The Department of Veterans Affairs, VA Medical Center in Spokane, Washington has a requirement for a Contractor to furnish the necessary personnel, material & expertise to Install Water Softeners at Bldgs. 12, 40 and 41, located in Spokane, WA. This will be awarded through a firm fixed price contract. Solicitation 36C26019Q0828 will be posted to FBO 08/29/2019.
This procurement is restricted to Vet Biz Certified SDVOSB.
Any firm that believes it can meet these requirements may give written notification to the Contracting Officer within the time frame listed on the solicitation. Supporting evidence must be furnished in sufficient detail to demonstrate the ability to comply with the requirements in the solicitation.
The North America Industry Classification System Code (NAICS) is 238220.
Contracting Office Address:
Department of Veterans Affairs Network Contracting Office 20 5115 NE 82nd Ave, Suite 102 Vancouver, WA 98662
Point of Contact(s):
Robert Giard Robert.Giard@va.gov
FedBizOpps Presolicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Presolicitation Notice Rev. March 2010 Install Water Softeners at Bldgs. 12, 40, and 41 668-18-115 98662 36C26019Q0828 09-16-2019 N 238220 Department of Veterans Affairs Network Contracting Office 20 5115 NE 82nd Ave, Suite 102 Vancouver WA 98662 Robert Giard robert.giard@va.gov Department of Veterans Affairs Spokane VA Medical Center 4815 N. Assembly Street Spokane 99205 Spokane Robert.Giard@va.gov Robert.Giard@va.gov
STATEMENT OF WORK (SOW)
as of 05/19/2015
| Contract Number: |
| (completed by the CO at time of award) |
| Task Order Number: |
| (completed by the CO at time of award if a TO) |
IFCAP Tracking Number:
| Follow-on to Contract and Task Order Number: |
| Not Applicable |
1. Contracting Officer’s Technical Representative (COTR).
| Name: |
| Emilio Carrillo |
| Section: |
| Engineering |
| Address: |
| 4815 N. Assembly, Spokane WA 99205 |
| Phone Number: |
| 509-434-7417 |
| Fax Number: |
| 509-434-7125 |
| E-Mail Address: |
| Emilio.Carrillo@va.gov |
2. Contract Title. Install new Water Softeners Buildings. 12, 40, and 41
3. Background.
The Veterans Affairs (VA) Spokane Healthcare System, Spokane, WA requires labor, materials, and equipment for the installation of four (4) new Water Softener Systems various capacities as specified in this Statement of Work. Water softeners location are Bldg. 41, Bldg. 40 and Bldg. 12.
4. Scope.
The contractor shall provide all supervision, labor, tools and materials, installation labor, programming, startup, training, O&M documentation and two-year warranty of materials and installation. Contractor shall do a field verification to ensure all equipment, parts and materials are identified and verify all the existing conditions.
4.1. Provide all labor and materials necessary for complete installation of three (3) water softener systems and provide a new water softening system meeting all salient characteristics of the solicitation.
4.1.1. Provide complete Vertical pressure type water softener system with pressure vessel, softening resin, control valve, brine maker and electronic controller. The system will be of an approved design as fabricated by a manufacturer regularly engaged in the production of water treatment equipment. All equipment and material will be supplied in compliance with the specifications as intended for a complete and operational system.
4.1.2. Qualified manufacturers of water softener equipment must have been engaged in the manufacture of this equipment for a period of not less than 5 years.
4.1.3. The brand name or equal system is the KING KS 210 and 120 water softener system, configured as Triplex Progressive/Water Meter/Demand. Salient characteristics for each water softener are provided in the solicitation/contract.
4.1.4. In addition, the following requirements shall be met:
4.1.4.1. The system must be skid-mounted in (2) sections with all interconnecting piping complete and flanges between the (2) sections.
4.1.4.2. The system must automatically send a signal to fill when regeneration is completed.
4.1.4.3. The system must include a remote monitor/radio frequency (RF) monitor for each unit...
4.1.4.5. The contractor shall provide insulation of all pipes.
4.1.4.6. The contractor shall provide water testing equipment.
4.1.4.7. The contractor shall provide a qualified manufacturer’s representative to check complete installation for conformance to manufacturer’s recommendation, to place the system into service, to make all adjustments required for full conformance to design and specified requirements and to perform all demonstrations and testing.
4.1.4.8 The contractor shall provide all necessary fitting, Unistrut’s and clamps, pipe hangars as necessary and insulation of all pipes
4.1.4.9. The contractor shall flush and disinfect new water lines and softener interiors in accordance with AWWA C651. Provide a written report to the VA COR.
4.1.4.10. An operating test shall be run in the presence of the Contracting Officer’s Representative (COR).
4.1.4.11. The contractor shall provide Commissioning documentation.
4.1.4.12. The contractor shall provide demonstration and training to VA personnel.
4.1.4.13 The contractor shall verify water softeners locations for space requirements.
4.1.4.14 Manufacture will provide the following items due to defects for the period:
Control Valve bodies -5 years Control valve parts-5 years Mineral tanks-5 years Brine tanks-5 years All brine, mechanical and moveable parts -2 Years No labor or freight charges will have warranted after the initial 1 year from start-up date.
5. Specific Tasks.
5.1 Task 1- Onsite Repairs
1. The contractor shall furnish and install three new commercial heavy-duty water softener systems with 2” Simplex electronic metered units that meet or exceed the following salient characteristics:
2.
a. Building 12 Softener shall meet or exceed the salient characteristics of the KING KS 210 Fusion or better Commercial Water Softener.
3. Grain Capacity of salt dosage- 15 lbs./cu ft.- 210,000
4. Resin tank size- 21X62
5. Resin Quantity- cu. ft- 7
6. Connecting Pipe Size- 2” NPT
7. Salt Tank Size(in)- 24X50
8. Salt Tank Capacity(lbs.)- 100 LBS
9. Operating Pressure- 30-125psi
10. Operating Temperature- 35-100 Fahrenheit
11. Max Drain Flow(gpm)- 12
12. Recharge Water Us (gal)e- 332
13. Max Clear Water Iron- 5ppm
14. Operating Flows:55 GPM, 70 GPM Peak
15. Duplex Operation
16. Snap Rings for easy connections
17. Screened Top Distributor
18. Brine Make-up flow control
19. Pin quick disconnect injector housing
20. 2” NPT Union Connections
21. Adjustable Backwash Flow Control
22. Full 2” Ported Flow Passage in valve Housing
23. High Torque 24VDC Motor
24. Valve Tank Adapter allows easy access into tank with clamp ring connector
25. Fully Programmable
26. Self-Diagnostic Capabilities
27. Safe 24-volt Electronics
28. Non- volatile memory
29. Washed quartz embedding
30. Counter-current brine
31. Dynamic brine making system
32. Electronic demand control module
33. Fully programmable
34. Self-cleaning upper and lower distributors
35. Commissioning of system sequence and operation with VA personnel.
36. Training of VAMC personnel.
b. Building 40 Softener shall meet or exceed the salient characteristics of the KING KS 210 Fusion or better Commercial Water Softener.
37. Grain Capacity of salt dosage- 15 lbs./cu ft.- 210,000
38. Resin tank size- 21X62
39. Resin Quantity- cu/ft.- 7
40. Connecting Pipe Size- 2” NPT
41. Salt Tank Size(in)- 24X50
42. Salt Tank Capacity(lbs.)- 100 LBS
43. Operating Pressure- 30-125psi
44. Operating Temperature- 35-100 Fahrenheit
45. Max Drain Flow(gpm)- 12
46. Recharge Water Us (gal)e- 332
47. Max Clear Water Iron- 5ppm
48. Operating Flows:55 GPM, 70 GPM Peak
49. Duplex Operation
50. Snap Rings for easy connections
51. Screened Top Distributor
52. Brine Make-up flow control
53. Pin quick disconnect injector housing
54. 2” NPT Union Connections
55. Adjustable Backwash Flow Control
56. Full 2” Ported Flow Passage in valve Housing
57. High Torque 24VDC Motor
58. Valve Tank Adapter allows easy access into tank with clamp ring connector
59. Fully Programmable
60. Self-Diagnostic Capabilities
61. Safe 24-volt Electronics
62. Non- volatile memory
63. Washed quartz embedding
64. Counter-current brine
65. Dynamic brine making system
66. Electronic demand control module
67. Fully programmable
68. Self-cleaning upper and lower distributors
69. Commissioning of system sequence and operation with VA personnel.
70. Training of VAMC personnel
c. Building 41 Softener shall meet or exceed the salient characteristics of the KING KS 120 Fusion or better Commercial Water Softener.
71. Grain Capacity of salt dosage- 15 lbs./cu ft.- 120,000
72. Resin tank size- 16X65
73. Resin Quantity- cu/ft.- 4
74. Connecting Pipe Size- 2” NPT
75. Salt Tank Size(in)- 24X50
76. Salt Tank Capacity(lbs)- 100 LBS
77. Operating Pressure- 30-125psi
78. Operating Temperature- 35-100 Fahrenheit
79. Max Drain Flow(gpm)- 12
80. Recharge Water Us (gal)e- 332
81. Max Clear Water Iron- 5ppm
82. Operating Flows:40 GPM, 57 GPM Peak
83. Duplex Operation
84. Snap Rings for easy connections
85. Screened Top Distributor
86. Brine Make-up flow control
87. Pin quick disconnect injector housing
88. 2” NPT Union Connections
89. Adjustable Backwash Flow Control
90. Full 2” Ported Flow Passage in valve Housing
91. High Torque 24VDC Motor
92. Valve Tank Adapter allows easy access into tank with clamp ring connector
93. Fully Programmable
94. Self-Diagnostic Capabilities
95. Safe 24-volt Electronics
96. Non- volatile memory
97. Washed quartz embedding
98. Counter-current brine
99. Dynamic brine making system
100. Electronic demand control module
101. Fully programmable
102. Self-cleaning upper and lower distributors
103. Commissioning of system sequence and operation with VA personnel.
104. Training of VAMC personnel
5.1 Task 2 – Scheduling of Repairs
The Contractor shall coordinate with the facility representative to schedule periods of performance. Contact will be made not less than 2 weeks prior to date/ time request. The Contractor will be escorted by the facility representative when effecting repairs. Parking will be permitted in the Contractor Vehicle parking only.
5.2 Task 3 Deliverables:Inspection, testing documents, and manuals and warranty documents per section 4 above.
6. Performance Monitoring
The Spokane VAMC facility subject matter expert assigned to the Engineering Service will evaluate the all work and testing performed. Items must be in a clean state and in a proper working condition and must be in an acceptable working condition.
7. Security Requirements All contractor employees are subject to the same level of investigation as VA employees who have access to VA sensitive information or routine access to VA Facilities. The level of background investigation commensurate with the level of access needed to perform the statement of work is: Not Applicable The Contactor will not have access to VA sensitive information.
They will be escorted by the facility representative always during their visits.
8. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).
The Contractor will not have access to any Government-Furnished Equipment. All equipment and supplies used under the terms of this contract will be the responsibility of the Contractor.
9. Other Pertinent Information or Special Considerations.
Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the results will be complete and fully operational plant that conforms to contract requirements. Visits to the site by potential bidders will be coordinated on a one time ONLY and ONLY one day for all potential contractors. The time and date yet to be determined.
Identification of Possible Follow-on Work.
There is no Identified Possible Follow-on Work.
| b. Identification of Potential Conflicts of Interest (COI). |
| The requesting entities have identified no Potential Conflicts of Interest. |
| c. Identification of Non-Disclosure Requirements. |
| The Contractor will not have access to any VA sensitive information. Non-Disclosure does not apply. |
d. Packaging, Packing and Shipping Instructions.
Not applicable
e. Inspection and Acceptance Criteria.
As part of final system acceptance, a systems demonstration is required. Prior to start of this demonstration, the contractor is to perform a complete validation of all aspects of the Controls and Instrumentation System. System operation and calibration shall be demonstrated by the installer in the presence of facility representative.
10. Risk Control There are no risk factors associated with this agreement.
11. Place of Performance.
VA Medical Center Spokane Washington, located at 4815 North Assembly Street, Spokane Washington 99205.
12. Period of Performance.
The Contractor has 10 days for parts gathering and 30 days to perform all described work.
13. Delivery Schedule. NA
A.1 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)
The contracting officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally monitor the work to be performed under this contract. Such designation will be in writing and will define the scope and limitation of the designee's authority. A copy of the designation shall be furnished to the contractor.
(End of Clause)
A.2 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.
(End of Clause)
A.3 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
(a) Any data required to be submitted on a Standard or Optional Form prescribed by the Federal Acquisition Regulation (FAR) may be submitted on a computer generated version of the form, provided there is no change to the name, content, or sequence of the data elements on the form, and provided the form carries the Standard or Optional Form number and edition date.
(b) Unless prohibited by agency regulations, any data required to be submitted on an agency unique form prescribed by an agency supplement to the FAR may be submitted on a computer generated version of the form provided there is no change to the name, content, or sequence of the data elements on the form and provided the form carries the agency form number and edition date.
(c) If the Contractor submits a computer generated version of a form that is different than the required form, then the rights and obligations of the parties will be determined based on the content of the required form.
(End of Clause) A.4 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT FORM) (APR 1984) The Contracting Officer, by written notice, may terminate this contract, in whole or in part, when it is in the Government's interest. If this contract is terminated, the rights, duties, and obligations of the parties, including compensation to the Contractor, shall be in accordance with Part 49 of the Federal Acquisition Regulation in effect on the date of this contract.
(End of Clause)
A.5 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JAN 2019)
(a) Definitions. As used in this clause— Commercial item and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation 2.101, Definitions.
Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017).
(iv) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (June, 2016), other than subcontracts for commercially available off-the-shelf items, if flow down is required in accordance with paragraph (c) of FAR clause 52.204-21.
(v) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115–91).
(vi) 52.219–8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219–8 in lower tier subcontracts that offer subcontracting opportunities.
(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(viii) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
(ix) 52.222-35, Equal Opportunity for Veterans (OCT 2015) (38 U.S.C. 4212(a));
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
(xi) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiii)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xiv) 52.222-55, Minimum Wages under Executive Order 13658 (DEC 2015), if flowdown is required in accordance with paragraph (k) of FAR clause 52.222-55.
(xv) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706), if flow down is required in accordance with paragraph (m) of FAR clause 52.222-62.
(xvi)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) if flow down is required in accordance with 52.224-3(f).
(B) Alternate I (JAN 2017) of 52.224-3, if flow down is required in accordance with 52.224-3(f) and the agency specifies that only its agency-provided training is acceptable.
(xvii) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xviii) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.
(xix) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
(End of Clause)
A.6 52.243-1 CHANGES—FIXED-PRICE (AUG 2018) ALTERNATE I (APR 1984)
(a) The Contracting Officer may at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this contract in any one or more of the following:
(1) Description of services to be performed.
(2) Time of performance (i.e., hours of the day, days of the week, etc.).
(3) Place of performance of the services.
(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, the Contracting Officer shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract.
(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if the Contracting Officer decides that the facts justify it, the Contracting Officer may receive and act upon a proposal submitted before final payment of the contract.
(d) If the Contractor's proposal includes the cost of property made obsolete or excess by the change, the Contracting Officer shall have the right to prescribe the manner of the disposition of the property.
(e) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.
(End of Clause) A.7 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION (APR 1984) The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
(End of Clause)
A.8 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
United States law will apply to resolve any claim of breach of this contract.
(End of Clause)
A.9 52.233-3 PROTEST AFTER AWARD (AUG 1996)
(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Upon receipt of the final decision in the protest, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage; provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(e) The Government's rights to terminate this contract at any time are not affected by action taken under this clause.
(f) If, as the result of the Contractor's intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the Contractor and the Government.
(End of Clause)
A.10 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
(a) Except as stated in paragraph (b) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(1) Any such clause is unenforceable against the Government.
(2) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.
(3) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(b) Paragraph (a) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(End of Clause) A.11 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Method of payment. (1) All payments by the Government under this contract shall be made by electronic funds transfer (EFT), except as provided in paragraph (a)(2) of this clause. As used in this clause, the term "EFT" refers to the funds transfer and may also include the payment information transfer.
(2) In the event the Government is unable to release one or more payments by EFT, the Contractor agrees to either—
(i) Accept payment by check or some other mutually agreeable method of payment; or
(ii) Request the Government to extend the payment due date until such time as the Government can make payment by EFT (but see paragraph (d) of this clause).
(b) Contractor's EFT information. The Government shall make payment to the Contractor using the EFT information contained in the System for Award Management (SAM). In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to SAM.
(c) Mechanisms for EFT payment. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210.
(d) Suspension of payment. If the Contractor's EFT information in SAM is incorrect, then the Government need not make payment to the Contractor under this contract until correct EFT information is entered into SAM; and any invoice or contract financing request shall be deemed not to be a proper invoice for the purpose of prompt payment under this contract. The prompt payment terms of the contract regarding notice of an improper invoice and delays in accrual of interest penalties apply.
(e) Liability for uncompleted or erroneous transfers. (1) If an uncompleted or erroneous transfer occurs because the Government used the Contractor's EFT information incorrectly, the Government remains responsible for—
(i) Making a correct payment;
(ii) Paying any prompt payment penalty due; and
(iii) Recovering any erroneously directed funds.
(2) If an uncompleted or erroneous transfer occurs because the Contractor's EFT information was incorrect, or was revised within 30 days of Government release of the EFT payment transaction instruction to the Federal Reserve System, and—
(i) If the funds are no longer under the control of the payment office, the Government is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or
(ii) If the funds remain under the control of the payment office, the Government shall not make payment, and the provisions of paragraph (d) of this clause shall apply.
(f) EFT and prompt payment. A payment shall be deemed to have been made in a timely manner in accordance with the prompt payment terms of this contract if, in the EFT payment transaction instruction released to the Federal Reserve System, the date specified for settlement of the payment is on or before the prompt payment due date, provided the specified payment date is a valid date under the rules of the Federal Reserve System.
(g) EFT and assignment of claims. If the Contractor assigns the proceeds of this contract as provided for in the assignment of claims terms of this contract, the Contractor shall require as a condition of any such assignment, that the assignee shall register separately in SAM and shall be paid by EFT in accordance with the terms of this clause. Notwithstanding any other requirement of this contract, payment to an ultimate recipient other than the Contractor, or a financial institution properly recognized under an assignment of claims pursuant to subpart 32.8, is not permitted. In all respects, the requirements of this clause shall apply to the assignee as if it were the Contractor. EFT information that shows the ultimate recipient of the transfer to be other than the Contractor, in the absence of a proper assignment of claims acceptable to the Government, is incorrect EFT information within the meaning of paragraph (d) of this clause.
(h) Liability for change of EFT information by financial agent. The Government is not liable for errors resulting from changes to EFT information made by the Contractor's financial agent.
(i) Payment information. The payment or disbursing office shall forward to the Contractor available payment information that is suitable for transmission as of the date of release of the EFT instruction to the Federal Reserve System. The Government may request the Contractor to designate a desired format and method(s) for delivery of payment information from a list of formats and methods the payment office is capable of executing. However, the Government does not guarantee that any particular format or method of delivery is available at any particular payment office and retains the latitude to use the format and delivery method most convenient to the Government. If the Government makes payment by check in accordance with paragraph (a) of this clause, the Government shall mail the payment information to the remittance address contained in SAM.
(End of Clause)
A.12 52.232-25 PROMPT PAYMENT (JAN 2017)
Notwithstanding any other payment clause in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer (EFT). Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(4) of this clause concerning payments due on Saturdays, Sundays, and legal holidays.)
(a) Invoice payments—
(1) Due date.
(i) Except as indicated in paragraphs (a)(2) and (c) of this clause, the due date for making invoice payments by the designated payment office is the later of the following two events:
(A) The 30th day after the designated billing office receives a proper invoice from the Contractor (except as provided in paragraph (a)(1)(ii) of this clause).
(B) The 30th day after Government acceptance of supplies delivered or services performed. For a final invoice, when the payment amount is subject to contract settlement actions, acceptance is deemed to occur on the effective date of the contract settlement.
(ii) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(2) Certain food products and other payments.
(i) Due dates on Contractor invoices for meat, meat food products, or fish; perishable agricultural commodities; and dairy products, edible fats or oils, and food products prepared from edible fats or oils are—
(A) For meat or meat food products, as defined in section 2(a)(3) of the Packers and Stockyard Act of 1921 (7 U.S.C. 182(3)), and as further defined in Pub. L. 98-181, including any edible fresh or frozen poultry meat, any perishable poultry meat food product, fresh eggs, and any perishable egg product, as close as possible to, but not later than, the 7th day after product delivery.
(B) For fresh or frozen fish, as defined in section 204(3) of the Fish and Seafood Promotion Act of 1986 (16 U.S.C. 4003(3)), as close as possible to, but not later than, the 7th day after product delivery.
(C) For perishable agricultural commodities, as defined in section 1(4) of the Perishable Agricultural Commodities Act of 1930 (7 U.S.C. 499a(4)), as close as possible to, but not later than, the 10th day after product delivery, unless another date is specified in the contract.
(D) For dairy products, as defined in section 111(e) of the Dairy Production Stabilization Act of 1983 (7 U.S.C. 4502(e)), edible fats or oils, and food products prepared from edible fats or oils, as close as possible to, but not later than, the 10th day after the date on which a proper invoice has been received. Liquid milk, cheese, certain processed cheese products, butter, yogurt, ice cream, mayonnaise, salad dressings, and other similar products, fall within this classification. Nothing in the Act limits this classification to refrigerated products. When questions arise regarding the proper classification of a specific product, prevailing industry practices will be followed in specifying a contract payment due date. The burden of proof that a classification of a specific product is, in fact, prevailing industry practice is upon the Contractor making the representation.
(ii) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the due date will be as specified in the contract.
(3) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(3)(i) through (a)(3)(x) of this clause. If the invoice does not comply with these requirements, the designated billing office will return it within 7 days after receipt (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, dairy products, edible fats or oils, and food products prepared from edible fats or oils), with the reasons why it is not a proper invoice. The Government will take into account untimely notification when computing any interest penalty owed the Contractor.
(i) Name and address of the Contractor.
(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of the mailing or transmission.)
(iii) Contract number or other authorization for supplies delivered or services performed (including order number and line item number).
(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed.
(v) Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.
(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).
(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.
(viii) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(ix) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232- 38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(x) Any other information or documentation required by the contract (e.g., evidence of shipment).
(4) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(4)(i) through (a)(4)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.
(i) The designated billing office received a proper invoice.
(ii) The Government processed a receiving report or other Government documentation authorizing payment, and there was no disagreement over quantity, quality, or Contractor compliance with any contract term or condition.
(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The prompt payment regulations at 5 CFR 1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.
(6) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5 CFR part 1315.
(7) Additional interest penalty.
(i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at 5 CFR part 1315 in addition to the interest penalty amount only if—
(A) The Government owes an interest penalty of $1 or more;
(B) The designated payment office does not pay the interest penalty within 10 days after the date the invoice amount is paid; and
(C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph (a)(7)(ii) of this clause, postmarked not later than 40 days after the invoice amount is paid.
(ii)(A) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not request any additional data. The Contractor shall—
(1) Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment interest penalty and such additional penalty as may be required;
(2) Attach a copy of the invoice on which the unpaid late payment interest is due; and
(3) State that payment of the principal has been received, including the date of receipt.
(B) If there is no postmark or the postmark is illegible—
(1) The designated payment office that receives the demand will annotate it with the date of receipt, provided the demand is received on or before the 40th day after payment was made; or
(2) If the designated payment office fails to make the required annotation, the Government will determine the demand's validity based on the date the Contractor has placed on the demand, provided such date is no later than the 40th day after payment was made.
(iii) The additional penalty does not apply to payments regulated by other Government regulations (e.g., payments under utility contracts subject to tariffs and regulation).
(b) Contract financing payment. If this contract provides for contract financing, the Government will make contract financing payments in accordance with the applicable contract financing clause.
(c) Fast payment procedure due dates. If this contract contains the clause at 52.213-1, Fast Payment Procedure, payments will be made within 15 days after the date of receipt of the invoice.
(d) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(1) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(i) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(ii) Affected contract number and delivery order number if applicable;
(iii) Affected line item or subline item, if applicable; and
(iv) Contractor point of contact.
(2) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(End of Clause)
A.13 52.232-11 EXTRAS (APR 1984)
Except as otherwise provided in this contract, no payment for extras shall be made unless such extras and the price therefor have been authorized in writing by the Contracting Officer.
(End of Clause)
A.14 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(a) The Contractor, under the Assignment of Claims Act, as amended, 31 U.S.C. 3727, 41 U.S.C. 6305 (hereafter referred to as "the Act"), may assign its rights to be paid amounts due or to become due as a result of the performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency. The assignee under such an assignment may thereafter further assign or reassign its right under the original assignment to any type of financing institution described in the preceding sentence.
(b) Any assignment or reassignment authorized under the Act and this clause shall cover all unpaid amounts payable under this contract, and shall not be made to more than one party, except that an assignment or reassignment may be made to one party as agent or trustee for two or more parties participating in the financing of this contract.
(c) The Contractor shall not furnish or disclose to any assignee under this contract any classified document (including this contract) or information related to work under this contract until the Contracting Officer authorizes such action in writing.
(End of Clause)
A.15 52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(a) Discounts for prompt payment will not be considered in the evaluation of offers. However, any offered discount will form a part of the award, and will be taken if payment is made within the discount period indicated in the offer by the offeror. As an alternative to offering a discount for prompt payment in conjunction with the offer, offerors awarded contracts may include discounts for prompt payment on individual invoices.
(b) In connection with any discount offered for prompt payment, time shall be computed from the date of the invoice. If the Contractor has not placed a date on the invoice, the due date shall be calculated from the date the designated billing office receives a proper invoice, provided the agency annotates such invoice with the date of receipt at the time of receipt. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or, for an electronic funds transfer, the specified payment date. When the discount date falls on a Saturday, Sunday, or legal holiday when Federal Government offices are closed and Government business is not expected to be conducted, payment may be made on the following business day.
(End of Clause)
A.16 52.232-1 PAYMENTS (APR 1984)
The Government shall pay the Contractor, upon the submission of proper invoices or vouchers, the prices stipulated in this contract for supplies delivered and accepted or services rendered and accepted, less any deductions provided in this contract. Unless otherwise specified in this contract, payment shall be made on partial deliveries accepted by the Government if:
(a) The amount due on the deliveries warrants it; or
(b) The Contractor requests it and the amount due on the deliveries is at least $1,000 or 50 percent of the total contract price.
(End of Clause)
A.17 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
(a) Except as authorized by the Office of Foreign Assets Control (OFAC) in the Department of the Treasury, the Contractor shall not acquire, for use in the performance of this contract, any supplies or services if any proclamation, Executive order, or statute administered by OFAC, or if OFAC's implementing regulations at 31 CFR chapter V, would prohibit such a transaction by a person subject to the jurisdiction of the United States.
(b) Except as authorized by OFAC, most transactions involving Cuba, Iran, and Sudan are prohibited, as are most imports from Burma or North Korea, into the United States or its outlying areas. Lists of entities and individuals subject to economic sanctions are included in OFAC's List of Specially Designated Nationals and Blocked Persons at http://www.treas.gov/offices/enforcement/ofac/sdn. More information about these restrictions, as well as updates, is available in the OFAC's regulations at 31 CFR chapter V and/or on OFAC's Web site at http://www.treas.gov/offices/enforcement/ofac.
(c) The Contractor shall insert this clause, including this paragraph (c), in all subcontracts.
(End of Clause) A.18 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
(a) Definitions. As used in this clause— "Driving"—
(1) Means operating a motor vehicle on an active roadway with the motor running, including while temporarily stationary because of traffic, a traffic light, stop sign, or otherwise.
(2) Does not include operating a motor vehicle with or without the motor running when one has pulled over to the side of, or off, an active roadway and has halted in a location where one can safely remain stationary.
"Text messaging" means reading from or entering data into any handheld or other electronic device, including for the purpose of short message service texting, e-mailing, instant messaging, obtaining navigational information, or engaging in any other form of electronic data retrieval or electronic data communication.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.