About this file

This is a Presolicitation Notice for the Department of Veterans Affairs announcing a planned Request for Proposal for replacement of furniture, fixtures, and equipment at the Salt Lake City VA Medical Center's Inpatient Psychiatric Unit (IPU). The solicitation number is 36C25926R0053, with a response date of March 6, 2026 at 10:00 AM Mountain Time, though the actual RFP is estimated to be posted on or about March 9, 2026. The contracting office is located in Greenwood Village, Colorado (80111), and the point of contact is Contract Specialist Blake Rowland at blake.rowland@va.gov. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC).

The project encompasses comprehensive renovations to the IPU including replacement of 1,090 square feet of acoustical ceiling tile with framed 5/8" gypsum drywall ceiling and 2,565 square feet with tamper-resistant ceiling panels (minimum CAC value of 35, NRC value of 0.85). The scope also includes replacing 18 patient-use ligature-resistant stainless-steel toilets and sinks for in-wall mounting, 27 inward-opening 20-minute rated barrier-resistant interior wood doors with anti-ligature hardware, wicket doors with laminated glass view panels and integral blinds, anti-ligature locksets, and access doors above ceilings. The performance period is 180 calendar days from Notice to Proceed, with work conducted Monday through Friday during normal business hours (7:00 AM to 5:00 PM), excluding federal holidays. The Product Service Code is Z2DA (Construction) and the NAICS Code is 236220, with performance taking place at the Salt Lake City VA Medical Center, 500 Foothill Drive, Salt Lake City, UT 84148.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presolicitation Notice Presolicitation Notice

SUBJECT*
660-26-220 - Replace Furniture, Fixtures & Equipment for IPU for VAMC in Salt Lake City, UT

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
80111
SOLICITATION NUMBER*
36C25926R0053
RESPONSE DATE/TIME/ZONE
03-06-2026 10:00 AM MOUNTAIN TIME, DENVER, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Z2DA
NAICS CODE*
236220
PLACE OF PERFORMANCE
Department of Veterans Affairs

VA Medical Center

Salt Lake City

500 Foothill Drive

Sat Lake City UT

POSTAL CODE
84148
COUNTRY
USA

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

POINT OF CONTACT*

Contract Specialist Blake Rowland blake.rowland@va.gov

ADDITIONAL INFORMATION

AGENCY’S URL
https://www.va.gov
URL DESCRIPTION
Department of Veterans Affairs
AGENCY CONTACT’S EMAIL ADDRESS
blake.rowland@va.gov
EMAIL DESCRIPTION
Department of Veterans Affairs CS

DESCRIPTION

THIS IS A PRESOLICIATION NOTICE – A REQUEST FOR PROPOSAL WILL BE POSTED ON OR ABOUT MARCH 9, 2026 (i.e., estimated)

Salt Lake City VA Medical Center

(SLC VAMC)

Statement of Work

REPLACE FURNITURE, FIXTURES & EQUIPMENT (FF&E)

Project Number: 660-26-220 Project Title: Replace Furniture, Fixtures & Equipment (FF&E) IPU

1. General Objectives and Requirements

Number and Title of project: 660-26-220 Replace Furniture, Fixtures & Equipment (FF&E) IPU.

Authority for the project: Veterans Affairs (VA); National Contracting Office (NCO) 19.

Purpose of the project: To replace all sinks, toilets, and locksets in all IPU patient rooms, to replace the grid ceiling in all patient areas, including the hallways, community rooms including the sunroom, where patients have physical access, as well as the sally port areas, with either a hard gypsum ceiling with access panels or a mental health grade ceiling panel system, see attached floor plan for locations of each of ceiling type. The door to the laundry area needs to be replaced with a door with built in wicket door (it’s possible we may allow a new door to be installed to open outward, for the laundry room, but this must be approved by the COR) to eliminate barricade risk. All patient room and patient bathroom doors with hardware to receive new anti-ligature hardware and anti-ligature strike/latch assemblies. Must provide adequate number of sizes of anti-ligature access doors to all areas above the ceiling requiring any maintenance access. Please estimate to provide around 1 access door for every 100SF of solid ceiling installed, although final locations will need to be determined once ceiling is open and access doors can be scheduled.

Background: It was determined, through The Joint Commission (TJC) Environment of Care (EOC) and Office of Inspector General (OIG) survey, that several aspects of the IPU are degraded beyond repair.

Scope and methodology: To replace the entire grid ceiling with a gypsum ceiling, mental health grade panels and tamper-resistant access panels, all patient-use fixtures, and all patient room doors and hardware. The project shall consist of 6 distinct construction phases. This was decided after stakeholders input to maintain access to the isolation room and emergency egress.

The C&A requirements do not apply, and a Security Accreditation Package is not required.

2. Tasks and Associated Deliverables

Description of tasks and associated deliverables: Construction tasks and deliverables shall be in accordance with this statement of work (SOW), construction specifications, and drawings.

Complete the following tasks:

· To replace 1,090 SF of existing acoustical ceiling tile (ACT) ceiling system with a framed 5/8” gypsum drywall ceiling system, with access panels:

· Access panels must be installed and sized appropriately where maintenance access is required (junction boxes, etc.)

· All access panels must be tamper proof and accessible with a specialized key.

· Wall repair shall be a level IV finish, where disturbed, to fully match existing material and finish.

· To replace 2,565 SF of existing ACT ceiling system with a tamper-resistant ceiling panel system capable of a minimum sound blocking (CAC) value of 35 and sound absorption (NRC) value of 0.85. Panels shall be mechanically fastened with tamper resistant fasteners or installed with tamper resistant clips to the ceiling grid. Panels shall be accessible with a special tool and must not be openable by hand for patient safety. Panels must be sized appropriately for maintenance access (30” x 30”). Implement manufacturers required suspension system, and HVAC diffusers and grilles. Install ceiling panel system in manner that meets manufacturer requirements. Panel color shall be approved by VA prior to ordering.

· To replace 18 patient-use toilets with Ligature Resistant ADA Compliant Stainless-Steel Toilet for In-Wall Mounting, with powder-coated finish on the exterior of the fixture only. No paint or power-coating or any other finish on the interior basin of the fixture. Automatic flush valves are preferred. If automatic valves are not available, please supply the COR with shop drawings for a mechanical flushing toilet.

· To replace 18 patient-use sinks with Ligature Resistant ADA Compliant Stainless-Steel Sink for in-wall mounting, with powder-coated finish on the exterior of the fixture only. No paint or power-coating or any other finish on the interior basin of the fixture.

· To replace 27 (no longer replacing the isolation room door) patient room doors with inward-opening, 20-minute rated Barrier-Resistant Interior Wood Doors. The doors shall include:

· Outward-opening wicket door, as close to a 34” width x 64” height as allowable by manufacturer, centered horizontally and vertically in main door, with opening 10” from bottom of door to 10” from top of door, to include:

· Beveled Wicket Door Edge.

· Laminated glass view panel (5/16” thick, 5” width x 20” height opening), horizontally set 9” from the opening side of the wicket door, vertically set 3’6” from the bottom of the view panel to finished floor; must include integral blinds in the view panel, with operable controls, with a specialized key, located on the corridor for staff access.

· Replacement of both C-wing and D-wing door handles with a new anti-ligature handle that matches the design of the current C-wing handles. Implement quiet action to door handles, if possible, without negatively impacting the door’s fire rating.

· Painted metal frame around the View Panel to match patient room door color as closely as possible.

· Concealed wicket door hinge, as supplied by Manufacturer.

· A single-sided deadbolt able to accept the housing and cylinder in use at the VHASLCHCS IPU.

· Flush-mount door pulls.

· Mylar 20-minute label to be located on top of wicket door in lieu of being located on the corridor door, so that it is hidden from view and protected from tampering.

· Over the door alarms shall be removed, reinstalled, and recertified to confirm connection to the established alarm system.

· Protection Plates on the lower 10” of door, just up to the wicket door opening as close to the side and bottom edges of the door as possible.

· Beveled Replaceable Edge Profile.

· Ligature-resistant institutional privacy mortise locksets, to include:

· Ligature-Resistant Strikes

· Ligature-Resistant Tapered Collars compatible with the cylinders in use at the VA Salt Lake City Health Care Service IPU.

· Housing for all locks.

· For added security, construction hard walls must be Hard-Body Impact Resistant Classification Level 1 (90f.-lbs).

3. Performance Period: 180 calendar days from NTP.

4. Hours of work: Work shall take place during normal business hours (7:00 AM to 5:00 PM), Monday through Friday, all Federal Holidays excluded. Weekend and holiday work and work outside normal business hours may be allowed upon approval from the COR. Written notification must be given to the COR at least five working days before the weekend, holiday, or day in question.

Federal Holiday: The following Federal legal holidays are observed by this facility:

New Year’s Day
January 1
Martin Luther King’s Birthday
Third Monday in January
President’s Day
Third Monday in February
Memorial Day
Last Monday in May
Juneteenth
June 19
Independence Day
July 4
Labor Day
First Monday in September
Columbus Day
Second Monday in November
Veteran’s Day
November 11
Thanksgiving Day
Fourth Thursday in November