36C25925Q0252.docx
DOCX document 19 KB Posted
- Attached to
- J041--Chiller #1 Vane Motor Replacement
- Solicitation number
- 36C25925Q0252
About this file
This Sources Sought Notice is for a Chiller #1 Vane Motor Replacement project at the Oklahoma City VA Health Care System. The Department of Veterans Affairs is seeking qualified contractors to perform a specialized maintenance service involving removal, replacement, and recalibration of a chiller's vane motor. The project requires a contractor to remove the existing vane motor, replace and calibrate vanes, check and fill sump oil to manufacturer specifications, and verify chiller operation, with a performance period of 30 days.
The solicitation (36C25925Q0252) is classified under NAICS code 238220 and seeks market research to determine the socioeconomic status of interested companies. Interested vendors must respond via email to Tiffani Perkins by March 14, 2025, and provide details including their business size, percentage of total contract value retained, subcontractor information, SAMs Unique Entity Identifier, and any applicable GSA contract numbers. The project emphasizes compliance with VA safety policies, infection control procedures, and applicable federal, state, and local regulations, with a goal of ensuring 95% equipment uptime.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought Notice Sources Sought Notice
| SUBJECT* |
| Chiller #1 Vane Motor Replacement |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 80111 |
| SOLICITATION NUMBER* |
| 36C25925Q0252 |
| RESPONSE DATE/TIME/ZONE |
| 03-14-2025 15:00 CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 90 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| J041 |
| NAICS CODE* |
| 238220 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
POINT OF CONTACT*
Contract Specialist Tiffani Perkins Tiffani.Perkins@va.gov
PLACE OF PERFORMANCE
| ADDRESS |
| Department of Veterans Affairs |
Oklahoma City VA Health Care System
921 NE 13th St
Oklahoma City OK
| POSTAL CODE |
| 73104 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/oklahoma-city-health-care/ |
| URL DESCRIPTION |
| Oklahoma City VA Health Care System |
| AGENCY CONTACT’S EMAIL ADDRESS |
| Tiffani.Perkins@va.gov |
| EMAIL DESCRIPTION |
| Contract Specialist |
DESCRIPTION
Performance Work Statement (PWS) Department of Veterans Affairs (VA) Veterans Health Administration (VHA) Chiller #1 Vane Motor Replacement (Brief Scope of Work)
PURPOSE
Veterans Affairs has a requirement for Chiller #1 Vane Motor Replacement services at the Oklahoma City VA Health Care System (OKCVAHCS). Services are to be performed in accordance with this PWS and to OEM standards, with the intent of ensuring the equipment operates as the original manufacturer intended, uninterrupted (95% uptime), in a cost-effective, efficient manner, contributing to the VA Mission.
This is a non-personal services contract. The Contractor, its employees, agents and subcontractors shall not be considered VA employees for any purpose of fulfilling the SOW and shall be considered employees of the Contractor.
C&A requirements do not apply, and a Security Accreditation Package is not required.
LOCATION:
Oklahoma City VA Health Care System (OKC VAHCS) 921 NE 13th St.
Oklahoma City, OK 73104
TASKS AND REQUIREMENTS:
· This project is to remove the vane motor from the chiller replace and calibrate vanes. Check oil in the sump and fill to manufacture specs. Start the chiller and check the operation.
· The contractor is fully responsible for verifying and validating all information contained within this statement of work. The contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site.
· All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances.
· All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified.
· The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA HCS.
· VA facilities are tobacco-free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor’s compliance with this policy.
· All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards.
· The contractor shall provide supervision, manpower, and materials to remove the existing vane motor check sump oil levels and start the chiller and chiller operation.
· Contractor shall remove the vane motor replace the motor and re-calibrate.
· Contractor shall check the sump oil level and fill per manufacturer specs.
· Contractor shall start chiller and check operation.
· Contractor shall dispose of any trash or debris they generate during the duration of the performance period and completion of the project.
· Clean up the area after project completion and contact COR for final inspection.
· Performance Period: 30 days
IMPORTANT NOTE: This Sources Sought is for information only (to determine the socioeconomic status of interested companies). No award will be made off of this posting.
LIMITATIONS OF SUBCONTRACTING: The Limitations of Subcontracting may or may not apply to a resulting solicitation from this Market Research. Vendors are advised to familiarize themselves with Federal Acquisition Regulation parts 19.505(a)(2) and 19.505(b)(1) as it pertains to subcontracting limitations. Vendors are also advised to familiarize themselves with 13 CFR 125.6 and the penalties described in this regulation.
Please communicate via e-mail to tiffani.perkins@va.gov by COB 3/14/2025 as to your company’s interest and ability to perform service per this brief Scope of Work.
If interested, please provide the following:
1. Please state your company’s business size as related to NAICS code 238220
1. As per the Limitations of Subcontracting: (see FAR 19.505)
1. As Primary Contractor: what % of “Total Contract Value” will you retain?
1. If using a Subcontractor: what % of “Total Contract Value” will go to them?
1. Please provide SAMs Unique Entity Identifier number
1. If you have an FSS/GSA contract that includes this service
1. Provide FSS/GSA contract number if applicable
In order for you company’s information to be counted in relation to this Market Research all above questions must be answered.
| *= Required Field |
| Sources Sought Notice |
Sources Sought Notice
File details come from the government source that posted it. Updated .