36C25927Q0048 0002.pdf
PDF 279 KB Posted
- Attached to
- Radiant Heating Panel Replacement
- Solicitation number
- 36C25927Q0048
About this file
This document is Amendment 0002 to Request for Quotation (RFQ) 36C25927Q0048 for FMS Radiant Panel Replacement at Rocky Mountain Regional Veterans Affairs Medical Center (VAMC) in Aurora, Colorado.
The contracting office is the Department of Veterans Affairs Network Contracting Office NCO 19 in Greenwood Village, Colorado. The revised quotation due date is November 27, 2026, at 12:00 PM Mountain Time. The solicitation is a small business set-aside. The work involves replacing failed radiant heating panels at five locations: North Entrance (730 inches), South Entrance (560 inches), Colfax Entrance (220 inches), Chapel (1,256 inches), and Cross Bridge North (88 inches), totaling approximately 277 linear feet. Replacement panels must be Vulcan Model PR2F radiant panels or approved equals meeting specified technical requirements: low-pressure construction rated at 56 PSIG working pressure (74 PSIG factory test pressure), ½-inch NPT female connections with 1/8-inch NPT air vent connections, mounting brackets for noise-free operation, and maximum thermal expansion of 0.016 inch per linear foot at 215°F. The project scope includes removing and disposing of failed panels and project debris, with performance to be completed within 90 days of award. Work is scheduled Monday through Friday, 7:30 AM to 4:00 PM, with contractor coordination required two weeks in advance for any disruptions to medical center operations. Contractors must check in and out with the Facilities Management Services point of contact in Building L (ENC). Post-installation leak testing must be performed at no more than 50 PSI for 30 minutes with no visible leaks or perceptible pressure drops. The amendment addresses 24 clarifying questions and answers regarding existing equipment specifications, phasing and access, panel disposal, period of performance, locations, pressure ratings, brand acceptance, scope boundaries, subcontracting limitations, working versus test pressures, tube heights, manufacturer details, expansion allowances, panel divisions, mounting types, hydronic system support, fluid specifications, infection control requirements, badging and escort procedures, waste characterization, invoicing terms, and grille requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25927Q0048 0001.docx | DOCX document | |
| VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction.docx | DOCX document | |
| 36C25927Q0048 - Description.docx | DOCX document | |
| WD - 2015-5419 Adams-Arapahoe-Denver.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
*= Required Field Amendment to a Previous Combined Solicitation
SUBJECT* FMS Radiant Panel Replacement RMR VAMC
GENERAL INFORMATION
CONTRACTING OFFICE’S ZIP CODE* 80111
SOLICITATION NUMBER* 36C25927Q0048
RESPONSE DATE/TIME/ZONE 11-27-2026 12pm MOUNTAIN TIME, DENVER, USA
ARCHIVE 30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS N
SET-ASIDE SBA
PRODUCT SERVICE CODE* J045
NAICS CODE* 238220
CONTRACTING OFFICE ADDRESS Department of Veterans Affairs
Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
POINT OF CONTACT*
Contracting Officer Chris Hollingsworth Christopher.Hollingsworth2@va.gov (303)712-5724
PLACE OF PERFORMANCE
ADDRESS Department of Veterans Affairs Rocky Mountain Regional VAMC
1700 N. Wheeling St Aurora CO
POSTAL CODE 80045
COUNTRY USA
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS Christopher.Hollingsworth2@va.gov EMAIL DESCRIPTION Contracting Officer
DESCRIPTION
THE PURPOSE OF THIS AMENDMENT 0002 TO RFQ 36C25927Q0038 IS TO EXTEND THE
QUOTATION DUE DATE, AND TO POST QUESTIONS AND ANSWERS THAT WERE
RECEIVED.
This amendment is issued to provide answers to questions that were received as a result of this solicitation. Questions and Answers are below.
To allow vendors sufficient time to review the additional information, the quotation due date is hereby extended from November 26, 2026, to November 27, 2026, at 12:00 PM (Mountain Time). All quotations must be received no later than this deadline. All other terms and conditions of the solicitation remain unchanged.
Q. Existing panels. The PWS calls for new panels at the same length and pressure as the existing panels, and like heating panels. Please identify the existing panels (manufacturer, model, dimensions, and pressure/output rating) or advise where that information is available — drawings, a panel schedule, or the site visit below.
A. Site Specific Equipment Information:
• Model: PRF
• Radiators to be rate for low, medium and high pressure for a working pressure of 74
PSIG
• Radiators should be supplied with all mounting backets for noise free operation
• Radiators to be supplied with standard ½” female tapered NPT female connections and
1/8” female tapered NPT air vent connections
• Radiator expansion not to exceed 0.016 inches at 215°F for Piping allowance for expansion and contraction
Q. Phasing and access. Is the work performed in a single mobilization, or phased across the Colfax, South, and North entrances and the employee breezeway? Please also advise any work-hour, escort, or infection-control requirements at the medical center that the contractor should price.
A. No establish a single-mobilization requirement or a mandatory sequence among locations. It requires work Monday through Friday, 7:30 a.m.–4:00 p.m., and scheduling that permits continuous facility operations to the greatest extent possible. Potential disruptions to ongoing medical center operations require coordination two weeks in advance and CO/POC approval;
the PWS separately requires at least one week’s advance scheduling for other building disruptions. Personnel must check in and out with the POC in Building L (ENC). Specific escort, infection-control, and entrance-closure requirements require VA confirmation.
Q. Disposal. The PWS requires removal and disposal of the failed panels. Please confirm whether the existing panels or any associated materials carry a regulated disposal requirement.
A. The contractor must remove and dispose of failed panels and remove project debris. The attachments do not provide a hazardous-material survey or identify regulated disposal requirements; therefore, nonregulated disposal cannot be affirmatively confirmed from the supplied information
Q. Period of performance: The solicitation doesn't appear to state a required start or completion date. Could you confirm the expected completion timeframe after award?
A. Period of performance is completed within 90 days of award, it would be up to contracting to extend if required for production of the panels.
Q. Locations: The PWS background lists the Colfax, South and North entrances and the employee breezeway from the employee garage, while the photos show Cross Bridge North (88"), Chapel (1,256"), North Entrance (730"), South Entrance (560") and Colfax Entrance (220"), totaling approximately 238 ft. Could you confirm that these five locations and lengths are the complete scope, and whether the employee breezeway is a separate area or is the Cross Bridge North?
A. 105 LF of two-row panels plus 172 LF of three-row panels, totaling 277 LF
Q. Pressure rating: The PWS states a working pressure of 74 PSIG for model PRF. In the manufacturer literature we reviewed for the PRF panel, 74 PSI appears as the test pressure for the standard low-pressure rating (56 PSI max working), with a high-pressure option rated higher. Could you confirm which pressure rating the replacement panels must carry?
A. Working pressure of 56 PSIG however tolerance values for pressure fluctuation must be considered. The attached original equipment submittal literature distinguishes working pressure from factory test pressure as follows upon activation of the facility
Construction Working pressure
Factory test pressure
Minimum tube-wall thickness
Low 56 PSIG 74 PSIG 0.048 inch
Medium 85 PSIG 110 PSIG 0.058 inch
Q. Brand: Is the PRF model (or an exact match) required, or will equal panels meeting the stated dimensions, connections and pressure rating be accepted?
A. Original equipment from activation manufacturer is “Vulcan equipment” model: PRF, Substitute equipment will be permitted pending technical submission for acceptance
Q. Scope boundaries: Are system drain-down/refill, any isolation valve replacement, and replacement of floor grilles or enclosures included in the scope, or limited to the panels and their connections?
A. VA will perform the hydronic support work or that all existing valves and enclosures must be replaced.
Q. Limitations on subcontracting: The attached VAAR 852.219-75 certificate references SDVOSB/VOSB firms, while the solicitation is a total small business set-aside. Could you confirm that the 50% services limitation applies with respect to similarly situated small business concerns for this acquisition?
A. This is a small business set-aside and the LOS does not apply. The attached VAAR 852.219-75 is not required to be submitted.
Q. Official length / location schedule (PWS Paragraph Paragraph 1 and 3 vs. photo captions)
PWS Background names Colfax, South, and North entrances plus the employee breezeway (~238 LF total). The photo captions in the Description attachment give:
- Cross Bridge North — 88", 4 panels, 3 flow compartments
- North Entrance — 730", multiple divisions, 2 flow compartments
- Chapel ("Chappel") — 1,256", multiple divisions, 2 flow compartments
- South Entrance — 560", multiple divisions, 2 flow compartments
- Colfax Entrance — 220", 4 panels, 3 flow compartments
Those lengths sum to 2,854" ≈ 237.8 LF, which matches the ~238' figure.
Please confirm: (a) the caption lengths and flow-compartment counts are the official schedule;
(b) whether "Cross Bridge North" is the employee breezeway named in Paragraph 1; and (c) whether the Chapel run is in scope. Chapel appears in the photos but is not listed in PWS Background. Our interpretation is that all five captioned runs are in scope and that Cross Bridge North = the employee breezeway, unless you advise otherwise.
A.
Location Reported run length Reported divisions
Reported flow compartments
Cross Bridge North 88 inches 4 panels 3
North Entrance 730 inches Multiple divisions 2
Chapel 1,256 inches Multiple divisions 2
South Entrance 560 inches Multiple divisions 2
Colfax Entrance 220 inches 4 panels 3
Total 2,854 inches / approximately
237.8 LF — —
Q. Working pressure vs. test pressure / LOW vs. HIGH construction (PWS Paragraph 4)
PWS Paragraph 4 states radiators shall be rated “for a working pressure of 74 PSIG” and mentions “low, medium and high pressure.” Published Sterling Model PRF data matching the stated ½" NPT / ⅛" vent / expansion language lists only two constructions: LOW = 56 PSIG working / 74 PSIG test, and HIGH = 128 PSIG working / 184 PSIG test. There is no “medium,” and 74 PSIG is the LOW factory test pressure, not the LOW working pressure.
Our interpretation: VA intends the LOW construction unless the building loop actually operates near 74 PSIG. Please confirm required working pressure, required test pressure, and whether LOW or HIGH construction is mandatory.
A. Working pressure of 56 PSIG however tolerance values for pressure fluctuation must be considered. The attached original equipment submittal literature distinguishes working pressure from factory test pressure as follows upon activation of the facility
Construction Working pressure
Factory test pressure
Minimum tube-wall thickness
Low 56 PSIG 74 PSIG 0.048 inch
Medium 85 PSIG 110 PSIG 0.058 inch
Q. Tube height / “flow compartments” (photo overlays)
Photo labels call out “2 flow compartments” (North, South, Chapel) and “3 flow compartments” (Colfax, Cross Bridge North).
A. Correct per original design
Our interpretation: these equal Sterling PRF-02 (2-tube) and PRF-03 (3-tube) respectively.
Please confirm tube count (or PRF 01–10 height) per location, or provide a nameplate photo / existing submittal.
A.
divisions
Reported flow compartments
Cross Bridge North 88 inches 4 panels 3
North Entrance 730 inches Multiple divisions 2
Chapel 1,256 inches Multiple divisions 2
South Entrance 560 inches Multiple divisions 2 divisions
Reported flow compartments
Colfax Entrance 220 inches 4 panels 3
Total 2,854 inches / approximately
237.8 LF — —
4. Manufacturer / equal product, product family, and finish (PWS Paragraph 4 “Model: PRF”)
Paragraph 4 specifies only “Model: PRF,” 74 PSIG working pressure, ½" FIPT NPT connections, ⅛" FIPT air vents, mounting brackets, and expansion ≤ 0.016" at 215°F. The photos show two different installed products: corrugated ceiling radiant panels (Colfax; Cross Bridge North) and floor-level baseboard / fin-tube enclosures (South Entrance; Chapel). Photos also show white floor-perimeter panels and bronze/champagne overhead panels.
Our interpretation: (a) “PRF” means the Sterling (Mestek) / Zehnder-Rittling PRF family, like-for-like; (b) like-for-like means matching the existing product family at each location (ceiling vs floor), not substituting one for the other; (c) closest standard white and closest standard bronze are acceptable unless a custom RAL/Sterling code is specified. Please confirm whether Sterling/Rittling PRF is brand-name required or equals meeting the Paragraph 4 criteria are acceptable; if equals are allowed, what capacity basis (BTUH/LF at what EWT/EAT) must be matched; and the required color codes.
A. like-for-like means matching the existing product family at each location (ceiling vs floor), not substituting one for the other due to color and capacity (flow tube count);
Q. Expansion language (PWS Paragraph 4)
PWS: “Radiator expansion not to exceed 0.016 inches at 215°F.” Published Sterling PRF data states 1/64" (≈0.0156") per foot at 215°F per-linear-foot allowance, rather than a total allowance for an entire run.
Our interpretation: VA means ≤1/64" per foot. Please confirm.
A. Radiators expand a maximum of 0.016 inch per linear foot when heated to 215°F; Per-linear-foot allowance, rather than a total allowance for an entire run. requires connected piping to accommodate expansion.
Q. Individual panel lengths / divisions
Overhead runs state “divided into 4 panels.” Floor runs state “multiple divisions” without cut lengths. Sterling allows factory lengths of 2'–20' in 2" increments.
Please provide preferred factory cut lengths per run, or authorize the contractor to match existing division lengths in the field.
A. Due to floor penetrations for existing supply and return hydronic flow VA/FMS authorizes field verification and matching of existing divisions
Q. Mounting type (PWS Paragraph 4)
Photos show floor/pedestal perimeter at entrances and overhead/ceiling at Colfax and Cross Bridge. PWS Paragraph 4 requires supply of mounting brackets for noise-free operation.
Please confirm mount type per location (wall bracket vs pedestal vs ceiling hangers) and whether existing brackets may be reused or must be new.
A. Brackets can be reused as long as they are compatible to proposed material or if the same is proposed.
Q. Isolation, draindown, refill, and piping beyond the panel connections (PWS Paragraph 3)
Paragraph 3 requires us to “Prep existing locations to ensure no failure points that may leak,” install at existing connection points, verify pressure, and leak-check new joints. It does not assign isolation, system draindown, refill, air elimination, or water treatment, and does not state whether existing isolation valves must be renewed.
Our interpretation: VA FMS isolates and drains the affected hydronic branch(es) and restores system fill/chemistry; the contractor disconnects and reconnects at the panel ½" NPT connections and is responsible for the integrity of new panel joints and furnished vents; existing isolation valves are reused if operable, and valves / flex connectors / piping beyond the panel connections are replaced only if found failed during prep. Please confirm, or state the contractor’s boundary.
A. VA FMS will isolate, refill, and restore system chemistry. Draining can only be achieved during removal of panel, once new panel is installed VA FMS will restore operation to identify and label compromised locations. The restoration of operations can be done while contractor is on site for relevancy.
Q. Hydronic fluid
Please state whether the loops contain water or glycol (type and %), who furnishes refill fluid, and any fill-water treatment specification.
A. Hydronic water loop, not glycol. Chemistry to be managed in-house by VA FMS.
A. Pressure / leak-test criteria after install (PWS Paragraph Paragraph 3–4)
Working pressure is stated as 74 PSIG. No hydrostatic or leak-test pressure, medium, or hold time is stated, and the normal operating pressure of these entrance loops is not given.
Our interpretation: after refill, perform a leak test of the new panels and connections at the confirmed working/test pressure for a hold time directed by the FMS POC, with results recorded in the Paragraph 6 Word report. Please confirm the required test pressure, medium, and hold time, and the normal operating pressure at these loops.
A. Standard-pressure radiators should be tested at no more than 50 PSI for a hot-water heating radiator installation, 30 minutes at the specified test pressure, with no visible leaks or perceptible pressure drop once the pressure has stabilized.
Q. Ceiling access, lighting, and working height (Colfax / Cross Bridge North photos)
The Colfax and Cross Bridge North photos show radiant panels set in a structural ceiling grid with linear light fixtures suspended below the panels.
Please confirm whether the contractor must remove, store, and reinstall those light fixtures (and any devices attached to the panels), what the approximate working height is, and whether VA will provide clear floor space for a lift during the approved work window. Our interpretation is that fixture removal/reinstall needed to access the panels is contractor scope, with lift equipment furnished by the contractor, subject to POC coordination under Paragraph 8.
A. Light Fixture connections do not penetrate beam, a light cover of plastic will be sufficient to prevent contact with fluids.
Q. Infection control / ICRA and public-entrance phasing (PWS Paragraph 8)
No ICRA class, barrier standard, or dust-control specification appears in the PWS. Work is at public entrances (and, if confirmed, the Chapel) during Mon–Fri 7:30 AM–4:00 PM, with disruptions coordinated 2 weeks ahead. Hours themselves are understood.
Please state: (a) the required ICRA level (if any) and who furnishes barriers/negative air; (b) the maximum number of entrance zones that may be down concurrently; (c) any mandatory phasing order; and (d) whether temporary heat is required while a run is drained. Our interpretation is standard construction dust control and pedestrian protection at each entrance, one location at a time, with temporary heat only if directed by the CO/POC for occupied conditions.
A. Provide barriers to separate each work area from pedestrian traffic and maintain pedestrian protection at each entrance. All panels shall be factory-painted to minimize on-site work and dust generation. Any activities expected to generate more than minimal dust shall be coordinated with the VA FMS POC before proceeding. Work in the chapel must be coordinated a week in advance.
Q. Badging / escorts (FAR 52.204-9; PWS Paragraph 8 Contractor Check-In)
PWS requires check-in/out with the POC in Building L (ENC), with access provided by the POC.
FAR 52.204-9 is incorporated.
Please state the badging lead time, and whether a government escort is provided continuously or only for initial access.
A. The work locations are open to the public; therefore, contractor badging is not required, and no badging lead time applies. The contractor shall sign in and out with the POC in Building L (ENC). A continuous government escort is not required for work in public areas; an escort will be provided as needed to access material storage areas, subject to availability. The VA FMS POC will serve as the primary contact for access and coordination.
Q. Disposal / waste characterization (PWS Paragraph Paragraph 3 and 7)
The PWS requires remove-and-dispose and debris removal, with no waste characterization or hazmat note.
Our interpretation: removed panels and debris are ordinary construction waste disposed off-site by the contractor, unless VA identifies suspected asbestos, lead, or other regulated material requiring testing before disturbance. Please confirm.
A. No regulated material, no testing required.
Q. Equipment specifications: Please provide the existing manufacturer and complete panel schedule, including model variants, quantities, dimensions, heat-output requirements, finish, and connection locations. Please also clarify the stated expansion limit of 0.016 inches at 215°F.
A.
Item Information provided in the attachment
Manufacturer Vulcan, 260 North Elm Street, Westfield, MA 01085; telephone (413) 564- 5535; www.vulcanrad.com.
Model and variants
Model PR2F: one-piece, all-welded steel double-panel radiator with corrugated steel fins welded to the inside of each panel. Specific model sizes/variants are not scheduled.
Item Information provided in the attachment
Quantities Not provided; quantities must be established from the project drawings or field verification.
Dimensions Available lengths are 2′-0″ through 16′-0″ in 2-inch increments without splicing. Selected lengths, heights, and depths are not provided.
Heat-output requirements
Required heating capacities and model-specific output ratings are not included in this attachment. Project-specific required Btu/h and selected radiator capacities at the design operating conditions remain to be provided.
Finish
Gloss powder-coat finish over cleaned and phosphatized steel, with total paint thickness of 2–3 mils (0.002–0.003 inch). Color is selected from the manufacturer’s standard chart; custom colors are optional. The selected project color is not identified.
Connections
Standard supply and return connections are ½-inch NPT tapered thread;
the vent connection is ⅛ inch. Optional ¾-inch NPT connections are available under Option 29. Exact supply, return, and vent locations for each panel are not provided.
Mounting Wall-mounting brackets are included. Optional floor-mounted pedestal brackets are available for panels up to four tubes high.
Q. Please confirm responsibility for system isolation, draining, refilling, air removal, water treatment, and repairs to existing piping, valves, or surrounding finishes.
A. Due to the failed existing radiators all have been isolated, there may be residual fluid inside, contractor will work with VA FMS HVAC mechanic to refill the system when installed per area, the hydronic loop has air breakers that will compensate as it filled and back in service.
Q. Invoicing: May the contractor invoice after acceptance of each completed entrance, or only after completion and acceptance of the entire project?
A. Billing can be submitted per entrance once it is installed and tested, an email with billing details needs to be submitted to FMS VA POC prior to uploading to tungsten for concurrence.
Q. Option language: The attached description references a potential six-month extension, while the pricing schedule includes one job for a one-time replacement. Please confirm whether that extension language applies.
A. This is for a one time replacement. Option Language does not apply.
Q. Entrances: the work is described as at "all the entrances," with specific entrances shown only in pictures. Please provide a list of the entrances/rooms included, or confirm whether a site visit can be arranged.
A. Locations of work: North Entrance, South Entrance, Colfax entrance, and Chapel
Q. Model PRF panels: please confirm the manufacturer of the Model PRF panels specified, and whether an approved equal may be offered, and if so, what documentation is required.
A.
Manufacturer Vulcan, 260 North Elm Street, Westfield, MA 01085; telephone (413) 564- 5535; www.vulcanrad.com.
Model and variants
Model PR2F: one-piece, all-welded steel double-panel radiator with corrugated steel fins welded to the inside of each panel. Specific model sizes/variants are not scheduled.
Q. Are the existing stainless-steel covers/grilles to remain in place and be reused after installation of the new radiant heating panels?
A. There are no grilles on the radiant panels
Q. If replacement of the covers/grilles is required, please provide the applicable material specifications, finish requirements, and dimensions.
A. No Grilles required
Q. If the existing covers/grilles are to be reused, is the contractor required to include cleaning, repair, refinishing, repainting, or other restoration of the existing covers/grilles?
A. No Grilles required