Questions and Answers for Sound Masking System for SLC.docx

DOCX document 17 KB Posted

Attached to
5835--36C25923Q0845| Sound Masking System for Salt Lake City VA Health Care System
Solicitation number
36C25923Q0845
Issued by

About this file

This document contains questions and answers regarding a sound masking system project for the Salt Lake City VA Health Care System. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking to install a sound masking system in three areas, as delineated on the attached drawings which provide the floor plans, ceiling heights and compositions. The questions ask for clarification on the project space and ceiling details in order to provide accurate pricing. No further details are provided on products or services required, response dates, or other salient contracting information.

View the file

Other files

File Type Posted
Drawing 3.pdf PDF
36C25923Q0845 0002.docx DOCX document
Drawing 2.pdf PDF
Drawing 1.pdf PDF
36C25923Q0845 0001.docx DOCX document
36C25923Q0845.docx DOCX document
Combine Synopsis - Sound Masking System for SLC.docx DOCX document
Statement of Work.docx DOCX document
Attachment- VAAR Clause 852.219-76 VA Notice of LOS-Certificate of Compliance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sound Masking System for Salt Lake City VA Health Care Sytem

QUESTIONS (Q) AND ANSWERS (A):

Q1. “Can you please have the EU provide CAD files of the space so we can build a system or at least a PDF printout of the space?”

A1. Please see attachments Drawing 1, 2, and 3.

Q2. “..need a floor plan with the 3 sound masking areas designated. The floor plan should be a Reflective Ceiling Plan (RCP) or if not, please designate areas where you want the sound masking and also designate height and composition of ceiling.”

A2. Please see attachments Drawing 1, 2, and 3.

Q3. “In order to provide the best pricing can you provide us with the floor plan for the physical location and cabling, as well as ceiling height and type.”

A3. Please see attachments Drawing 1, 2, and 3.

File details come from the government source that posted it. Updated .