36C25926C0059_1.docx
DOCX document 18 KB Posted
- Solicitation number
- 36C25925R0113
About this file
This is an Award Notice for a design services contract awarded to CITRINE LLC for electrical capacity expansion at the Grand Junction VA Medical Center. The contract, numbered 36C25926C0059, was awarded on July 16, 2026, in the amount of $769,409.00 under solicitation 36C25925R0113. The contract is set aside for Service-Disabled Veteran-Owned Small Business (SDVOSBC) and is classified under NAICS code 541330 (Engineering Services).
The scope of work requires the contractor to provide comprehensive design services for expanding electrical capacity on the north and east sides of the Grand Junction VA Medical Center campus (2121 North Ave, Grand Junction, CO 81501). Specific deliverables include: (1) remodeling and expanding electrical rooms 1634-1 and 1635-1 by 800 square feet to accommodate switchboards, panels, and an Automatic Transfer Switch; and (2) creating a new electrical room on the eastern side of the campus to support temporary facilities. The design must deliver three-phase, 208V, 800A power with normal, critical, life safety, and emergency circuits. All design work must comply with VA Design Manuals, the National Electric Code (NEC), National Fire Protection Association (NFPA) standards, International Building Code (IBC 2003), and VA Information Security Handbook 6500.6. The contractor is responsible for all electrical, architectural, and mechanical design work, including fire barrier penetrations, system testing and commissioning, energy efficiency improvements, utility relocation specifications, and submission of red-line design documents within 30 days of construction completion. The contracting office is located in Greenwood Village, Colorado (80111), with Mark Holland serving as the primary contract specialist.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Award Notice
| SUBJECT* |
| Project 575-23-107 | Expand Electrical Capability | Design |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 80111 |
| SOLICITATION NUMBER* |
| 36C25925R0113 |
BASE NOTICE TYPE
| ARCHIVE |
| 30 DAYS AFTER THE AWARD DATE |
| RECOVERY ACT FUNDS |
| N |
| PRODUCT SERVICE CODE* |
| C1DA |
| NAICS CODE* |
| 541330 |
| SET-ASIDE |
| SDVOSBC |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
POINT OF CONTACT*
Contract Specialist Mark Holland Mark.Holland@VA.gov 303-712-5828 N/A N/A
AWARD INFORMATION
| AWARD NUMBER* |
| 36C25926C0059 |
| AWARD AMOUNT* |
| 769,409.00 |
| LINE ITEM NUMBER |
| 0001-1001 |
| AWARD DATE (MM-DD-YYYY)* |
| 07-16-2026 |
| AWARDEE NAME* |
| CITRINE LLC |
| CONTRACTOR’S UEI |
| JKPGTKHSKRP4 |
AWARDEE ADDRESS LINE 1*
AWARDEE ADDRESS LINE 2*
| AWARDEE ADDRESS LINE 3* |
| 710 KIPLING ST STE 406 |
AWARDEE ADDRESS LINE 4*
| AWARDEE CITY |
| LAKEWOOD |
| AWARDEE STATE |
| CO |
| AWARDEE ZIP CODE |
| 80215 |
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/western-colorado-health-care/locations/gr |
| URL DESCRIPTION |
| Grand Junction VA Medical Center |
| AGENCY CONTACT’S EMAIL ADDRESS |
| Mark.Holland@VA.gov |
| EMAIL DESCRIPTION |
| Mark Holland |
DESCRIPTION
SCOPE OF WORK: This contract will provide designs for expanding the electrical capacity of the Grand Junction VA Medical Center.
The A-E is to provide design services to expand the electrical capacity of the Grand Junction VA Medical Center (2121 North Ave, Grand Junction, CO 81501).
The contractor shall design the following:
Statement of Work: The Grand Junction VA Medical Center campus has 22 buildings, with 321,557 gross square feet of space. To expand services, the VA requires additional electrical power on the north and east sides of the campus. The northern electrical room remodel will support future expansions while the newly created eastern electrical room will support temporary facilities that provide workspaces for displaced employees. In the past, temporary spaces have been modular in nature and could be tents, trailers or other types of temporary facilities.
Most work will be conducted indoors, however, Grand Junction, CO has a semi-arid climate, with hot summers and generally mild winters. During the summer months temperatures typically reach into the 90s Fahrenheit during the day, while evenings tend to remain comfortable and cool. Winters are usually mild, but snow does occur, and temperatures can cool down to freezing averages. Spring and fall tend to be transitional seasons with moderate temperatures. The area receives around ten (10) inches of precipitation per year with most of it falling from April through August.
1. Specific project tasks:
a. Remodel and add on to 1634-1 (433 SF) / 1635-1 (433 SF) to ensure adequate electrical utilities exist to support the north portion of the WCHCS on the Grand Junction, CO campus. This will include expanding the rooms by 800 SF to the west. This additional space will allow the hospital to add switchboards and panels when needed and enclose an Automatic Transfer Switch (ATS).
b. Add a new electrical room to ensure adequate electrical utilities are in place on the eastern side of the WCHCS on the Grand Junction, CO campus. This will provide electrical capacity from location 1 on the western side of the WCHCS to location 2 (see attachment A) on the eastern side.
c. The minimum power requirements are three-phase, 208V, 800A and include normal, critical, life safety and emergency power circuits. This electrical run will terminate in a new conditioned electrical space at location 2 after passing through necessary electrical step-down equipment at site 3. Any future projects that have temporary facilities will be designed to be compatible with 208V and use no more than 80% of the amperage available per branch circuit. These facilities will be expected to run power from their location to the new electrical room distribution point designed at location 2.
2. All aspects of the design must adhere to the NEC Design manuals posted on the VA technical information library at the following sites: http://www.cfm.va.gov/til/ and https://vatilms.va.gov/vatilms/catalog.
3. All electrical, architectural, and mechanical work for these systems will be designed by the A-E.
4. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs (VA) Design Manuals and VA Publications (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory, International Building Code IBC 2003, NFPA and National Electric Code (NEC), building codes and standards, and VA Information Security Handbook 6500.6, etc.).
DESIGN CRITERIA: As part of the design the following list needs to be considered:
1. All electrical work will be terminated by the contractor. The design must be clear who and what is supplied for the termination equipment.
2. Any penetration through any fire barriers whether a floor or wall will be done in this contract to meet VA standards and National Fire Protection Association (NFPA). The contractor shall obtain permits issued by the facility before any penetration shall occur.
3. The installed system and its components shall be tested and commissioned. This will be included in the design and construction documents.
4. Implement new technologies in electrical systems to improve and facilitate energy usage reductions. The system will be compatible with the existing control systems on station.
5. All finishes will be coordinated with the VA interior designer and called out in a finish schedule.
6. All testing and balancing parameters will be provided by the A-E.
7. Design documents that show the red lines will be submitted by the contractor to the A-E, put into the AutoCAD drawings and submitted within 30 days of the completion of the construction project. According to VA standards as outlined in the VA Specifications Technical Library.
8. All existing utilities which are designed to be relocated or modified shall have directions to the contractor on the new location and modifications.
*= Required Field Award Notice