36C25923Q0580 0001.docx

DOCX document 15 KB Posted

Attached to
H999--ELEVATOR INSPECTIONS - 554 Federal contract opportunity
Solicitation number
36C25923Q0580
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to H999--ELEVATOR INSPECTIONS - 554, newest first.
File Type Posted
36C25923Q0580.docx DOCX document
Department of Labor Wage Determination 2015-5419 - REV 23 - 12-27-2022 - Denver CO.txt TXT text file
RMR VAMC - ELEVATOR LISTING.docx DOCX document
VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
ELEVATOR INSPECTIONS - 554

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
80111
SOLICITATION NUMBER*
36C25923Q0580
RESPONSE DATE/TIME/ZONE
06-16-2023 16:00 MOUNTAIN TIME, DENVER, USA
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
H999
NAICS CODE*
541350
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111

POINT OF CONTACT*

Contract Specialist Noaa Lanotte Noaa.Lanotte@va.gov 303-712-5794

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Eastern Colorado Healthcare System

Rocky Mountain Regional VAMC

1700 North Wheeling Street

Aurora CO

POSTAL CODE
80045
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

Amendment 36C25923Q0580 0001 is to notify all potential offerors of the Questions and Answers

Question: Section 2.3 – Requirements - This section indicates that "the contractor shall provide documentation to the Point of Contact (POC) satisfactory completion of all inspections within 5 business days of inspection." Does this mean reports must be submitted within 5 business days, or is there another type of satisfactory documentation?

Answer: 5 days with discrepancies, 20 days without issues Question: Section 3.0 – Inspections - This section states: "The Contractor shall execute all inspections with the assistance of an accompanying third-party elevator service and maintenance contractor". Can you confirm if this bid requires only third-party witnessing services, or if it requires elevator testing?

Answer: Witness only Question: Section 4.0 – Contract Submittals - Do the SSSP and PPE need to be submitted before or after award?

Answer: Before the Award to be qualified Question: Section (g) - It is stated that the technical proposal shall "describe the means and methods of successfully performing all work detailed in the SOW", however, there is no detailed SOW provided, besides that provided in section "2.0 General" on page 5. Will a more detailed SOW be provided before the submission due date?

Answer: No, please follow industry standards as detailed in the SOW.

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

File details come from the government source that posted it. Updated .