RFQ 36C25926Q0128 0006 Fire Alarm Testing Certification Service Jack C Montgomery VAMC.pdf
PDF 213 KB Posted
- Attached to
- Fire Alarm Testing and Certifications
- Solicitation number
- 36C25926Q0128
About this file
This is Amendment 0006 to RFQ 36C25926Q0128 for Fire Alarm Testing-Certification and Service at the Jack C Montgomery VA Medical Center in Muskogee, Oklahoma, issued by the Department of Veterans Affairs Network Contracting Office NCO 19. The amendment extends the offer receipt deadline to February 27, 2026, at 15:00 CST and publishes questions and answers addressing contractor inquiries. No additional questions will be accepted after this amendment.
The contract covers comprehensive fire protection system testing and certification services over a base period from March 10, 2026, through February 28, 2027, with four optional one-year periods extending through February 28, 2031. Line items encompass multiple testing categories: dry system annual testing (2 EA), fire pump testing (1 EA), semi-annual testing (2 EA), annual testing (1 EA), biennial testing (1 EA), hoods testing (4 EA), FM200 testing (2 EA), and sprinkler/smoke/pull station testing (413 EA). Key facility assets include 6 dry systems and 1 wet sprinkler system, 10 fire hydrants, 6 standpipes, 20 fire pumps, 16 elevators and 2 dumbwaiters, 4 kitchen hoods, 4 FM200 systems, 5 operating rooms, and 30/125 air/water gauges requiring replacement per NFPA 25 standards. Testing must occur during normal business hours (0730-1600 Monday-Friday) with Joint Commission compliance required. The contractor must provide barcode equipment and input device information into an approved VA IT system. The five-year inspection is due in 2026. This is a new contract with no incumbent. NAICS Code 541350 (Building Inspection Services) and PSC H242 (Equipment and Materials Testing) apply.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25926Q0128 0006 RFQ
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 16
None
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
36C259
Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
To all Offerors/Bidders
36C25926Q0128
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-27-2026 15:00 CST
See CONTINUATION Page
X 1
Fire Alarm Testing-Certification and Service for the Jack C Montgomery VA Medical Center Muskogee, OK.
**NO MORE QUESTIONS ACCEPTED**
This amendment is to publish Questions and Answers for the Fire Alarm Testing-Certification and Service for the Jack C Montgomery VA Medical Center Muskogee, OK.
The Line Items incorporated in this amendment supersedes all other Line Items and must be priced out completely.
Jeff Eller Contracting Officer
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVIC
ES
QUANTIT
Y
UNI
T UNIT PRICE AMOUNT
2.00 EA ________________
Dry System annual testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials Testing - Fire Fighting, Rescue, and Safety Equipment;
Environmental Protection Equipment and Materials
1.00 EA ________________
Fire Pump testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Semi Annual testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Annual testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Biennial testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
4.00 EA ________________
Hoods testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
FM200 testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
413.00 EA ________________ ________________
Sprinklers/Smokes/pull station testing testing per Performance Work Statement Contract Period: Base POP Begin: 03-10-2026 POP End: 02-28-2027 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Dry System annual testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Fire Pump testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Semi Annual testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Annual testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Hoods testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
FM200 testing per Performance Work Statement Contract Period: Option 1 POP Begin: 03-01-2027 POP End: 02-29-2028 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Dry System annual testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Fire Pump testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Semi Annual testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Annual testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Biennial testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services
Hoods testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
FM200 testing per Performance Work Statement Contract Period: Option 2 POP Begin: 03-01-2028 POP End: 02-28-2029 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Dry System annual testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Fire Pump testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030 PRINCIPAL NAICS CODE: 541350 - Building Inspection
Semi Annual testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Annual testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Hoods testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
FM200 testing per Performance Work Statement Contract Period: Option 3 POP Begin: 03-01-2029 POP End: 02-28-2030
Dry System annual testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Fire Pump testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Semi Annual testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Annual testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031
PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Biennial testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
Hoods testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
FM200 testing per Performance Work Statement Contract Period: Option 4 POP Begin: 03-01-2030 POP End: 02-28-2031 PRINCIPAL NAICS CODE: 541350 - Building Inspection Services PRODUCT/SERVICE CODE: H242 - Equipment and Materials
GRAND TOTAL ________________
A.2 QUESTIONS AND ANSWERS
QUESTIONS AND ANSWERS
1. “All devices inspected must be barcoded and input into an electronic inventory system. All barcoded device information (make/model/date of install) will be input into the same system.” Are the device barcodes already in place? Do we need to provide that equipment?
Most of the equipment has been labeled but not barcoded. Contractor will need to provide that equipment for barcoding.
2. “PM must be scheduled during normal business hours, 0730 to 1600 hours, Monday through Friday.” Can kitchen hoods be inspected during normal business hours? Can speakers and/or horns/strobes be tested during normal business hours?
Yes, normal business hours are fine.
3. Is there a base station that reports smoke detector sensitivity?
There is a base station, but it doesn’t report sensitivity.
4. Are all the annual inspections on the same schedule?
No, but the intent is to get them all on the same schedule.
5. What month is the annual inspection due for each of the types of systems (sprinkler, fire alarm, special hazards)?
Sprinkler in Nov, Fire Alarm in Jan, and special hazards had the year, but no month on the tags, so Jan.
6. What year is the last hydrostatic testing for the kitchen hoods conducted?
There are 4 tanks, 3 tanks built in 2016, 1 was retested in 2018.
7. Are three-year dry inspections part of this contract? If so what month, and year(s) will they be due in?
Yes, dry inspections are part of the contract. Will be due the first and third years.
8. What month and year are the five-year inspections to be conducted on the Sprinkler systems?
2020 Either November or December. The hole is punched through both of those months.
9. When a device test is bad, or a deficiency identified, will we provide a quote to repair/remedy the deficiency?
Yes, you will provide a quote to COR and it will be handled outside of this contract.
10. How many standpipes are on the campus?
11. Is the elevator contractor under a separate contract to access devices in the elevator shafts? Will the VA be making the coordination for this service?
We currently do not have an elevator maintenance contract and are waiting on one to be issued.
12. How many elevators do we need to inspect?
16, 14 elevators, and 2 dumbwaiters
13. FM200s/Kitchen Hoods-What is the date of the last hydrostatic testing of the cylinders?
There are 4 tanks, 3 tanks built in 2016, 1 was retested in 2018.
14. How many air or water gauges are there?
30/125 air/water gauges
15. “Contractor must furnish and replace all gauges in accordance with the most recent NFPA 25 standards.” Are all the gauges on the same replacement schedule? When was the last time they were replaced?
The gauges are on the same schedule and are due for replacement.
16. How many fire hydrants are on the campus?
17. What month are the fire hydrant inspections due?
April
18. How many Wet Systems/Dry Systems/pre-action systems are on the campus?
3/4/4
RFQ 36C25926Q0128 Fire Alarm Testing Certification
19. Can we have a site visit to see current conditions? I am not sure this is necessary but if you think it is, we can schedule one, it may delay the award by a few days?
No, site visit is not scheduled
20. How many fire pumps are there?
21. What are the specs for the fire pumps (GPM, Boost pressure, etc.)
Alas Chalmers, 6”X6”X9F A-C Pump Series 8100, HSC, 125# flanges, rated for 750 GPM @60 PISG, with 50HP high eff. Electric motor, 3600 RPM, 460v/3/60. ODP 150% Capacity @ 55psig.
22. What type of fire pumps are we working with? (Diesel, electric, vertical inline, horizontal split case, etc.)
Electric motor, 3600 RPM, 460v/3/60.
23. The SOW requires Joint Commission compliant reports to be provided both in hard copy and electronic format (I-SOW). Can the VA provide the specific reporting requirements or identify the specific Joint Commission standard or guidance that defines the reporting requirements?
https://www.jointcommission.org/en-us/knowledge-library/environment-of-care/fire-protection
24. The SOW requires cleaning of all smoke detectors as required (II-1-B). At what interval is this required?
When the visual of the smoke detector is performed.
25. The SOW requires all devices to be barcoded and entered into an electronic inventory system. Is there a required or preferred reporting platform, or will any third-party system meeting the stated criteria be acceptable? Would the Barcloud platform be acceptable?
There is not a required or preferred platform. Anything on this web page is acceptable. I do not see BarCloud on that list. Anything else would have to be processed for approval. Approval has to go to national OIT for review can take anything from 6 months to 2 years approval. A submittal does not guarantee approval. https://www.oit.va.gov/Services/TRM/ToolListSummaryPage.aspx
26. Sprinkler Systems
a. How many sprinkler systems are installed throughout the facility?
3 wet /4 dry /4 preactions
b. What types are present (e.g., wet, dry, preaction)?
3 wet /4 dry /4 preactions
27. Special Hazard Systems
a. How many special hazard systems are installed?
b. Specifically, how many FM200 systems are in use?
28. Fire extinguishers, what is the total number of fire extinguishers throughout the facility?
Fire extinguishers are not part of this contract.
29. Kitchen Hoods, how many total kitchen hoods are installed throughout the facility?
30. Whether incumbent contractor information can be shared?
New contract
31. Is there any additional equipment inventories or system details exist beyond what is included in the
Performance Work Statement?
None
32. Any available information regarding Operating Rooms (ORs), including quantity and scheduling considerations?
5 OR – The testing would have to be the first thing in the morning, or last thing in the evening.
Currently there is a lull from opening to 900 on Mondays as the surgeons go through their cases.
Contractors will have to bunny suit up to enter.
33. Whether there are defined time windows or duration expectations for annual, semi-annual, and quarterly inspections
The annual is once a year, semiannual is twice a year, and quarterly are done every 3 months. Once the contract is awarded and all the inspections are complete the time will start on those inspections.
34. Section B.4 Price/Schedule includes a CLIN 0008 qty 240 Sprinklers/Smokes/Pull Station Testing per PWS, but the qty provided in the Device List includes 0 Sprinklers, 147 Pull Stations, and 266 Smoke Detectors. There is not an 8th CLIN for the option years, and based on the discrepancy in the Device List, we suspect this CLIN to be included by mistake. Our assumption would be that testing for these devices should be included in the other CLINS.
a. Will the government please clarify the intent for this CLIN 0008, and if truly required, provide an accurate count of Sprinklers/Smokes/Pull Stations?
Gov Response: The numbers were combined into a combined device count of 240, it should have been 413 devices.
35. SOW Section VI. Hydrants, standpipes, and fire pumps list requirements for Hydrant and Standpipes;
however, there are no quantities provided.
a. Will the government please provide a quantity of Hydrants and Standpipes?
10 hydrants and 6 standpipes
36. SOW Section IV. Kitchen hood fire suppression systems advise "Work is to include replacement of chemical extinguishing material and links when required." Typically, and largely due to variance, this is not included in up front pricing but quoted following inspection if a deficiency is identified.
a. Will the government please confirm should this service be priced into our semi-annual testing, or will a bi-lateral contract modification be allowed if the contractor determines this service is required?
The goal of this contract is to modernize and bring these systems up to code. The requirement for testing is determined by VA specifications and should be included in a knowledgeable subject matter quote.
A modification to the contract may be needed if this service is determined as needed, during a contract period of performance.
37. SOW is silent on Fire Hose Testing.
a. Will the government please confirm, will Fire Hose Testing be included in the SOW? And if so, will the government please provide a quantity of Fire Hoses?
There are no fire hoses on campus.
The places that had fire hoses have been disabled.
38. SOW Section III Water-based Systems list requirements for Water-based systems inspection quarterly, semi-annually, and annually, as well as 5-Year. There is no 5-Year CLIN included in Section B.4 Pricing/Schedule.
a. Will the government please advise when the 5-Year will be due? Will an additional CLIN be required or should the 5-Year pricing be bundled within Annual Inspection CLINs?
The five year is due in 2026.
VA engineering cannot advise on the bid process.
Each CLIN is labeled as a separate line item. If each inspection is independent of each other, the FAR dictates those line items should be separate.
39. SOW Section III Water-based Systems list requirements for Water-based systems inspection quarterly, semi-annually, and annually, as well as 5-Year; however, no quantities have been provided.
a. Will the government please confirm the total quantity of and type of system risers?
Six standpipes, Water filled.
40. SOW Section III. Water-based Systems, subsection 3. Five-year Test and Inspection states "Contractor must furnish and replace all gauges in accordance with the most recent NFPA 25 Standards"; however, no quantities of water-based system risers or gauges has been provided.
a. Will the government please confirm total qty of water-based risers and gauges?
Six standpipes and 155 gauges.
41. Can you please provide the most recent annual inspection report for all systems so we can have a better understanding of the amount of work, specific type and model of devices, and other useful information these reports contain which will assist in our bid development?
That report has been deemed insufficient and out of compliance. No reference will be allowed from that contract.
42. Is a site visit planned for this solicitation? If not, who could we schedule a site visit with so we can walk the facilities for review for challenging access issues, determine specialty equipment required, and observe the general condition of equipment covered under this contract?
No walk through is being allowed. Unsupervised site visits are not allowed.
43. The scope of work, Section I, states official testing reports must be from NFPA 72 or Building Reports.
General, Section II, states all devices must be barcoded and input into an electronic inventory system, and other electronic data format like PDF's will not be accepted. Is scanning devices and utilizing Building Reports a requirement of this solicitation?
a. If Building Reports is a requirement, will the VA provide the offeror access to the existing database being used, or will we be required to redevelop the database with all the devices?
Devices have been tagged, but no data base was built and handed over.
b. Are all devices presently barcoded for Building Reports, or will the contractor be required to barcode all or some of the devices?
Some devices have been bar coded, but not all. We do not have the previous contractors information on that bar code system.
44. What is the method of smoke damper activation? Local area smoke detector, general building fire alarm condition, or something else?
fusible link
a. How many dampers are in each building?
There are about 110 in the campus.
b. Can you please confirm this scope of work does not require the 6-year damper inspection per the Joint
Commission EC.02.03.05 EP 18?
Dampers are a different contract, and not apart of the fire alarm testing contract.
45. The Price/Cost Schedule is difficult to understand. Can you please clarify the following:
a. X001 - Quantity is 2 EA. Is this because there are 2 separate dry pipe sprinkler systems, or are you looking for 2 inspections per year (semi-annual and annual)? The description says annual, but the inventory doesn't list a quantity of dry pipe sprinkler systems.
semi-annual and annual inspection of 6 dry pipe sprinklers systems.
b. X003 - Quantity is 2 EA, which we assume is 2 inspections per year. What equipment does this line-item cover? There are CLINs specifically for dry system inspections, hoods, FM system, and one specific to sprinklers/smokes/pull stations.
semi-annual and annual inspection
c. X004 - The description states annual testing, but other line-items include annual testing such as dry systems and the fire pump. What equipment does this line-item cover?
d. X005 - What is this for? The scope of work does not mention biennial testing. Please clarify.
It is a line item in years 1, 3, and 5.
e. X006 - Quantity is 4 EA. It appears from the scope of work there are 4 systems, but these require semi-annual inspections. Please confirm the quantity of 4 is reflective of 4 systems, but 8 total inspections throughout the year?
There are 7 systems, 6 dry and 1 wet system.
f. X007 - Quantity is 2 EA. The scope of work and device inventory list do not clearly indicate the number of FM 200 systems. Does 2 EA represent 2 individual FM 200 systems? Or 2 inspections per year (semi-annually)?
2 inspections of the FM 200 system. 4 hoods.
g. X008 - Quantity is 240 EA. What does this represent and what is the scope of work? The description states sprinklers/smokes/pull stations. There are definitely more than 240 sprinklers throughout the buildings, and the total count of smokes and pull stations from the device inventory list totals 413. Please clarify what is to be included in this CLIN?
The 240 is a bad number, it should be 413.
i. Also, this CLIN does not exist in any other contract years. Please clarify.
That inspection should be every year.
46. The Joint Commission has additional inspection and testing requirements not specifically defined in this scope of work. Because the solicitation openly states all tests and inspections must be performed in accordance with the Joint Commission, for the purposes of clarity and full transparency, can you please include a reference to all the Joint Commission Elements of Performance required to be completed under this contract? The way the scope of work is outlined, and the Price/Cost Schedule, it is not clear with elements of performance are expected to be completed under this contract.
https://www.jointcommission.org/en-us/knowledge-library/environment-of-care/fire-protection
47. Is there a particular reason why all inspections must be completed using three (3) technicians? This may drive added and unnecessary costs to the taxpayers as most fire protection and life safety system inspections only require two (2) technicians. We would use our discretion to provide a third or fourth technician if required to meet scheduling timelines. But we don't believe it's necessary for all inspections.
Can you please clarify the intent and applicability of this requirement?
3 technicians were for a quick turnaround of testing. If your 2 technicians can do the inspections as quickly as 3 technicians, then that will be allowed.
48. Section III Water-Based Systems references antifreeze solution. Can you please provide additional information on the antifreeze system? A picture of the placard on the riser should provide the system size and type of fluid used.
a. How many antifreeze systems exist? The device inventory list provided does not state there are antifreeze systems.
There are 5 dry systems. There is nitrogen in the pipes.
49. Which year of the contract are the 5-year test and inspection services required? When were they last performed?
a. The Price/Cost Schedule does not provide a line item for these services, which line-item should we include the cost for these services if one is not added?
The five years are in in 2026.
50. How many fire hydrants are to be tested? There are no quantities of fire hydrants provided in the device inventory list.
10 hydrants
51. How many standpipes are to be tested? There are no quantities of standpipes provided in the device inventory list.
6 standpipes
52. There are a lot of questions here that depending on the responses received could generate additional questions. Will you provide an opportunity for follow up questions/clarifications following the release of responses to initial RFI's?
Will be answered on the first page of the RFQ.
53. 1How many hydrants are to be tested?
10 hydrants.
54. 2Section III, Number 3: 5-year inspection. These are normally quoted separate as it is not an annual service. When is the 5-year service due?
55. 3B.4 Price/Cost Schedule: Item 001 refers to only 2 dry systems and no wet systems. Are there no wet sprinkler systems on campus?
There are 6 dry systems, and 1 wet.
56. B.4 Price/Cost Schedule Item 0003: What is being tested semi-annually?
Everything in the semi-annually of the water based, hydrants, standpipes, and fire pumps, and general testing paragraph.
57. B.4 Price/Cost Schedule Item 0004: What is being tested annually?
Everything in the annually of the water based, hydrants, standpipes, and fire pumps, and general testing paragraph.
58. B.4 Price/Cost Schedule Item 0005: What is being tested biennially?
Everything in the semi-annually of the water based, hydrants, standpipes, and fire pumps, and general testing paragraph.
59. B.4 Price/Cost Schedule Item 0008: What is full SOW?
Cost to do the entire SOW.
RFQ 36C25926Q0128 0006 Fire Alarm Testing Certification and Service