48 kV

REC 14E-5

0 kA

1.01 kV 0 A

85-GD11_MCB

65 kA

0.48 kV 1600 A

T10E

5.69 %Z 12.47/0.48 kV 1000 kVA

FUSE T10E

2.5 kA

15.5 kV 100 A

R MFR6 E1

51P/51N

85-GD11_CBL

0.039+j0.05 ohms/1000ft

12-1/C 350

45 ft

85-ND12_CBL - P

85-ND12_MCB

General Electric Entelliguard Sensor = 1600 (LSIG) Plug = 1600 Amps LT Pickup = 0.95 (1520 Amps) LT Band = 2 ST Pickup = 7 (10640 Amps) ST Band = 4 (I^x)t = OUT Inst. Pickup = 9 (14400 Amps)

MFR6 52N1 - P

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 1.2 (0.5 - 2.4 xCT Sec) Time Dial = 0.3 3x = 3.71 s, 5x = 1.24 s, 8x = 0.471 s

T10N Inrush

REC 14N-4 - P

TCC

Cooper Tri-Phase

KF

Pickup = 140 (20 - 1290 Primary) Interrupting Time = 25 ms 3x = 0.702 s, 5x = 0.281 s, 8x = 0.121 s Clearing

T10N 1000 kVA (Secondary) 5.69 %Z Delta-Wye Solid Grd Curve Shift = 0.58

FUSE T10N

Cooper Bay-O-Net (High Ampere) Other 15.5 kV C04

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 T10N PRI. (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 T10N PRI. (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T10N_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08058_01\08058_01.OTI

Date: 09/23/2011

SN: WOODHARBI2

Rev: Base Fault: Phase

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

oCT N1 200/5

T10N_SEC

0.48 kV

85-ND11/12

0.48 kV

85-ND12_MCB

65 kA

0.48 kV 1600 A

85-ND12_CBL

0.039+j0.05 ohms/1000ft

12-1/C 350

CU

40 ft

T10N

5.69 %Z 12.47/0.48 kV 1000 kVA

FUSE T10N

2.5 kA

15.5 kV 100 A

REC 14N-4

12 kA 15 kV 600 A

R

MFR6 52N1

51P/51N

MFR6 52N1 - G

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 0.5 (0.1 - 1 xCT Sec) Time Dial = 0.26 3x = 3.22 s, 5x = 1.07 s, 8x = 0.409 s

REC 14N-4 - G

TCC

Cooper Tri-Phase

EF

Pickup = 50 (10 - 640 Primary) Interrupting Time = 25 ms 3x = 0.674 s, 5x = 0.271 s, 8x = 0.134 s Clearing

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83N (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83N (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T10N_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08058_01\08058_01.OTI

Date: 09/23/2011

SN: WOODHARBI2

Rev: Base Fault: Ground

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

oCT N1 200/5

T10N_SEC

0.48 kV

85-ND11/12

0.48 kV

85-ND12_MCB

65 kA

0.48 kV 1600 A

T10N

5.69 %Z 12.47/0.48 kV 1000 kVA

FUSE T10N

2.5 kA

15.5 kV 100 A

REC 14N-4

12 kA 15 kV 600 A

R

MFR6 52N1

51P/51N

85-ND12_CBL

0.039+j0.05 ohms/1000ft

12-1/C 350

40 ft

67-GDG1_FDR - P

67-GDG1_CB

General Electric MVT-PM (SS,SH) Sensor = 800 (LSIG) Plug = 800 Amps LT Pickup = 1 (800 Amps) LT Band = 2 ST Pickup = 9 (7200 Amps) ST Band = Min(1) (I^x)t = OUT Inst. Pickup = 10 (8000 Amps)

MFR6 E1 - P

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 1.2 (0.5 - 2.4 xCT Sec) Time Dial = 0.3 3x = 3.71 s, 5x = 1.24 s, 8x = 0.471 s

REC 14E-6 - P

TCC

Cooper Tri-Phase

KF

Pickup = 90 (20 - 1290 Primary) Interrupting Time = 5 Cycles 3x = 0.702 s, 5x = 0.281 s, 8x = 0.121 s Clearing

T9E 500 kVA (Secondary) 4.66 %Z Delta-Wye Solid Grd Curve Shift = 0.58

T9E Inrush

FUSE T9E

Cooper Bay-O-Net Other 15.5 kV C12

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T9E_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08

Date: 09-23-2011

SN: WOODHARBI2

Rev: Base Fault: Phase

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

67-GDG1

0.48 kV oCT E1 200/5

FUSE T9E

2.5 kA

15.5 kV 50 A

T9E

4.66 %Z 12.47/0.48 kV 500 kVA

REC 14E-6

0 kA

1.01 kV 0 A

R

MFR6 E1

51P/51N

67-GDG1_FDR

0.039+j0.05 ohms/1000ft

6-1/C 350

CU

100 ft

67-GDG1_CB

65 kA

0.48 kV 800 A

MFR6 E1 - G

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 0.5 (0.1 - 1 xCT Sec) Time Dial = 0.26 3x = 3.22 s, 5x = 1.07 s, 8x = 0.409 s

REC 14E-6 - G

TCC

Cooper Tri-Phase

EF

Pickup = 50 (10 - 640 Primary) Interrupting Time = 5 Cycles 3x = 0.674 s, 5x = 0.271 s, 8x = 0.134 s Clearing

REC 14E-6 - LG

2.059kA @ 12.47kV (Asym)

MFR6 E1 - G - LG

2.131kA @ 12.47kV (Asym)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83E (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T9E_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08

Date: 09-23-2011

SN: WOODHARBI2

Rev: Base Fault: Ground

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

67-GDG1

0.48 kV oCT E1 200/5

FUSE T9E

2.5 kA

15.5 kV 50 A

T9E

4.66 %Z 12.47/0.48 kV 500 kVA

REC 14E-6

0 kA

1.01 kV 0 A

R

MFR6 E1

51P/51N

67-GDG1_CB

65 kA

0.48 kV 800 A

67-GDG1_FDR

0.039+j0.05 ohms/1000ft

6-1/C 350

100 ft

67-NDG1_FDR - P

67-NDG1_CB

General Electric MVT-PM (SS,SH) Sensor = 800 (LSIG) Plug = 800 Amps LT Pickup = 1 (800 Amps) LT Band = 2 ST Pickup = 9 (7200 Amps) ST Band = Min(1) (I^x)t = OUT Inst. Pickup = 10 (8000 Amps)

MFR6 52N1 - P

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 1.2 (0.5 - 2.4 xCT Sec) Time Dial = 0.3 3x = 3.71 s, 5x = 1.24 s, 8x = 0.471 s

REC 14N-3 T9N - P

TCC

Cooper Tri-Phase

KF

Pickup = 90 (20 - 1290 Primary) Interrupting Time = 5 Cycles 3x = 0.702 s, 5x = 0.281 s, 8x = 0.121 s Clearing

T9N

T9N Inrush

FUSE T9N

Cooper Bay-O-Net Other 15.5 kV C12

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83N (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 BUS 83N (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T9N_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08

Date: 09/23/2011

SN: WOODHARBI2

Rev: Base Fault: Phase

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

67-NDG1

0.48 kV o

CT N1

200/5

FUSE T9N

2.5 kA

15.5 kV 50 A

T9N

4.66 %Z 12.47/0.48 kV 500 kVA

REC 14N-3 T9N

0 kA

1.01 kV 0 A

R

MFR6 52N1

51P/51N

67-NDG1_FDR

0.039+j0.05 ohms/1000ft

6-1/C 350

CU

60 ft

67-NDG1_CB

65 kA

0.48 kV 800 A

REC 14N-3 T9N - G

TCC

Cooper Tri-Phase

EF

Pickup = 50 (10 - 640 Primary) Interrupting Time = 5 Cycles 3x = 0.674 s, 5x = 0.271 s, 8x = 0.134 s Clearing

MFR6 52N1 - G

OC1

Square D Sepam Series 40 CT Ratio 200:5 Extremely Inverse Time Pickup = 0.5 (0.1 - 1 xCT Sec) Time Dial = 0.26 3x = 3.22 s, 5x = 1.07 s, 8x = 0.409 s

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 GANG SWITCH 14N/N1 (Nom. kV=12.47, Plot Ref. kV=12.47)

10K.5 1 10 100 1K3 5 30 50 300 500 3K 5K

Amps X 10 GANG SWITCH 14N/N1 (Nom. kV=12.47, Plot Ref. kV=12.47)

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K S ec on ds

10K

.001

.01

.1

1K

.003

.005

.03

.05

.3

.5

3K

5K

S econds

ETAP Star 12.0.0C

T9N_MV

Project: ELECTRICAL SYSTEM CORR. PH 1B Location: Boise, ID Contract: 531-09-132 Engineer: Bruce G. Alward, P.E.

Filename: S:\ETAP Databases\Veterans Administration\Boise\08

Date: 09/23/2011

SN: WOODHARBI2

Rev: Base Fault: Ground

ELECTRICAL SYSTEM CORRECTIONS, PHASE 1B

67-NDG1

0.48 kV o

CT N1

200/5

FUSE T9N

2.5 kA

15.5 kV 50 A

T9N

4.66 %Z 12.47/0.48 kV 500 kVA

REC 14N-3 T9N

0 kA

1.01 kV 0 A

R

MFR6 52N1

51P/51N

67-NDG1_CB

65 kA

0.48 kV 800 A

67-NDG1_FDR

0.039+j0.05 ohms/1000ft

6-1/C 350

60 ft

File details come from the government source that posted it. Updated .