36C25923Q0110.docx
DOCX document 165 KB Posted
- Attached to
- J065--Biological Safety Cabinets Inspect/Certification Laboratory Hoods & Pharmacy Clean/Ante Room
- Solicitation number
- 36C25923Q0110
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25923Q0110 0001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25923Q0110
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE
DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a.
PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE
ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26.
TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212
-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNAT
URE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C25923Q0110 11-29-2022 Mitchael Purdom 918-577-4435 12-06-2022 10:00
CST
36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401 X X 811210 $8 Million N/A X Department of Veterans Affairs Oklahoma City VA Health Care System 921 N.E. 13th St.
Oklahoma City OK 73104 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111
Department of Veterans Affairs Financial Service Center PO Box 149971 Austin TX 78714-9971 See CONTINUATION Page Inspection & Certification of Biological Safety Cabinets, Laboratory Hoods & Pharmacy Clean/Ante Rooms, and Specialized Room Ventilation Systems.
Respond to Solicitation: Email Jeffery.Eller@va.gov by date and time in block 8.
Evaluation of Solicitation:
1. Price.
2. Certification/License (See Special Standards of Responsibility, 52.212-2, page 73).
3. As per VAAR 852.219-77 return "Certificate of Compliance for Services" (page 45).
See CONTINUATION Page X X Mitchael Purdom
VA-VHA-RPOW-2022-249455
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 4 |
| B.1 CONTRACT ADMINISTRATION DATA | 4 |
| B.2 PERFORMANCE WORK STATEMENT | 5 |
| B.3 PRICE/COST SCHEDULE | 10 |
| ITEM INFORMATION | 10 |
| B.4 CONTRACTOR PAYMENT REQUESTS | 31 |
| B.5 COVID-19 HEALTH REQUIREMENTS | 32 |
| B.6 VHA SUPPLEMENTAL CONTRCT REQUIREMENTS FOR COMBATTING COVID-19 | 32 |
| SECTION C - CONTRACT CLAUSES | 35 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 35 |
| C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 41 |
| C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 41 |
| C.4 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020) | 41 |
| C.5 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 43 |
| C.6 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 44 |
| C.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 45 |
| C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 45 |
| C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION) | 46 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 54 |
| D.1 WAGE DETERMINATION (WD) | 54 |
| SECTION E - SOLICITATION PROVISIONS | 65 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 65 |
| E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 69 |
| E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 72 |
| E.4 52.212-2 EVALUATION – COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 72 |
| E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022) (JUL 2020) (DEVIATION) | 74 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] following satisfactory services. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 PERFORMANCE WORK STATEMENT
Performance Work Statement
Inspection & Certification of Biological Safety Cabinets, Laboratory Hoods & Pharmacy Clean/Ante Rooms and Specialized Room Ventilation Systems Oklahoma City VA Medical Center Oklahoma City, Oklahoma
1. PURPOSE
1.1 This requirement is for procuring services for testing and certification of specialized room ventilation systems, chemical hoods, Laminar Flow Workstations (LFWs) and Biological Safety Cabinets (BSCs) to provide a safe environment for laboratory personnel at multiple locations. Contractor shall test and certify laboratory equipment, sterile processing areas, and pharmacy clean/ante rooms.
2. SCOPE
2.1 Contractor shall furnish service as specified below to ensure that the equipment functions in accordance with:
NCI Specification “General Purpose, Clean Air, Biological Safety Cabinet, revised August 19, 1975”, NIH specification NIH-03-11ZC dated Sept 17, 1974;
National Sanitation Foundation-Class II, (Laminar Flow) Biohazard Cabinetry-Standard Number 49 [NSF 49];
Federal Standard No. 209E-April 24, 1973, “Clean Room and Work Station Requirements, Controlled Environment”;
SAMA Standard LF10-1980 Laboratory Fume Hoods and USP 797/USP 795 USP General Chapter <800> Hazardous Drugs-Handling in Healthcare Settings 2017
CAG-002-2006
CAG-003-2006
CAG-007-2010
CAG-008-2010
IEST RP-CC-034
CETA Compounding Testing Guide 2006 FDA Insanitary conditions for Compounding CETA Viable Sampling SOP CETA Certification Guide May 2015
2.2 Furnish all labor, equipment, tools, materials, and travel necessary to test, certify and measure Government – owned Biological Safety Cabinets (BSCs), Laminar Flow Work Stations (LFWs), and Pharmacy clean rooms
2.3 Equipment and locations are identified on the Schedule of Items.
2.4 The annual/semi-annual certifications shall be performed in sufficient time to ensure that none shall lapse (contractor will schedule testing that builds in time for repairs should that be necessary to insure certifications never lapse). With two lab hoods in Chemo and two hoods in IV mixing areas. Lab hoods are to be staggered for certification with two hoods certified in the months of December/June and the other two hoods certified during the months of March and September each year. Research provides backup bariatric hoods for mixing chemo and IV’s and these hoods are certified during the months of March/September.
2.5 The Contractor shall provide certification reports upon completion of semi-annual and annual testing/certification. Report will include training/certifications of technicians performing the work and calibration certificates of the equipment used during the testing/certification.
2.6 Contractor will immediately notify COR in writing (letter) or by email, in the event any/all regulatory guidance governing the certifications of any subject equipment changes. Written advisement will include any issues which will impact testing/certification. Contractor will also advise Oklahoma City VA Medical Center of recommendations to resolve any issues related to the regulatory changes.
2.7 When testing/servicing/certifying equipment, the Contractor will provide on-site consultation to Oklahoma City VA staff (answer questions, make recommendations to maintain at optimum level) that use the Pharmacy cleanroom, the biosafety cabinets, and the laminar flow workstations. Technicians knowledgeable about certification requirements will converse with staff/COR to inform them of recommended adjustments to behaviors used in daily use, cleaning of area, maintenance of equipment, and any structural/HVAC/electrical/engineering issues related to the equipment or rooms encompassing equipment. Technicians will brief COR of any issues/questions raised by staff upon checking out post-certification.
2.8 Contractor shall have the capability to respond within 24 hours of contact for emergency repair. Contractor shall furnish the Contracting Officer Representative (COR) with written estimate of cost to make necessary repairs and receive COR approval prior to initiating repairs.
2.9 All of the following information should be included in the report for clean room certification. Room number and/or location, Room type (e.g. oncology prep room), Date of testing, Date of next required certification, Standards used to test room, Room sketch, Total room area and volume, Room humidity and temperature, Air changes per hour, Pressure differential, Non-viable particle counts, and viable particle count analysis.
Pass/Fail notifications should be included on a per test basis where applicable.
3. CERTIFICATION AND TESTING REQUIREMENTS
3.1. Biological Safety Cabinets (BSC): The Pharmacy biosafety cabinet shall be certified semi-annually. All other Biosafety cabinets will be certified annually. Certification shall consist of the following:
Down flow velocity test Inflow velocity test Airflow smoke pattern test (videotaping must be included for Pharmacy hoods only) HEPA filter leak test Alarm function test Blower interlock test (Class II, type B cabinets) Electrical leakage on the main cabinet (those that aren’t UL listed) Ground Fault Circuit Interrupter (GFCI) outlet trip test.
A visual inspection to identify defects, damage, misuse or missing parts Documentation of the certification and inspection results A decal or label affixed to the cabinet in a visible location that indicates the results and date of the certification Posting an “Out of Service” sign on cabinets that fail certification;
Notifying the cabinet user and the COR of cabinets that fail certification.
3.2 Laminar Airflow Workstations (LAFW):
All LAFWs will be certified annually.
Certification shall consist of the following:
Measurement of sash face velocity according to the current version of ASHRAE 110.
Comparison of the sash face velocity to the current ACGIH recommendation.
Airflow smoke pattern test.
GFCI outlet trip test.
A visual inspection to identify defects, damage, misuse or missing parts;
Documentation of the certification and inspection results (e.g., a decal or label affixed in a visible location that indicates the sash certification height, the face velocity and the date of certification).
Posting an “Out of Service” sign on lab fume hoods that fail certification.
Notifying the lab fume hood user and the COR of lab fume hoods that fail certification.
3.3 Pharmacy Cleanroom(s) Testing and Certification:
Testing and certification (under CAG-003-2006-11 and to USP797 Standards and 800 Hazardous Drugs—Handling in Healthcare Settings.) of the Pharmacy: Ante Room, Hazardous Buffer (IV) Room and Non-Hazardous Buffer (Chemo) Room as well as viable air and surface sampling for mold and bacteria will be semi-annually. Certification and testing shall consist of the following:
Test and validate the number of air changes per hour (ACH) through the rooms Heating Ventilation and Air Conditioning (HVAC) equipment and exhaust hood.
Pressure Requirements: The contractor shall include in their report differential pressure reading from each buffer/ante room to all surrounding areas
Non-viable Particle Testing: The contractor shall perform environmental nonviable particle testing semiannually Test and validate that the hood and room exhaust provide a unidirectional/laminar flow of air.
Inspect HVAC filter assembly for air bypass issues.
Test and calibrate the existing air balancing monitors (Chemo and Ante Rooms).
Take viable air samples for mold and bacteria (1 location in each PEC: LFWs, BSC, Pass Thru, and 1 location in the room Ante, and 2 locations Chemo and IV Room. Colony forming units (CFU) results from the cultures shall be calculated in cfu per cubic meter (m3) of air.
Take viable surface samples for bacteria (1 each in LFWs, BSC, Pass Thru, Ante, Chemo and IV Room.
4. PERSONNEL ACCREDITATION REQUIREMENTS
4.1 Contractor services personnel must be NSF accredited and submit their NSF accreditation certificates with their bid proposal.
4.2 Technician performing on-site testing for Pharmacy must be CETA certified.
5. PERIOD OF PERFORMANCE AND WORK HOURS
5.1 The period of performance shall be for one base year with four possible one-year option periods (as outlined with the schedule / line items).
5.2 The Contractor (or Representative) shall contact the COR, Contracting Officer’s Representative, to schedule work and prior to the beginning of work.
5.3 Services are to be performed during our business hours between 7:30 a.m. and 4:00 p.m.
central time, excluding federal holidays. Because of the workload of the pharmacy during business hours, the contractor may need to work after 4:00 p.m. in order to accommodate the compounding schedule at the pharmacy. Contractors that are willing to perform after-hours work should include this information in their bid documentation. If a contractor is willing to perform services after 4:00 p.m. this service must be included within the bid pricing as no extra charge will be allowed. The ability to perform work after hours is not required;
however, preference will be given to contractors that offer flexible work hours.
6. INSPECTION AND ACCEPTANCE:
6.1 The Contractor shall conduct a joint inspection with the COR upon certification and testing of equipment.
7. DELIVERABLES
7.1 After work is completed, the contractor is to submit in writing, a complete report of services performed for each item of equipment and must include a listing of replacement parts, when applicable. Within one week of obtaining sampling results, the vendor will electronically report ventilation and sampling data semiannually to Oklahoma City VA Medical Center Safety Management has a means of evaluating the overall control of the compounding environment. The report should have guidance on interpreting results, possible contamination pathways and proper corrective actions to remediate contamination.
7.2 The contractor shall supply every unit that passes required certification specifications with a certification sticker.
8. TRAINING
8.1 No training is required from the contractor.
9. Transportation Visits = 6 visits a year (4 required and 2 additional trips for troubleshooting/retesting etc.)
10. Facility Information Security Officer (FISO) SECURITY LANGUAGE:
10.1 GENERAL
Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
Pharmacy Testing BioSafety/Laminair hood/cabinet testing/inspection/certification
| BSC Cabinets | 5 BSC cabinets | 4 rooms | Semi-annual testing | ||
| Laminar hoods | 4 hoods | 2 rooms | Semi-annual testing | ||
| Research GR-102 | 1 hood | 1 room | Semi-annual testing |
Path lab Testing
| 4F115 | Microbiology | Nuaire | 1 hood | annual testing | |||
| 4F115C1 | Microbiology | Nuaire | 1 hood | annual testing | |||
| 4F115 B | Microbiology | Nuaire | 1 hood | annual testing | |||
| 4F133 | Cytology | Nuaire | 1 hood | annual testing | |||
| 4F137 | Molecular | Nuaire | 1 hood | annual testing | |||
| 4F105 | Hematology | Nuaire | 2 hoods annual testing |
Sputum Booth 1A105J Aero med 1 booth annual testing
Isolation Rooms (Ceiling HEPA filter)
5F116 annual inspection/testing 5F144 annual inspection/testing BF132 annual inspection/testing BF133 annual inspection/testing
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Microbiology Lab), MFG/Model NUAIRE Lab Guard ES, SN# 159780102513, Located in Room 4F115, Annual Certification (to be completed in December), in accordance with the PWS.
Contract Period: Base POP Begin: 12-15-2022 POP End: 11-30-2023 PRINCIPAL NAICS CODE: 811210 - Electronic and Precision Equipment Repair and Maintenance PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (BSL3 Lab), MFG/Model NUAIRE Lab Guard ES, Located in Room 4F115-C1 Annual Certification (to be completed in December), in accordance with the PWS
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Cytology), MFG/Model NUAIRE Lab Guard ES, SN# 159781102513, Located in Room 4F133, Annual Certification (to be completed in March), in accordance with the PWS.
Contract Period: Base POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Molecular), MFG/Model NUAIRE Lab Guard ES, SN# 159779102513, Located in Room 4F137, Annual Certification (to be completed in December), in accordance with the PWS.
Contract Period: Base POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Lab), MFG/Model NUAIRE Lab Guard ES, SN# 164095070314 Located in Room 4F105 Annual Certification (to be completed in June & March), in accordance with the PWS.
Contract Period: Base POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Pharmacy Chemo (Compounding) Room, Laminar Air Flow/Baker Edgard, Location: GA142A1, SN#120719/91623, Semi-Annual Certifications (1 hood tested December & June 1 / hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year).
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Hoods and Room, Baker SterilchemGard III Adavance, Location: GA142B1, SN# 92560/92561, Semi-Annual Certifications (1 hood tested December & June / 1 hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year).
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Ante Room, Location: GA142A, (to be completed December & June), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy Chemo Ante Room, Location GA142B, (to be completed December & June), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Reasearch Pharmacy Chemo/IV Hoods, Location: GR-102, Baker Chemoshield, SN# 118544, (to be completed March & September), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Sputum Induction Chamber, Location: 1A105J, Aeromed Sputum Induction Booth, SN# 18099, (to be completed December), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-116, Annual, (to be completed December), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-144, Annual, (to be completed December), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-132/133, Annual, (to be completed December), in accordance with the PWS.
POP Begin: 12-15-2022 POP End: 11-30-2023
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Microbiology Lab), MFG/Model NUAIRE Lab Guard ES, SN# 159780102513, Located in Room 4F115, Annual Certification (to be completed in December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24) Contract Period: Option 1 POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (BSL3 Lab), MFG/Model NUAIRE Lab Guard ES, Located in Room 4F115-C1 Annual Certification (to be completed in December), in accordance with the PWS (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Cytology), MFG/Model NUAIRE Lab Guard ES, SN# 159781102513, Located in Room 4F133, Annual Certification (to be completed in March), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24) Contract Period: Option 1 POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Molecular), MFG/Model NUAIRE Lab Guard ES, SN# 159779102513, Located in Room 4F137, Annual Certification (to be completed in December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24) Contract Period: Option 1 POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Lab), MFG/Model NUAIRE Lab Guard ES, SN# 164095070314 Located in Room 4F105 Annual Certification (to be completed in June & March), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24) Contract Period: Option 1 POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Pharmacy Chemo (Compounding) Room, Laminar Air Flow/Baker Edgard, Location: GA142A1, SN#120719/91623, Semi-Annual Certifications (1 hood tested December & June 1 / hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Hoods and Room, Baker SterilchemGard III Adavance, Location: GA142B1, SN# 92560/92561, Semi-Annual Certifications (1 hood tested December & June / 1 hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Ante Room, Location: GA142A, (to be completed December & June), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy Chemo Ante Room, Location GA142B, (to be completed December & June), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Reasearch Pharmacy Chemo/IV Hoods, Location: GR-102, Baker Chemoshield, SN# 118544, (to be completed March & September), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Sputum Induction Chamber, Location: 1A105J, Aeromed Sputum Induction Booth, SN# 18099, (to be completed December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-116, Annual, (to be completed December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-144, Annual, (to be completed December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-132/133, Annual, (to be completed December), in accordance with the PWS. (OY 1 12/01/23 - 11/30/24)
POP Begin: 12-01-2023 POP End: 11-30-2024
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Microbiology Lab), MFG/Model NUAIRE Lab Guard ES, SN# 159780102513, Located in Room 4F115, Annual Certification (to be completed in December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25) Contract Period: Option 2 POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (BSL3 Lab), MFG/Model NUAIRE Lab Guard ES, Located in Room 4F115-C1 Annual Certification (to be completed in December), in accordance with the PWS (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-08-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Cytology), MFG/Model NUAIRE Lab Guard ES, SN# 159781102513, Located in Room 4F133, Annual Certification (to be completed in March), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25) Contract Period: Option 2 POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Molecular), MFG/Model NUAIRE Lab Guard ES, SN# 159779102513, Located in Room 4F137, Annual Certification (to be completed in December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25) Contract Period: Option 2 POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Lab), MFG/Model NUAIRE Lab Guard ES, SN# 164095070314 Located in Room 4F105 Annual Certification (to be completed in June & March), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25) Contract Period: Option 2 POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Pharmacy Chemo (Compounding) Room, Laminar Air Flow/Baker Edgard, Location: GA142A1, SN#120719/91623, Semi-Annual Certifications (1 hood tested December & June 1 / hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Hoods and Room, Baker SterilchemGard III Adavance, Location: GA142B1, SN# 92560/92561, Semi-Annual Certifications (1 hood tested December & June / 1 hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Ante Room, Location: GA142A, (to be completed December & June), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy Chemo Ante Room, Location GA142B, (to be completed December & June), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Reasearch Pharmacy Chemo/IV Hoods, Location: GR-102, Baker Chemoshield, SN# 118544, (to be completed March & September), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Sputum Induction Chamber, Location: 1A105J, Aeromed Sputum Induction Booth, SN# 18099, (to be completed December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-116, Annual, (to be completed December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-144, Annual, (to be completed December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-132/133, Annual, (to be completed December), in accordance with the PWS. (OY 2 12/01/24 - 11/30/25)
POP Begin: 12-01-2024 POP End: 11-30-2025
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Microbiology Lab), MFG/Model NUAIRE Lab Guard ES, SN# 159780102513, Located in Room 4F115, Annual Certification (to be completed in December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26) Contract Period: Option 3 POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (BSL3 Lab), MFG/Model NUAIRE Lab Guard ES, Located in Room 4F115-C1 Annual Certification (to be completed in December), in accordance with the PWS (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Cytology), MFG/Model NUAIRE Lab Guard ES, SN# 159781102513, Located in Room 4F133, Annual Certification (to be completed in March), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26) Contract Period: Option 3 POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Molecular), MFG/Model NUAIRE Lab Guard ES, SN# 159779102513, Located in Room 4F137, Annual Certification (to be completed in December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26) Contract Period: Option 3 POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Lab), MFG/Model NUAIRE Lab Guard ES, SN# 164095070314 Located in Room 4F105 Annual Certification (to be completed in June & March), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26) Contract Period: Option 3 POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Pharmacy Chemo (Compounding) Room, Laminar Air Flow/Baker Edgard, Location: GA142A1, SN#120719/91623, Semi-Annual Certifications (1 hood tested December & June 1 / hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Hoods and Room, Baker SterilchemGard III Adavance, Location: GA142B1, SN# 92560/92561, Semi-Annual Certifications (1 hood tested December & June / 1 hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Ante Room, Location: GA142A, (to be completed December & June), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy Chemo Ante Room, Location GA142B, (to be completed December & June), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Reasearch Pharmacy Chemo/IV Hoods, Location: GR-102, Baker Chemoshield, SN# 118544, (to be completed March & September), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Sputum Induction Chamber, Location: 1A105J, Aeromed Sputum Induction Booth, SN# 18099, (to be completed December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-116, Annual, (to be completed December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-144, Annual, (to be completed December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-132/133, Annual, (to be completed December), in accordance with the PWS. (OY 3 12/01/25 - 11/30/26)
POP Begin: 12-01-2025 POP End: 11-30-2026
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Microbiology Lab), MFG/Model NUAIRE Lab Guard ES, SN# 159780102513, Located in Room 4F115, Annual Certification (to be completed in December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27) Contract Period: Option 4 POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (BSL3 Lab), MFG/Model NUAIRE Lab Guard ES, Located in Room 4F115-C1 Annual Certification (to be completed in December), in accordance with the PWS (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Cytology), MFG/Model NUAIRE Lab Guard ES, SN# 159781102513, Located in Room 4F133, Annual Certification (to be completed in March), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27) Contract Period: Option 4 POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Molecular), MFG/Model NUAIRE Lab Guard ES, SN# 159779102513, Located in Room 4F137, Annual Certification (to be completed in December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27) Contract Period: Option 4 POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Biosafety Cabinet (Lab), MFG/Model NUAIRE Lab Guard ES, SN# 164095070314 Located in Room 4F105 Annual Certification (to be completed in June & March), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27) Contract Period: Option 4 POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Hood, Pharmacy Chemo (Compounding) Room, Laminar Air Flow/Baker Edgard, Location: GA142A1, SN#120719/91623, Semi-Annual Certifications (1 hood tested December & June 1 / hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 2.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Hoods and Room, Baker SterilchemGard III Adavance, Location: GA142B1, SN# 92560/92561, Semi-Annual Certifications (1 hood tested December & June / 1 hood tested March & September), in accordance with the PWS. (2 Hoods to be certified twice a year). (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy IV Ante Room, Location: GA142A, (to be completed December & June), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Pharmacy Chemo Ante Room, Location GA142B, (to be completed December & June), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Reasearch Pharmacy Chemo/IV Hoods, Location: GR-102, Baker Chemoshield, SN# 118544, (to be completed March & September), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Sputum Induction Chamber, Location: 1A105J, Aeromed Sputum Induction Booth, SN# 18099, (to be completed December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-116, Annual, (to be completed December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-144, Annual, (to be completed December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| 1.00 |
| EA |
| __________________ |
| __________________ |
Filter, Isolation Room (HEPA), Located in Room 5F-132/133, Annual, (to be completed December), in accordance with the PWS. (OY 4 12/01/26 - 11/30/27)
POP Begin: 12-01-2026 POP End: 11-30-2027
PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
| GRAND TOTAL |
| __________________ |
B.4 CONTRACTOR PAYMENT REQUESTS
Contractor e-Invoice Set-Up Information: Please contact Tungsten at the phone number or email address listed below to begin submitting your electronic invoices to the VA Financial Services Center for payment processing, free of charge. If you have question about the e-invoicing program or Tungsten, please contact the FSC at the phone number or email address listed below:
· Access the web site for more invoicing instructions: https://www.fsc.va.gov/einvoice.asp
· Tungsten e-Invoice Setup Information: 1-877-489-6135
· Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com
· FSC e-Invoice Contact Information: 1-877-353-9791
· FSC e-invoice email: vafsccshd@va.gov Payment requests may be impacted if contractor fails to maintain SAM registration, has legally changed its business name or "doing business as" name (whichever is shown on the contract), or has transferred the assets used in performing the contract. Refer to FAR clause 52.204-13.
**Vendor must remain "Active" in SAMs for entire contract term**
B.5 COVID-19 HEALTH REQUIREMENTS
Employee Physical Health: Contractor's employees are expected to be in good physical health and able to work in patient care areas without risk to the patients. No personnel shall be assigned to this contract who are not in good physical health or pose a risk to patients. Contractor's personnel who acquire a communicable illness shall not perform service under the contract and shall be free of illness before returning to work. All employees will be screened daily upon arriving on the VA Medical Center property, any contract worker complaining of or showing symptoms will be sent away and must quarantine for 14 days (unless they provide a Doctor’s note stating they are able to work and are not contagious).
If a contractor refuses screening, they can be denied access to the facility. 38 C.F.R. § 1.218(a)(1) vests the Secretary or his designee with authority to close facilities or portions of facilities that are under the charge and control of VA to the public. This includes the authority to prohibit contractors from entering VA facilities, if they refuse to undergo screening measures. Additionally, FAR 52.212-4(q) requires contractors to comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under contracts for commercial services and supplies.
The CDC states that employees, including contractors, with symptoms of influenza-like illness at work during a pandemic should leave the workplace. The CDC provides guidance for the workplace which OMB references in their COVID-19 guidance. The CDC recommends that employees who appear to have acute respiratory illness symptoms (i.e. cough, shortness of breath) upon arrival to work, or become sick during the day, should be sent home immediately. Additionally, if the employee is asymptomatic but tests positive, the employee should be sent home immediately. The responsible Contracting Officer must be notified immediately.
It is incumbent upon the contractor to familiarize themselves with Oklahoma’s state quarantine rules by visiting the latest information on the web. Suggested sites are listed below.
https://oklahoma.gov/covid19.html
B.6 VHA SUPPLEMENTAL CONTRCT REQUIREMENTS FOR COMBATTING COVID-19
VHA Supplemental…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .