36C25924R0024 0003.docx
DOCX document 29 KB Posted
- Solicitation number
- 36C25924R0024
About this file
This document contains pre-bid questions and answers for a federal solicitation to chip seal roads and parking lots at a Department of Veterans Affairs medical center. The solicitation seeks chip sealing of roads and parking lots identified in the drawings, including applying a liquid asphalt layer followed by crushed gravel which will be compacted. Two line items are included to allow for either award of the full project or a reduced scope without three parking lots, depending on available funding. Bidders must follow Wyoming Department of Transportation specifications for preparation and testing only, with work to occur weekdays and Saturdays to avoid Sundays and holidays. The period of performance is 12 days less under the reduced line item. All questions received were answered providing clarification such as parking lot striping requirements and contractor responsibilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0024 0006.docx | DOCX document | |
| 36C25924R0024 0005.docx | DOCX document | |
| 321723 Pavement Markings.doc | DOC document | |
| 36C25924R0024 0004.docx | DOCX document | |
| SiteMap Chip Seal 24x36 Updated.pdf | ||
| 36C25924R0024_revised bid schedule_page 5 of 82.docx | DOCX document | |
| 52.232-18 AVAILABILITY OF FUNDS.docx | DOCX document | |
| 36C25924R0024 0002.docx | DOCX document | |
| 36C25924R0024 0001.docx | DOCX document | |
| Specifications_Chip Seal Roads Project_01.pdf | ||
| S02-3-10-2021 Past Performance Questionnaire_Chip Seal Roads.pdf | ||
| 36C25924R0024_2.docx | DOCX document | |
| Drawings Chip Seal 24x36.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 666-24-106 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25924R0024 12-20-2023
X X X 1:00 PM MT on 2/2/2024.
The purpose of this amendment is to provide answers to site visit questions and to provide revised Site Plan, revised Bid Schedule and insert the clause 52.232-18, Availability of Funds into the RFP.
See continuation pages for questions and answers from site visit.
Revised "Site Map Chip Seal" is attached.
Revised Bid Schedule, page 5, is attached.
Clause 52.232-18, Availability of Funds, is attached.
Project 666-24-106 Chip Seal Roads Project Pre-bid RFI Questions and Answers
Q1. Do we need to include the 24 crosswalks that are currently there, in the new striping bid?
A1. Yes Q2. Is there any curbing along the streets, parking lots, etc. that need to be included in the bid and how much linear footage if so?
A2. No curb or gutter painting Q3. The plans show 477 parking stalls and 36 handicap parking spots. There are currently on ground at the VA 582 parking stalls and 43 handicap parking spots. Should we bid off the plans or off of what is existing. Are they wanting the exact number of stalls restriped for this bid that are currently there?
A3. Restripe all new asphalt surfaces to match existing asphalt parking lots. Yes, the exact number of existing stalls shall be restriped.
Q4. Also, there are some discrepancies in “No Parking area stripes” and handicap aisle striped areas between the plans and what is currently there. The plans don’t seem to have any aisles next to the handicap spots. Should we just bid what is currently at the VA?
A4. See A3. Restripe new parking lots to match existing.
Q5. Will the VA award the item numbers on the price schedule separately?
A5. Yes, Line Item 0001 is for the entire project, as included on SOW, drawings, and specifications. Line Item 0002 is for all work, minus the price for parking lots 6, 22 and service parking lot adjacent to the softball field and Navy Lane. One line item or the other will be awarded, depending upon available funding.
Q6. Can they award one item number and not the other?
A6. Yes, as explained in answer to question 5 above.
Q7. Line item one is the project completely and line item 2 is the project completely minus any work, labor, profit, and overhead related to parking lots 6, 22 and service parking lot adjacent to the softball field and Navy Lane, as indicated on the plans. If that is the case, not sure why there is a grand total at the at the bottom of the bid schedule?
A7. There is no need for a grand total line at the bottom of the schedule. The grand total line has been removed on the revised bid schedule attached to this amendment. Offerors may either use the revised schedule provided or leave the grand total line item blank on the original schedule.
Q8. Looking at the drawings it is very unclear what is deducted from the base bid for line item two, can the VA provide a drawing showing the deductive alternate better maybe in a different color?
A8. See attached updated drawing showing deductive alternate areas.
Q9. Does line item two have the amae P.O.P?
A9. If line item 2 is awarded, the period of performance shall be 12 days LESS than the period of performance for line 1. Therefore, if line item 2 is awarded, the period of performance shall be 48 days.
Q10. Can this project be run by a superintendent performing QA/QC and SSHO duties as well?
A10. Yes, but only if the superintendent has the proper training to perform both tasks.
Q11. Will there need to be sperate individuals performing these tasks for this project?
A11. Yes Q12. When we are scheduled to work in the parking lot will we be able to have the whole parking lot?
A12. Yes Q13. Due to the nature of the application do we need to plan on doing all this work over the weekend or can we do some of the areas during the work week?
A13. Chip sealing of the roads may be done during the work week according to the schedule provided to the VA by the contractor at least two weeks prior to work beginning. Chip sealing of the parking lots may be performed on Saturdays. No work is to take place on Sundays or federal holidays.
Q14. If there is a car abandoned or left in a work area, who’s responsible will it be to have it towed?
A14. It shall be the responsibility of the VA to have any vehicles towed that are left in a work area when work needs to take place.
Q15. The VA has provided the WDOT specifics to this project, are we to just chip seal all the roads or follow the WDOT specifications and do all the prep work required before application?
A15. The contractor shall follow the SOW.
“For all roadways and parking lots identified, the contractor will apply a hot liquid asphalt layer followed by a layer of crushed gravel. The gravel layer will then be compacted, and the liquid asphalt allowed to dry. The contractor will then sweep up and remove any excess gravel. All chip sealed surfaces will then be repainted with new traffic lines and parking striping.”
The contractor shall follow the WYDOT spec to complete the prep work and testing only. No other WYDOT work described in the specifications shall be completed in this contract.
Q16. Is this a design build project?
A16. This is not a design build project.
Q17. Are we able to store equipment on site?
A17. The storage of equipment and materials on site will be allowed in designated areas, providing that the materials and equipment are stored according to the requirements of DEQ and OSHA regulations.
Q18. Is this project completely funded?
A18. Funds were reserved for this project; however, pending budget approval, the clause at 52.232-18, Availability of Funds is hereby added to the RFP.
Q19. There are currently areas painted for handicap parking and cross walks. Will those areas need to be painted after the new chip seal road is complete? If so, could the handicap parking spots and cross walks be indicated on the drawings? There is no striping indicated for the parking lot near building 112.
A19. See A3, A4 and updated drawing sheet. All parking lots and cross walks will need to be restriped to match existing.
See attached document: SiteMap Chip Seal 24x36 Updated.
See attached document: 36C25924R0024_revised bid schedule_page 5 of 82.
See attached document: 52.232-18 AVAILABILITY OF FUNDS.
Project 666-24-106, Chip Seal Roads, VAMC Sheridan Wyoming
File details come from the government source that posted it. Updated .