About this file

This document is a Statement of Work for the inspection and certification of biological safety cabinets, laboratory hoods, pharmacy clean/ante rooms, and specialized room ventilation systems at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado.

The contractor will be required to test and certify the equipment in accordance with various industry standards and regulations, including ANSI, CDC, OSHA, NSF, and USP requirements. The work includes semi-annual certification of pharmacy biosafety cabinets and annual certification of all other biosafety cabinets and laminar flow units. The contractor must also conduct semi-annual testing and certification of the pharmacy ante room, buffer room, and non-hazardous buffer room to validate air changes per hour, pressure differentials, particle counts, and viable air/surface sampling. The contractor must employ CETA-certified technicians and provide all equipment, tools, and materials. The period of performance is one base year with four one-year option periods. Work is to be performed during normal business hours, with the ability to work after hours if needed to accommodate the pharmacy schedule.

View the file

Other files

File Type Posted
36C25924Q0812.docx DOCX document
Wage Determination 2015-5419 Rev 27.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Inspection & Certification of Biological Safety Cabinets, Laboratory Hoods & Pharmacy Clean/Ante Rooms, and Specialized Room Ventilation Systems Rocky Mountain Regional VA Medical Center Aurora, Colorado 80045

1. PURPOSE

1.1 This requirement is for procuring services for testing and certification of fume hoods, biological safety cabinets, specialized room ventilation systems, and laminar flow units to provide a safe environment for laboratory personnel within multiple areas of the medical center. Contractor shall test and certify laboratory hoods/cabinets, sterile processing areas, and pharmacy clean/ante rooms. Location includes Rocky Mountain Regional VA Medical Center (RMRVAMC), 1700 N. Wheeling Street, Aurora, Colorado, 80045.

2. SCOPE

2.1 Contractor shall furnish service as specified below to ensure that the equipment functions in accordance with:

2.1.1. ANSI-ASHRAE 110 (current version)

2.1.2. Testing and Certification for conformance with applicable standards in accordance with specified VA engineering design criteria (such as, but not limited to, ASHRAE, CDC (NIOSH), and OSHA) for the Hazardous Waste and Material Storage Areas and engineering control's adequacy for employee protection.

2.1.3. BSL 3 Commissioning in accordance with most current edition of "Biosafety in Microbiological and Biomedical Laboratories".

2.1.4. Ensure chemotherapy compounding labs are tested in accordance with most current Controlled Environment Testing Association (CETA) Standards

2.1.5. National Sanitation Foundation-Class II, (Laminar Flow) Biohazard Cabinetry-Standard Number 49 [NSF 49].

2.1.6. SAMA Standard LF10-1980 Laboratory Fume Hoods and USP 797/USP 800

2.1.7. USP General Chapter 800 Hazardous Drugs-Handling in Healthcare Settings 2017

2.1.8. CAG-002-2006

2.1.9. CAG-003-2006

2.1.10. CAG-007-2010

2.1.11. CAG-008-2010

2.1.12. IEST RP-CC-034

2.2 Furnish all labor, equipment, tools, materials, and travel necessary to test, certify and measure Government – owned biological safety cabinets, laminar flow units, hoods, pharmacy clean rooms and others as specified. Equipment and area details are provided below:

Item Number
Room Location
Serial #/ID
Make
Model
Type/Class
Filter Count
Responding Service
Cert. Date
1
FS-112B
HD Sterile Anteroom
Custom
Clean Room
HD Sterile Anteroom
1
Pharmacy
June-Dec
2
FS-112D
171235111315
Nuaire
NU-435-400
B2/II
2
Pharmacy
June-Dec
3
FS-112C (Hazardous Drug Storage)
Hazardous Drug Storage
Custom
Clean Room
HD Storage
1
Pharm
June-Dec
4
FS-112D (HD Sterile Buffer Room)
HD Sterile Buffer Room
Custom
Clean Room
HD Sterile Buffer
1
Pharm
June-Dec
5
F3-147A (Non-HD Ante Sterile Ante)
Non-HD Ante Sterile Ante
Custom
Clean Room
Non-HD Sterile Ante
1
Pharm
June-Dec
6
F3-147A (Non-HD Ante Sterile Buffer)
183981011818
Nuaire
NU-301-630
Horizontal Laminar Airflow Workstation
1
Pharm
June-Dec
7
F3-147A (Non-HD Ante Sterile Buffer)
184672022818
Nuaire
NU-301-430
Horizontal Laminar Airflow Workstation
1
Pharm
June-Dec
8
F3-147B (Non-HD Sterile Compounding)
Non-HD Sterile Compounding
Custom
Clean Room
Non-HD Sterile B
2
Pharm
June-Dec
9
FS-123 (Basement RX)
224485011824
Nuaire
NU-340-430
Horizontal Laminar Airflow Workstation
1
Pharm
June-Dec
E3-298B
147617
Baker
SG404
CII/A2
2
Pharm
June-Dec
11
E3-298C
1.71E+11
Nuaire
NU-S430-300
B2/II
2
Pharm
June-Dec
12
E3-298A (HD Sterile Ante Room)
HD Sterile Ante Room
Custom
Clean Room
HD Sterile Antero
1
Pharm
June-Dec
13
E3-298B (HD Sterile Buffer Room)
HD Sterile Buffer Room
Custom
Clean Room
HD Sterile Buffer
1
Pharm
June-Dec
14
E3-298C 298B (HD Sterile Buffer Room)
HD Sterile Buffer Room
Custom
Clean Room
HD Sterile Buffer
1
Pharm
June-Dec
15
E3-298D 298B (HD Storage)
HD Storage
Custom
Clean Room
Cleanroom
1
Pharm
June-Dec

LABS

Item Number
Room Location
Serial #/ID
Make
Model
Type/Class
Filter Count
Responding Service
Cert. Date
16
D2-214A (Biosafety Lab)
1.83E+11
Nuaire
430-600
B2/II
2
Lab
Dec
17
D2-214A (Biosafety Lab)
1.83E+11
Nuaire
NU 430-400
B2/II
2
Lab
Dec
18
D2-214A
D2-214A
CUSTOM
CER
Cleanroom
2
Lab
Dec
19
D2-214
D2-214
CUSTOM
CER
Cleanroom
1
Lab
Dec
20
D2-214A Exhaust
D2-241A Exhaust
CUSTOM
CER
Cleanroom
2
Lab
Dec
21
D2-161
Canopy Hood 2
Custom
Custom
Canopy Hood/1
0
Dental
Dec
22
D2-161
Canopy Hood 1
Custom
Custom
Canopy Hood/1
0
Dental
Dec
23
D2-161
Slot Hood 1
Custom
Custom
Slot Hood
0
Dental
Dec
24
D2-161
Slot Hood 2
Custom
Custom
Slot Hood
0
Dental
Dec
25
D2-161
Slot Hood 3
CUSTOM
Custom
Slot Hood
0
Dental
Dec
26
D2-162
Slot Hood 5
Custom
Custom
Slot Hood
0
Dental
Dec
27
D2-215
AC648LFC-49158
Air Clean Systems
AC648LFC
Clean Bench
2
HTM/BIOMED – Lab
Dec
28
D2-215
AC632TA-5888
Air Clean Systems
AC632TA
Fume Hood
0
HTM/BIOMED - Lab
Dec
29
D2-216
1.71E+11
Nuaire
NU-437-400
A2/II
2
Lab
Dec
30
D2-217
MYPCR241-657
Mystaire
MY-PCR24
Clean Bench
1
Lab
Dec
31
D2-234
1.73E+11
Nuaire
NU-437-600
A2/II
2
Lab
Dec
32
D2-238
171251325 B
LABCONCO
3955400 FUME ABSO
Fume Hood
0
HTM/BIOMED – Lab
Dec
33
D2-238
171237111315
Nuaire
nu-s435-600
B2/II
2
HTM/BIOMED – Lab
Dec
34
D2-239
1.71E+11
Nuaire
NU-437-400
A2/II
2

Dec

35
D2-162
Slot Hood 4
Custom
Custom
Slot Hood
0
Dental
Dec
36
D2-210
1.71E+11
Nuaire
Nu 437-600
A2/II
2
HTM/BIOMED - Lab
Dec
37
D2-210
1.71E+11
Nuaire
Nu 437-600
A2/II
2
HTM/BIOMED - Lab
Dec
38
D2-210
MY-PCR241-654
Mystaire
PCR 24
Clean Bench
1
HTM/BIOMED - Lab
Dec
39
D2-210
AC632LFUC-43626
AIRCLEAN SYSTEMS
AC632LFUVC
Clean Bench
1
HTM/BIOMED – Lab
Dec
40
D2-216
1.71E+11
Nuaire
NU437-400
A2/II
2
Lab
Dec
41
D2-230
1.71E+11
Nuaire
NU-813-400
Single Pass/I
1
Lab
Dec
42
D2-210
VBV60-03-02-F901-FH3
BEDCOLAB
VBV-60
Fume Hood
0
Lab
Dec
43
D2-234
VBV72-03-02-E601-FH2
BEDCOLAB
VBV-72
Fume Hood
0
Lab
Dec
44
D2-239
1.79E+11
Nuaire
NU-162-624
Fume Hood
0
Lab
Dec
D2-240
VBV60-03-02-F402-FH1
BEDCOLAB
VBV-60
Fume Hood
0
Lab
Dec
46
D2-240
171191111215
Nuaire
NU-813-400
Single Pass/I
1
Lab
Dec
47
D2-238 (Grossing Frozen Section)
DGE72CO112019
PMT Scientific
DGE-72
Grossing Hood
0
Lab
Dec
48
HS-103
AC632TA-5995
Airclean Systems
AC632TA
Fume Hood
0
HTM-BIOMED – Morgue Lab
Dec
49
HS-103
1.71E+08
Labconco Corp
6963200
Fume Hood
0
HTM-BIOMED – Morgue Lab
Dec
50
HS-103
CC200E15001
MOPEC Inc
CC200MOD
Grossing Station
0
Morgue Lab
Dec
HS-103
CCUSTE15001
MOPEC Inc
CC200MOD
Grossing Station
0
Morgue Lab
Dec
52
HS-103
CC200E15002
MOPEC Inc
CC200MOD
Grossing Station
0
Morgue Lab
Dec
53
F1-321
171233111315
Nuaire
NU-435-400
B2/II
2
Lab
Dec
54
F1-321
171231111315
Nuaire
NU-435-400
B2/II
2
Lab
Dec

RESEARCH

Item Number
Room Location
Serial #/ID
Make
Model
Type/Class
Filter Count
Responding Service
Cert. Date
55
BS-126
5013-2002
Captair
481 Smart
Single Pass/I
1
Rsch Animal
May
56
BS-147
1.73E+11
Nuaire
NU-S610-600(DUAL)
A2/II
2
Rsch Animal
May
57
B1-103C
VBR48-02-01-A301-FH6
BEDCOLAB
VBR-48
Fume Hood
0
Rsch
May
58
B1-103D
VBV60-02-01-C301-FH7
BEDCOLAB
VBV-60
Fume Hood
0
Rsch
May
59
B1-125D
VBV60-02-01-G302-FH7
BEDCOLAB
VBV-60
Fume Hood
B1-125D
VBV60-02-01-G302-FH7
May
60
B2-101D
VBV60-02-02-C203-FH7
BEDCOLAB
VBV-60
Fume Hood
0
Rsch
May
61
B2-121D
VBV60-02-02-G203-FH7
BEDCOLAB
VBV-60
Fume Hood
0
Rsch
May
62
B3-101C
VBV60-02-03-C202-FH7
BEDCOLAB
VBV-60
Fume Hood
0
Rsch
May
63
B3-121E
VBV-60-02-03-G202-FH7
BEDCOLAB
VBV-60
Fume Hood
0
Rsch
May
64
BS-124
VBV48-02-SV-E202-FH5
BEDCOLAB
VBV-48
Fume Hood
0
Rsch Animal
May
65
BS-150
16004855
TECNIPLAST
CS5 EVO PLUS
Change Station
2
Rsch Animal
May
66
BS-131
16004853
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
67
BS-132
VBV48-02-SV-G201-FH5
BEDCOLAB
VBV-48
Fume Hood
0
Rsch Animal
May
68
B1-109E
1.73E+11
Nuaire
Nu437-600
A2/II
2
Rsch
May
69
B1-109E
1.72E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
70
B1-125C
1.72E+11
Nuaire
437-400
A2/II
2
Rsch
May
71
B1-125E
1.72E+11
Nuaire
437-400
A2/II
2
Rsch
May
72
B2-101C
1.73E+11
Nuaire
NU-437-400
A2/II
2
Rsch
May
73
B2-107B
1.73E+11
Nuaire
NU-437-400
A2/II
2
Rsch
May
74
B2-107C
1.73E+11
Nuaire
Nu 437-600
A2/II
2
Rsch
May
75
BS-114
16004862
TECNIPLAST
CS5 EVO PLUS
Change Station
2
Rsch
May
76
BS-124
1.72E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
77
BS-125
16004860
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch
May
78
BS-128
16004859
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch
May
79
BS-132
1.72E+11
Nuaire
NU 437-400
A2/II
2
Rsch
May
80
BS-137
17000132
TECNIPLAST
CS5 EVO PLUS
Change Station
2
Rsch
May
81
B1-109B
1.72E+11
Nuaire
NU-437 400
A2/II
2
Rsch
May
82
B1-109B
1.72E+11
Nuaire
NU-437 400
A2/II
2
Rsch
May
83
B2-107B
1.73E+11
Nuaire
Nu437-600
A2/II
2
Rsch
May
84
B2-107C
1.72E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
85
B2-121C
1.73E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
86
B3-107B
1.72E+11
Nuaire
NU-435-600
B2/II
2
Rsch
May
87
B3-107B
1.72E+11
Nuaire
NU437-400
B2/II
2
Rsch
May
88
B3-107E
1.73E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
89
B3-107E
1.73E+11
Nuaire
NU-435-600
A2/II
2
Rsch
May
90
B3-121C
1.73E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
91
B3-121E
1.73E+11
Nuaire
NU437-400
A2/II
2
Rsch
May
92
BS-129A
16004604
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
93
BS-113A
17001400
TECNIPLAST
9DS724IK
Single Pass/1
2
Rsch Animal
May
94
BS-126
902056
TECNIPLAST
9DS364P
Single Pass/1
1
Rsch Animal
May
95
BS-126A
2.02E+11
Nuaire
NU-640-600
A2/II
2
Rsch Animal
May
96
BS-129
16004864
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
97
BS-129A
16004863
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
BS-134
16004606
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
99
BS-135
16004931
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
100
BS-122
16004855
TECNIPLAST
9CS5ET4TYAG
Change Station
2
Rsch Animal
May
101
B2-121E
1.72E+11
Nuaire
NU-437-400
A2/II
2
Rsch
May
102
BS-126
459
TECNIPLAST
BH-02A
Change Station
2
Rsch Animal
May
103
B1-121
VBV60-02-01-6302-FHM
BEDCOLAB
VBV-60
Fume Hood
Rsch
May
104
BS-131A
ESCO
Clas2 type A2
Rsch
May
105
BS-129A
ac632827
airclean
300control
Fume hood
Rsch
May
BS-123
16004862
TECNIPLAST
CS5 EVO PLUS
Change Station
2
Rsch
May
107
CS-231/HAZ Waste CAP
Chemical Storage/CS-231
CUSTOM
NA
Cleanroom
2
Rsch
May

2.3 Vendor to provide and changeout all filters for items listed above as required per manufacturer recommendations and end user preferences. Vendor is expected to have filters on hand for changing at each visit as needed. Starting within 3 months of award, vendor to change filters on Fume Absorber Cabinets in Laboratory area every 6 months due to odors.

2.4 The annual/semi-annual certifications shall be performed in sufficient time to ensure that none shall lapse. Contractor will submit a schedule that builds in time for repairs should that be necessary to ensure certifications never lapse. Contractor will work directly with POC to schedule all testing and certification based on areas and needs.

2.5 The Contractor shall provide certification reports upon completion of semi-annual and annual testing/certification. Report will include training/certifications of technicians performing the work and calibration certificates of the equipment used during the testing/certification.

2.6 Contractor will immediately notify POC in writing (letter) or by email, in the event any/all regulatory guidance governing the certifications of any subject equipment changes. Written advisement will include any issues which will impact testing/certification. Contractor will also advise Rocky Mountain Regional VA Medical Center of recommendations to resolve any issues related to the regulatory changes.

2.7 When testing/servicing/certifying equipment, the Contractor will provide on-site consultation to RMRVAMC VA staff (answer questions, make recommendations to maintain at optimum level) that use the Pharmacy cleanroom, the biosafety cabinets, and the laminar flow workstations. Technicians knowledgeable about certification requirements will converse with staff/POC to inform them of recommended adjustments to behaviors used in daily use, cleaning of area, maintenance of equipment, and any structural/HVAC/electrical/engineering issues related to the equipment or rooms encompassing equipment. Technicians will in-brief at each visit and provide an out-brief to POC if any issues/questions arise during inspection.

2.8 Contractor shall have the capability to respond within 24 hours of contact for emergency repair. Contractor shall furnish the POC with written estimate of cost to make necessary repairs and receive Contracting Officer (CO) approval prior to initiating repairs.

2.9 All the following information should be included in the report for clean room certification. Room number and/or location, Room type (e.g., oncology prep room), Date of testing, Date of next required certification, Standards used to test room, Room sketch, Total room area and volume, Room humidity and temperature, Air changes per hour, Pressure differential, non-viable particle counts, and viable particle count analysis. Pass/Fail notifications should be included on a per test basis where applicable.

3. CERTIFICATION AND TESTING REQUIREMENTS

3.1 Biological Safety Cabinets: The Pharmacy biosafety cabinet shall be certified semi-annually. All other Biosafety cabinets will be certified annually. Certification shall consist of the following:
3.1.1 Down flow velocity test
3.1.2 Inflow velocity test

3.1.3 Airflow smoke pattern test

3.1.4 HEPA filter leak test
3.1.5 Alarm function test
3.1.6 Blower interlock test (Class II, type B cabinets)
3.1.7 Electrical leakage on the main cabinet (those that aren’t UL listed)
3.1.8 Ground Fault Circuit Interrupter (GFCI) outlet trip test.
3.1.9 A visual inspection to identify defects, damage, misuse, or missing parts.
3.1.10 Documentation of the certification and inspection results

3.1.11 A decal or label affixed to the cabinet in a visible location that indicates the results and date of the certification

3.1.12 Posting an “Out of Service” sign on cabinets that fail certification.
3.1.13 Notifying the cabinet user and the POC of cabinets that fail certification.
3.2Laminar Flow Units: All units will be certified annually. Certification shall consist of the following:
3.2.1 Measurement of sash face velocity according to the current version of ASHRAE 110.
3.2.2 Comparison of the sash face velocity to the current ACGIH recommendation.
3.2.3 Airflow smoke pattern test.
3.2.4 GFCI outlet trip test.
3.2.5 A visual inspection to identify defects, damage, misuse, or missing parts.

3.2.6 Documentation of the certification and inspection results (e.g., a decal or label affixed in a visible location that indicates the sash certification height, the face velocity, and the date of certification).

3.2.7 Posting an “Out of Service” sign on lab fume hoods that fail certification.
3.2.8 Notifying the lab fume hood user and the POC of lab fume hoods that fail certification.

3.3 Pharmacy Testing and Certification: Testing and certification (under CAG-003-2006-11 and to USP 797 Pharmaceutical Compounding – Sterile Preparations and USP 800 Hazardous Drugs—Handling in Healthcare Settings Standards.) of the Pharmacy: Ante Room, Hazardous Buffer Room and Non-Hazardous Buffer Room as well as viable air and surface sampling for Fungus and bacteria will be semi-annually. Certification and testing shall consist of the following:

3.3.1 Test and validate the number of air changes per hour (ACPH) through the rooms Heating Ventilation and Air Conditioning (HVAC) equipment and Primary Engineering Control(s) (PECs).

…....... ACPH from HVAC, contributed from PEC(s), and total ACPH must be documented on the certification report
3.3.2 Pressure Requirements: The contractor shall include in their report differential pressurereading from each buffer/ante room to all surrounding areas

3.3.3 Non-viable Particle Testing: The contractor shall perform environmental nonviable particle testing semiannually

3.3.4 Test and validate that the hood and room exhaust provide a unidirectional/laminar flow of air.

3.3.5 Inspect HVAC filter assembly for air bypass issues.
3.3.6 Validate accurate operation and readings of the existing air balancing monitors.

3.3.7 Take viable air samples for fungus and bacteria (1 location in each PEC: LFWs, BSC, Pass Thru, and 1 location in the room Ante, and 2 locations Chemo and IV Room. Colony forming units (CFU) results from the cultures shall be calculated in cfu per cubic meter (m3) of air.

3.3.8 Take viable surface samples for fungus and bacteria (1 each in laminar flow units, BSC, Pass Thru, Ante, Chemo and IV Room.

3.3.9 Specifics from VHA Directive 1108.12:

(2) Ensuring that PECs and SECs are installed and maintained in compliance with USP compounding chapters and VA design standards including third party testing and certification. NOTE: VA uses the CETA CAGs to define certification procedures for assessing if the Primary and Secondary Engineering Controls are operating as designed to maintain a sterile environment for the preparation of CSPs.

(3) Ensuring all vendors conducting primary and secondary engineering control certifications:

(a) Employ at least one CETA National Board Testing (CNBT) Registered Certified Professional (RCP) for Sterile Compounding Facility (SCF) individual on staff who will review and sign the final certification report.

(b) Have required CETA competencies and training related to the certification of primary and secondary engineering controls. NOTE: it is preferred that the on-site certification individuals have received NSF accreditation for the field certification of Class II Biosafety Cabinets and are accredited through CNBT as a registered certification professional in the sterile compounding facility (RCP-SCF).

“Certification procedures defined in applicable CETA Application Guides must be performed by a CETA National Board Testing (CNBT) Registered Certified Professional (RCP) for Sterile Compounding Facility (SCF) individual or a vendor that employs at least one of these individuals initially and no less than every 6 months. Areas additionally, must be recertified if there are any changes to the area such as redesign, construction, replacement or relocation of any PEC, or alteration in the configuration of the room that could affect airflow or air quality.”

“Contracts with CETA certified individuals or vendors must require that viable and non-viable testing results be provided to the Chief of Pharmacy Service and other designated VA medical facility staff (as indicated by the medical facility) no later than 2 weeks after the testing is performed. Certification must also include video of the airflow smoke pattern test documenting unidirectional flow at critical sites in the PEC.”

4. PERSONNEL ACCREDITATION REQUIREMENTS

4.1 Contractor services personnel must be NSF and CETA accredited and submit their NSF and CETA accreditation certificates with their bid proposal.

5. PERIOD OF PERFORMANCE AND WORK HOURS

5.1 The period of performance shall be for one base year and four one-year options periods.

5.2 The Contractor (or Representative) shall contact the POC to schedule work and prior to the beginning of work. Contractor to notify POC of upcoming test 5 business days in advance.

5.3 Services are to be performed during our business hours between 7:30 a.m. and 4:00 p.m. central time, excluding federal holidays. Because of the workload of the pharmacy during business hours, the contractor may need to work after 4:00 p.m. to accommodate the compounding schedule at the pharmacy. Contractors that are willing to perform after-hours work should include this information in their bid documentation. If a contractor is willing to perform services after 4:00 p.m. this service must be included within the bid pricing as no extra charge will be allowed. The ability to perform work after hours is not required; however, preference will be given to contractors that offer flexible work hours.

6. INSPECTION AND ACCEPTANCE

6.1 The Contractor shall conduct a joint inspection with the POC upon certification and testing of equipment.

7. DELIVERABLES

7.1 After work is completed, the contractor is to submit in writing, a complete report of services performed for each item of equipment and must include a listing of replacement parts, when applicable. Within one week of obtaining sampling results, the vendor will electronically report ventilation and sampling data semiannually to RMRVAMC Facilities Management has a means of evaluating the overall control of the compounding environment. The report should have guidance on interpreting results, possible contamination pathways and proper corrective actions to remediate contamination. All reports shall be provided to POC within 14 days of work being completed.

7.2 The contractor shall supply every unit that passes required certification specifications with a certification sticker.